User Tools

Site Tools


en:handbuch:kapitel_3:3.6._fortsetzung_5

previous Home next

3.06 Reportgenerator "ReportMaker" (continued 5)

Key Figures

Definition:

Key figures are consolidated values, which are calculated using algorithms from the document data or other key figures, and which describe a document. An ID as a unique identification is assigned for each key figure. Projectile supports key figures for the forms contact, project, jobs and employee.

The use of key figures in Projectile allows the user to create total values, values for any point in time and values for any time period. The values which are created by key figures are marked with a creation date, so that they can be stored and reused without a re-calculation. Furthermore, each key figure can be assigned to a document, and can be integrated by key figures in the screen views and in reports.

Usage:
After a project, a job or an employee has been chosen by using the search function in Projectile, clicking on “Report” opens the Report-Designer. Here are the key figures in the column “column content”, where they are identified by an asterisk. After one or several key figures have been selected, it is necessary to select '(periods)' in the same column. Then, a time interval should be defined for the key figures. Select the “time interval” in the drop down box, for example “current month”, and then select a period, for example, “weekly”. Additionally, the creation of new key figures for a defined period of time can be blocked by using the “Max figures age”.

Afterwards an aggregate type for forming sums for the key figures. In the row of the key figure, in the drop down box “Periodic”, select either “Total” = the entire static value including the non-visible values, “periodic” = the timed limit of the total value, “sum” = the sum of the visible values and “accumulated” = the sum of the periodical determined values.

After clicking save, go back to the dialog field, and also click save, an output format is selected and “Show Reports” is clicked. The report with the key figures is generated and is available for further usage.

Reference:

Customer Form:

Name Description Type SubTyp ID Standard yes/no
Incoming Invoice Incoming invoice amount of the contact, the sum of the contact, sum of the incoming invoice positions, which refer to the contact, Limit: date of the incoming invoice FLOAT IncomingInvoice_Tracked_Customer yes
Offer Tracked The basis of these key figures is the data of the offer. The net amounts of the offer values of all projects of the customer with the status “offer included” are calculated here. When limited, the date of offer is used. FLOAT MONEY Offer_Tracked_Customer yes
Order Value The order value of the supplier, sum of the order positions which refer to the supplier (gross amount), Limit: date of order FLOAT OrderValue_Tracked_Customer yes
Order Confirmation Tracked The basis of these key figures is the data of the order confirmation. The net amounts of the orders of all projects of the customer with the status “offer confirmation included” are calculated here. When limited, the date of the order is used. FLOAT MONEY OrderConfirmation_Tracked_Customer yes
Profitability Tracked Profitability = (revenue - costs) / revenue, revenue is the actual revenue and is estimated for fixed price projects based on the degree of completion. Basis of this calculation should not be the “pure” recorded time, but should be calculated in percentage - in relation to the daily working times of 8 hours. In the evaluation of fixed-price projects with the aid of the degree of completion, the true revenue is considered only with the final bill (fixed price or amount of payment invoices = 100%). For all other states (complete <100%), the fixed price (orders, if filled - otherwise offer value when filled - otherwise plan revenue after adding surcharges) is used and this value is multiplied with the degree of completion / 100. FLOAT Profitability_Tracked_Customer yes
Estimated Sales Order value in the sales pipeline multiplied with the probability FLOAT MONEY Sales_Estimated_Customer yes
Planned Sales Planned order value, order value in the sales pipeline FLOAT MONEY Sales_Planned_Customer yes
Supplier Budget Sum of the budgets of the order positions, which belong to the order of the suppliers. Budgets have no fixed date, but margin, overlapping charge FLOAT SupplierBudget_Tracked_Customer yes
Supplier Turnover Sum of the incoming invoice positions, which refer to the project and are included into the outgoing invoices. FLOAT SupplierTurnover_Tracked_Customer yes
Time Billed Billed effort/time from included job times, the time limit is based on the date entries of the billed time entries FLOAT MONEY Time_Billed_Customer yes
Turnover Tracked The basis of these key figures is the data of the invoice. The net amounts of the invoice amounts of all projects of the customer with the status “offer confirmation included” are calculated here. When limited (if existent), the time span of the service, otherwise the date of the invoice is used. FLOAT MONEY Turnover_Tracked_Customer yes

Project Form:

Name Description Type SubTyp ID Standard yes/no
Budget External Tracked Total ext. amounts of all budgets of the project, Span: fully or partially overlapping FLOAT BudgetExternal_Tracked_Project yes
BudgetInternalTracked Total internal amounts of all budgets of the project, Span: fully or partially overlapping FLOAT BudgetInternal_Tracked_Project yes
Planned Material Costs Total ext. amounts material cost-Budget of the project FLOAT BudgetMaterial_Tracked_Project no
Remaining Cost Remaining budget on the basis of the difference of actual time and target time, also external hourly rate FLOAT MONEY RemainingCost_Calculated_Project no
Budget Third Party Total ext. amounts FL-Budgets of a project FLOAT BudgetThirdParty_Tracked_Project no
Planned Travel Cost Total ext. amounts travel cost budgets of the project FLOAT BudgetTravel_Tracked_Project no
Completion Calculated Degree of completion by calculation, not based on estimates, but purely on the basis of plan and actual. The basis of this key figure is the quotient of actual and planned time or (if available) the final employee estimate less the thereafter recorded services. This data is determined for each job and summarized for the projects. When defining the time span, either the plan and actual time or the estimates of the jobs are used on a daily basis. FLOAT Completion_Calculated_Project yes
Completion Employee Estimated Key Figure: Degree of completion by employee estimate, i.e. estimates from TT. The basis of this figure is the tracking and recording system TimeTracker and the estimate completion dialog. Here, the remaining time and/or degree of completion for jobs are entered by the employee and, if necessary, corrected by the project manager in the dialog “estimate completion”. When defining the time span, the estimates are used per day. FLOAT Completion_EmployeeEstimated_Project yes
Completion Manager Estimated Key Figure: Degree of completion through the manager's estimate, i.e. from the states documents, which depends directly on the project. The basis of this key figure is the degree of completion of the project. When defining the time span, the estimates per deadline are used. FLOAT Completion_ManagerEstimated_Project yes
Cost Normalized This key figure calculates analogue to the key figure Work Cost Tracked* (project form), which multiplies the recorded actual time with the internal hourly rate of the employee. Basis of the calculation is not the “pure” recorded time, but the calculation of costs are in percentage - in relation to the daily working times of 8 hours. The time span is the date entries of the time recording. FLOAT MONEY Cost_Normalized_Project yes
Cost Material Tracked Total ext. amount of the costs FLOAT CostMaterial_Tracked_Project no
Misc Cost Tracked Total ext. other amounts of the costs FLOAT CostOther_Tracked_Project no
Cost Performance Estimated The CPI (Cost Performance Index) is the cost-related performance key figure of Earned Value Analysis. It is formed from the ratio of earned value and actual time. This means that with a CPI of greater than 1.00 (100%) the project results are rendered at a lower cost than originally planned, while a value of less than 1.00 (100%) exceeds the project's budget. Calculation: Planned time * degree of completion / actual time spent FLOAT CostPerformance_Estimated_Project yes
Planned Cost Total Total planned costs on the basis of jobs and budgets, internal costs FLOAT MONEY Cost_Planned_Project yes
Cost Tracked Internal job costs + costs from cost documents, such as receipts, driving, travel … The basis of this key figure is the tracking and recording entries (Time Tracker) and the cost recording (drive, receipt, travel, foreign costs and foreign invoices). Here, the work cost tracked* and all internal costs (net amounts) of the entries for driving, receipts, travel, foreign costs and foreign invoices are totaled. When defining a time span, the recorded time and cost receipts are used per day. FLOAT MONEY Cost_Tracked_Project yes
Cost Third Party Tracked Total ext. amounts of the costs FLOAT CostThirdParty_Tracked_Project no
Travel Cost Tracked Total ext. amounts of the costs FLOAT CostTravel_Tracked_Project no
End Tracked Key figure: end of time tracking, last time at which something has been recorded for a project, whether time, receipts, travel, travel, etc. DATE End_Tracked_Project no
Incoming Invoice Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice FLOAT IncomingInvoice_Tracked_Project yes
Incoming Invoice Net Incoming invoice of the project, the total of the invoice position items, which reference the project (net), Time span: Date of incoming invoice FLOAT IncomingInvoiceNet_Tracked_Project yes
Turnover Chargeable Considering all the benefits / costs (travel, trips, item sales, receipts, invoices) that can be billed in the invoice. If job hours need to be charged, they are multiplied by the external hourly rate. Basis of this key figure is the key figure „Chargeable Effort“. FLOAT MONEY Turnover_Chargeable_Project yes
Job Turnover Tracked The basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status “Invoice included”. If the time span is defined, the performance period is used, otherwise the invoice date is used. FLOAT MONEY JobTurnover_Tracked_Project yes
Misc Cost Tracked All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents FLOAT MONEY MiscCost_Tracked_Project yes
Offer Value The basis of this key figure is the data of the offer. Here, the net amounts of the offer value of the project with status “Offer included” are calculated. When defining the time span, the date of the offer is used. FLOAT MONEY Offer_Tracked_Project yes
Order Confirmation Value The basis of this figure is the data of the order confirmation. Here the net amounts of the orders of the project with status “Order Confirmation included” is calculated. When defining the time span, the date of the order is used. FLOAT MONEY OrderConfirmation_Tracked_Project yes
Order Value net Sum of order positions that reference the project, Time boundary: order date FLOAT OrderValueNet_Tracked_Project yes
Order Value Sum of order items that reference the project (gross), Time boundary: order date FLOAT OrderValue_Tracked_Project yes
Planned Working Days Project Passed These are the elapsed days between the planned beginning and planned end. Weekends are not counted, but public holidays are, Time span: planned start and planned end of the project FLOAT PassedWorkingDays_Planned_Project yes
Profitability Tracked Profitability = ( turnover - costs ) / turnover, Turnover is the actual turnover and is estimated for fixed-price projects based on the degree of completion. The basis of this calculation should not be the “pure” recorded time, but should be in percentage - with relation to the daily working time of 8 hours. \ \ In the evaluation of fixed-price projects using the degree of completion, the true turnover is only considered with the final bill (fixed price or total amount of advance payment invoices = 100%). For all other states (complete <100%) the fixed price (order value if filled - otherwise offer value when filled - otherwise planned turnover after surcharges) is used and this value is multiplied with the degree of completion / 100. FLOAT Profitability_Tracked_Project yes
Planned Project Position Project position amount, where documents of type project position be attached to a project) FLOAT ProjectPosition_Planned_Project no
Remaining Cost Employee Estimated The key figure is calculated from the employee estimates of the remaining time in the Time Tracker and the internal hourly rate FLOAT MONEY RemainingCost_EmployeeEstimated_Project yes
Remaining Time Employee Estimated The basis of this key figure is tracking and recording entry (TimeTracker) and the estimate completion dialog. Here the remaining time and/or degree of completion of jobs are entered by the employee and, if necessary corrected by the project manager in the dialog “Estimate completion”. When defining the time span, the estimates are used per day. FLOAT DURATION RemainingTime_EmployeeEstimated_Project yes
Start Tracked Start time recording, first time recording for the project, whether time, receipts, driving, travel, etc. DATE Start_Tracked_Project yes
Supplier Budget Sum of the budgets, which reference the order positions in the project. Budgets have no fixed date, but a margin, charge overlapping FLOAT SupplierBudget_Tracked_Project yes
Supplier Turnover Sum of the incoming invoice items, which reference the project and is included in the outgoing bills, Time Boundary: Invoice Date FLOAT SupplierTurnover_Tracked_Project yes
Billed Effort Sum of the jobs, the boundary is based on date entries of the billed time entries FLOAT DURATION Time_Billed_Project yes
Chargeable Effort The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here, the billable time of individual jobs is charged at the project level. In defining the time span, the time entries per day are used. FLOAT DURATION Time_Chargeable_Project yes
Time Performance Estimated Project Formula for calculation: (planned period (Total) * degree of completion) / Plan period (at the reporting date). The SPI (Schedule Performance Index) is the time-related performance key figure of earned value analysis. It is formed from the ratio of earned value and planned time/effort. This means that with an SPI greater than 1.00 (100%) the project results were delivered faster than originally planned, while a value of less than 1.00 (100%), the project is progressing too slowly. Calculation: the product of overall planned duration and degree of completion divided by the planned duration to the reporting period (to the project respectively) FLOAT TimePerformance_Estimated_Project yes
Planned Time The basis of this key figure is the project planning. Here, the planned time of the individual jobs are charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. FLOAT DURATION Time_Planned_Project yes
Planned Time Active The basis of this key figure is the project planning. Here, the planned time of the individual jobs are charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. FLOAT DURATION Time_PlannedActive_Project yes
Target Time The basis of this key figure is the project planning. Here, the target time/effort of the individual jobs is calculated at the project level. When defining a time span, the target time/effort of the jobs under the assumption of uniform distribution are calculated on a daily basis. FLOAT DURATION Time_Target_Project yes
Time Purchased Time from incoming invoices, time purchased ext. employee sum of hours from the incoming invoice positions, which is assigned a job. Boundary: Date of incoming invoice FLOAT DURATION Time_Purchased_Project yes
Actual Time Spent The basis of this key figure is the tracking and recording entry (TimeTracker). Here, the recorded times of the employee of the job is summarized at the project level. When defining a time span, the recorded times per day are used. FLOAT DURATION Time_Tracked_Project yes
Travel Cost Tracked The basis of this key figure is the travel expense entry (travel). Here, the net amounts of travel expense entry for each project are summarized. In defining the scheduled cost per day are used. When defining a time span, the recorded costs per day are used. FLOAT MONEY TravelCost_Tracked_Project yes
Travel Cost Tracked Gros The basis of this key figure is the travel expense entry (travel). Here are the gross amounts from the travel expense entry per project is summarized. When defining a time span, the recorded costs per day are used. FLOAT MONEY TravelCostGros_Tracked_Project yes
Turnover Chargeable All billable times multiplied by external hourly rate, i.e. which job times can be billed on the invoices FLOAT MONEY Turnover_Chargeable_Project yes
Turnover External Chargeable Calculating the costs based on the jobs of external employees in incoming invoice positions FLOAT MONEY TurnoverExternal_Chargeable_Project yes
Turnover Planned The basis of this key figure is project planning and order administration. If the order value is stored (order confirmation or manually) the planned turnover = order value (net), if the order value is not set, but the offer value is then planned turnover = offer value (net), otherwise the project turnover (project + surcharges) is used. FLOAT MONEY Turnover_Planned_Project yes
Invoice Value The basis of this key figure is the data of the invoice. Here, the net amount of the invoice amounts of the project with status “Invoice included” will be charged. If a time span is defined, the performance period is used, otherwise the invoice date is used. FLOAT MONEY Turnover_Tracked_Project yes
Work Cost Tracked The basis of this key figure is the tracking and recording entry (TimeTracker) and the internal hourly rate of the employee. Here, the recorded time (actual time) is multiplied with the internal hourly rates of the employee of the job (if existance from the employee contract, otherwise from the master data of the employee). When defining a time span, the recorded time per day are used. FLOAT MONEY WorkCost_Tracked_Project yes
Work Cost External Tracked Actual work effort external (for external staff). The costs are calculate based on the jobs in the incoming invoice positions FLOAT MONEY WorkCostExternal_Tracked_Project yes
Planned Working Days Project These are the days between the planned start and planned end. Weekends are not counted, but public holidays are FLOAT WorkingDays_Planned_Project yes
Tracked Working Days Project These are the days between the first and the last time recording. Weekends are not counted, but public holidays are FLOAT WorkingDays_Tracked_Project yes

Job Form:

Name Description Type SubTyp ID Standard yes/no
Completion Employee Estimated The basis of this figure is the tracking and recording entry (TimeTracker) and the estimate completion dialog. Here, the remaining time and/or degree of completion for jobs are entered by the employee and, if necessary, corrected by the project manager in the dialog „estimate completion“. When defining the time span, the estimates are used per day. FLOAT Completion_EmployeeEstimated_Job yes
Completion Calculated The basis of this key figure is the quotient of actual and planned time or (if available) the final employee estimate less the thereafter recorded services. When defining the time span, either the plan and actual time or the estimates of the jobs are used on a daily basis. FLOAT Completion_Calculated_Job yes
Cost Normalized The cost is based on actual times. These cost are allocate so (normalized), that the recorded time of the planned period corresponds to the day. Therefore, when times have been recorded in hours, there will always be 8.0 (if this was entered into the calendar). These hours are then multiplied by the internal rate FLOAT MONEY Cost_Normalized_Job yes
Planned Costs The basis of this key figure is project planning. Here, the key figure “planned time*” and the external hourly rates (see pricing) are multiplied. When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis. FLOAT MONEY Cost_Planned_Job yes
Cost Tracked The basis of this key figure is tracking and recording entry (TimeTracker). Here, the key figure “actual time*” and the internal hourly rates (see costing) are multiplied. When defining a time span, the recorded time per day is used. FLOAT MONEY Cost_Tracked_Job yes
Cost External Tracked Actual costs external (for external employees). The costs are calculated based on the jobs, using the incoming invoices for the job FLOAT MONEY CostExternal_Tracked_Job yes
End Tracked End time recording DATE End_Tracked_Job yes
Planned Working Days Passed These are the elapsed days between the planned start and planned end. Weekends are not counted, but public holidays are, Time span: planned start and planned end of the job FLOAT PassedWorkingDays_Planned_Job yes
Remaining Cost Calculated Remaining budget is based on the difference of actual time and target time and external hourly rate FLOAT MONEY RemainingCost_Calculated_Job no
Remaining Cost Employee Estimated Remaining costs through employee estimate FLOAT MONEY RemainingCost_EmployeeEstimated_Job no
Remaining Time Employee Estimated The basis of this key figure is tracking and recording entry (TimeTracker) and the estimate completion dialog. Here, the remaining time and/or degree of completion of the job is entered by the employee and, if necessary corrected by the project manager in the dialog „Estimate completion“. When defining the time span, the estimates are used per day. FLOAT DURATION RemainingTime_EmployeeEstimated_Job yes
Start Tracked Start time recording DATE Start_Tracked_Job yes
Time Billed Billed Time, in this context, the billable times on the job basis. Here, on the basis of the billed time entries and not on the invoice position basis. The boundary is based on date entries of the billed time entries FLOAT MONEY Time_Billed_Job yes
Chargeable Time The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here, the billable times of individual jobs is charged. In defining the time span, the time entries per day are used FLOAT DURATION Time_Chargeable_Job yes
Planned Time The basis of this key figure is the project planning. Here, the planned time of the job is defined. When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis. FLOAT DURATION Time_Planned_Job yes
Planned Time Active Projects As “Planned Time”, but only for running (active) projects FLOAT DURATION Time_PlannedActive_Job yes
Time Purchased Time from incoming invoices, time purchased ext. employee sum of hours from the incoming invoice positions, which is assigned a job. Boundary: Date of incoming invoice FLOAT DURATION Time_Purchased_Job yes
Target Time The basis of this key figure is the project planning. Here, the target time of the job is calculated. When defining a time span, the target time under the assumption of uniform distribution is calculated on a daily basis. FLOAT DURATION Time_Target_Job yes
Actual Time Spent The basis of this key figure is the tracking and recording entry (TimeTracker). Here, the recorded times of the employee of the job is used. When defining a time span, the recorded times per day are used. FLOAT DURATION Time_Tracked_Job yes
Turnover Calculated Employee turnover. Actually, this number is not a periodical key figure, it is only logical in an overall result sense. FLOAT MONEY Turnover_Calculated_Job no
Turnover Chargeable The basis of this key figure is the key figure “Chargeable Time *”. This key figure is multiplied with the external hourly rate of the job (see pricing). When defining a time span, the recorded times per day are used. FLOAT MONEY Turnover_Chargeable_Job yes
Turnover Chargeable external Calculating the costs based on the jobs of external employees in incoming invoice positions FLOAT MONEY TurnoverExternal_Chargeable_Job yes
Planned Time The basis of this key figure is the project planning. Here, the planned time of the job is multiplied with the external hourly rate (see pricing). When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis. FLOAT MONEY Turnover_Planned_Job yes
Turnover Tracked The basis of these key figures is the data of the invoice. The net amounts of the invoice positions based on the job with the status „Invoice included“ are defined here. When limited (if existent), the time span of the service is used, otherwise the date of the invoice is used. FLOAT MONEY Turnover_Tracked_Job yes
Planned Working Days Project These are the days between the planned beginning and planned end. Weekends are not counted, but public holidays are FLOAT WorkingDays_Planned_Job yes
Working Days_Tracked Project These are the days between the first and last time recording. Weekends are not counted, but public holidays are FLOAT WorkingDays_Tracked_Job yes

Employee:

Name Description Type SubTyp ID Standard yes/no
Cost Tracked The basis of this key figure is the key figure “work cost tracked*”, plus all recorded travel expenses, receipts, travel and foreign costs) of the employee. When defining a time span, the recorded times per day and the receipt date is used. FLOAT MONEY Cost_Tracked_Employee yes
Job Turnover Tracked The basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the employee with the status „Invoice included“. If the time span is defined, the performance period is used, otherwise the invoice date is used. FLOAT MONEY JobTurnover_Tracked_Employee yes
Turnover Tracked The basis of these key figures is “Job Turnover Tracked*”. The net amounts of all invoice positions based on all jobs of the employee with the status „Invoice included“, plus all billed costs of the employee (drive, receipt and travel) are defined here. When limited (if existent), the time span of the service is used, otherwise the date of the invoice is used. FLOAT MONEY Turnover_Tracked_Employee yes
Presence Planned This key figure determines the planned working time of the employee in the interval corresponding to the location (calendar), or (if existent) of the employee contract. FLOAT MONEY Presence_Planned_Employee yes
Start Tracked Start time recording, first time recording, also date of entered receipts, driving, travel, etc. DATE Start_Tracked_Employee yes
End Tracked End time recording, also date of entered receipts, driving, travel, etc. DATE End_Tracked_Employee yes
Flextime Entitlement Begin Flextime Entitlement Begin FLOAT Flextime_EntitlementBegin_Employee yes
Flextime Entitlement End Flextime Entitlement End FLOAT Flextime_EntitlementEnd_Employee yes
Incoming Invoice_Tracked Total of incoming invoice positions, which refer to the employee, Boundary: date of the incoming invoice FLOAT IncomingInvoice_Tracked_Employee yes
Order Value Tracked Total of the order positions, which refer (gros) to the employee, Boundary: Order date FLOAT OrderValue_Tracked_Employee yes
Supplier Budgets Sum of the budgets of order positions, which refer to the employee. Budgets have no fixed date, but have a margin, overlapping is calculated FLOAT SupplierBudget_Tracked_Employee yes
Supplier Turnover Sum of the incoming invoice positions, which refer to the employee and are included into the outgoing invoice, Boundary: invoice date FLOAT SupplierTurnover_Tracked_Employee yes
Billed Time Billed time from jobs of the employee, The time limit is based on the date entries of the billed time recording FLOAT MONEY Time_Billed_Employee yes
Chargeable Time The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here, the billable time of all jobs of the employee is charged. When defining the time span, the time entries per day are used. FLOAT DURATION Time_Chargeable_Employee yes
Planned Time The basis of this key figure is the project planning. Here, the planned time of the jobs of the employee are defined. When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis. FLOAT DURATION Time_Planned_Employee yes
Time Planned Active As „Planned Time“, but only for running (active) projects FLOAT DURATION Time_PlannedActive_Employee yes
Time Tracked The basis of this key figure is tracking and recording entry (TimeTracker). Here, the recorded time of all jobs of the employee are defined. When defining the time span, the recorded times per day are used. FLOAT DURATION Time_Tracked_Employee yes
Turnover Calculated Employee turnover. Actually, this number is not a periodical key figure, it is only logical in an overall result sense. FLOAT MONEY Turnover_Calculated_Employee no
Turnover Chargeable The basis of this key figure is the key figure „Chargeable Time*“. This key figure is multiplied with the external hourly rate of all jobs (see pricing). When defining the time span, the the time recording is used per day. FLOAT MONEY Turnover_Chargeable_Employee yes
Turnover Planned The basis of this key figure is project planning. Here, the planned time of all jobs of the project are multiplied with the external hourly rate (see pricing). When defining the time span, the planned time under the assumption of uniform distribution is calculated on a daily basis. FLOAT MONEY Turnover_Planned_Employee yes
Vacation Entitlement Begin Beginning of vacation entitlement FLOAT Vacation_EntitlementBegin_Employee yes
Vacation Entitlement End End of vacation entitlement FLOAT Vacation_EntitlementEnd_Employee yes
Vacation Paid Off Paid off vacation FLOAT Vacation_PaidOff_Employee yes
Cost Planned The basis of this key figure is the project planning. Here, the planned time of all jobs of the employee are defined. When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis. FLOAT MONEY WorkCost_Planned_Employee yes
Work Cost Planned This key figure is identical to “Cost Planned” at the present MONEY WorkCost_Planned_Employee yes
Work Cost Tracked The basis of this key figure is tracking and recording entry (TimeTracker). Here, the key figure “Actual Time Spent*” is multiplied with the internal hourly rate (see costing). When defining the time span, the the recorded time is used per day. FLOAT MONEY WorkCost_Tracked_Employee yes
Planned Working Days Working days, without weekends and without public holidays FLOAT WorkingDays_Planned_Employee yes

... continued page 6

en/handbuch/kapitel_3/3.6._fortsetzung_5.txt · Last modified: 2019/10/25 14:11 (external edit)