Table of Contents

Back Home Next

2.05.03 Gantt Chart

The Gantt Chart realizes the project-related bar chart evaluations. A Gantt chart is a diagram for visualizing the time planning of a project. The duration of a work package or project is symbolized by the length of the bar in the time axis. The bars can include both actual and plan data. Events or milestones are displayed as points in time. As parameters for the generated evaluations, the display options (via projects, work packages, milestones, with networking, with date) and the size of the generated JPG image are available for selection.

The mask consists of the following elements:

1. Name

2. Input Data

3. Main Parameters

4. Other Criteria

5. Settings for View

6. Results

This tab contains the maximum number of results and the results of evaluations already performed.