User Tools

Site Tools


en:handbuch:kapitel_4:4.12.4_fakturaauswertungen

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_4:4.12.4_fakturaauswertungen [2009/11/03 14:41]
192.168.0.76
en:handbuch:kapitel_4:4.12.4_fakturaauswertungen [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[4.12.3_mitarbeiter-_und_kapazitaetsauswertungen|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[en:​handbuch:​kapitel_a:​glossar|{{|next}}]] [[4.12.3_mitarbeiter-_und_kapazitaetsauswertungen|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[en:​handbuch:​kapitel_a:​glossar|{{|next}}]]
  
-====== 4.12.4 Assessment Chart ======+====== 4.12.04 Assessment Chart ======
  
-The assessment chart generates financial charts in the system. These include, the cost  evaluation (target/​actual comparisons, ​ budgets to costs  and in-depth charts), the general charts, ([[handbuch:​kapitel_2:​2.4.01_angebot| offers]], budgets, invoices, expenses, costs and cash flow, profit contribution,​ including in-depth charts), overviews of billable and billed services, a list of open entries and the results evaluation.+The assessment chart generates financial charts in the system. These include, the cost  evaluation (target/​actual comparisons, ​ budgets to costs  and in-depth charts), the general charts, ([[en:handbuch:​kapitel_2:​2.4.01_angebot| offers]], budgets, invoices, expenses, costs and cash flow, profit contribution,​ including in-depth charts), overviews of billable and billed services, a list of open entries and the results evaluation.
  
   
Line 12: Line 12:
 ... the functionality "​Charting"​. ... the functionality "​Charting"​.
  
-The chart "cost evaluation"​ supplies a complete overview of the budgets and the actual internal costs as target/​actual comparison. The budgets and costs are grouped by  [[handbuch:​kapitel_2:​2.01.10_key_-_kostenart|cost types]]. The internal budgets specify the internal costs based on the plan data of the [[handbuch:​kapitel_2:​2.02.04_arbeitspaket|jobs]] and from the [[handbuch:​kapitel_2:​2.02.09_budget|budget administration]]. The internal costs are defined through time recording ([[handbuch:​kapitel_2:​2.3.01_timetracker|TimeTracker]]) and  [[handbuch:​kapitel_2:​2.03_erfassungsmodul|costing]]. ​+The chart "cost evaluation"​ supplies a complete overview of the budgets and the actual internal costs as target/​actual comparison. The budgets and costs are grouped by  [[en:handbuch:​kapitel_2:​2.01.10_key_-_kostenart|cost types]]. The internal budgets specify the internal costs based on the plan data of the [en:handbuch:​kapitel_2:​2.02.04_arbeitspaket|jobs]] and from the [en:handbuch:​kapitel_2:​2.02.09_budget|budget administration]]. The internal costs are defined through time recording ([[en:handbuch:​kapitel_2:​2.3.01_timetracker|TimeTracker]]) and  [[en:handbuch:​kapitel_2:​2.03_erfassungsmodul|costing]]. ​
  
 The chart "​invoice evaluation"​ generates an overview of all invoice data and costing. The chart "​invoice evaluation"​ generates an overview of all invoice data and costing.
  
-Invoice data: The offer values (external net/​external total) and the internal offer value [[(handbuch:​kapitel_2:​2.4.01_angebot|offer]] is based on these internal costs), the internal and external budgets (from the [[handbuch:​kapitel_2:​2.02.04_arbeitspaket|jobs]] and the [[handbuch:​kapitel_2:​2.02.09_budget|budget administration)]],​ the [[handbuch:​kapitel_2:​2.4.11_rechnung|invoice amounts]] (external net/​external total) +Invoice data: The offer values (external net/​external total) and the internal offer value ([[en:handbuch:​kapitel_2:​2.4.01_angebot|offer]] is based on these internal costs), the internal and external budgets (from the [en:handbuch:​kapitel_2:​2.02.04_arbeitspaket|jobs]] and the [[en:handbuch:​kapitel_2:​2.02.09_budget|budget administration)]],​ the [[en:handbuch:​kapitel_2:​2.4.11_rechnung|invoice amounts]] (external net/​external total) 
-and the internal invoice value (billable time), the [[handbuch:​kapitel_2:​2.4.13_zahlungseingang|incoming payments]] and the open entries ​are listed.+and the internal invoice value (billable time), the [[en:handbuch:​kapitel_2:​2.4.13_zahlungseingang|incoming payments]] and the claim request ​are listed.
  
 +Cost data: The direct costs (travel costs, driving costs, receipt costs and external costs) and the external invoice, including outgoing payments and possibly, open liabilities are listed.
  
 +The chart "​billable project times evaluation"​ generates an overview of all estimated, ordered, rendered, billable and already billed project services, based on the recorded and billed times and costs. These charts are based on the projects.
  
-Kostendaten:​ Hier werden aus der Zeit- und Kostenerfassung die direkten Kosten (ReisekostenFahrtkostenBelegkosten und Fremdkosten) und die Fremdrechnungen inklusive Zahlungsausgänge und evtldie offenen Verbindlichkeiten aufgeführt.+The "​result evaluation"​ summarizes all internal costs and revenuesand calculates the project result. If no restriction regarding the projects is definedthe overhead costs are also considered and deducted accordinglyDetermining the invoice values and actual costs is analogous to the assessment chart.
  
-Die Auswertung ​"Fakturierte Zeiten (Projekte)" ​erzeugt eine Übersicht über alle geplanten, beauftragten,​ erbrachten, fakturierbaren und bereits fakturierten Projektleistungen auf Basis der erfassten und abgerechneten Zeiten und Kosten. Diese Auswertung basiert auf den Projekten. +The chart "open entries evaluation" ​generates a list of all yet (-partiallyopen itemsThis list displays both the incoming payments as well as the outgoing paymentswhich are still open or partially open
- +
-Die "​Ergebnisauswertung"​ fasst  alle betriebsinternen Kosten und Erlöse zusammen und errechnet das Projektergebnis. Wenn keine Einschränkung bezüglich der Projekte definiert wird, werden auch die Gemeinkosten berücksichtigt und entsprechend abgezogen. Die Bestimmung der Rechnungswerte und Ist-Kosten geschieht analog zur Fakturaauswertung. +
- +
-Die Auswertung "​Offene Posten"​ erzeugt eine Liste aller noch (teil-)offenen PostenDiese Liste zeigt sowohl die Zahlungsein- als auch Zahlungsausgänge die noch (teilweise) offen sind. +
- +
-Die Auswertung ´"​Fakturierbare Projektzeiten"​ erzeugt eine detaillierte Übersicht über alle erfassten und fakturierbaren Zeiten. Die Istaufwände kommen dabei direkt aus dem TimeTrackerdie Werte für die fakturierbaren Dauern entweder aus dem TimeTracker (wenn die entsprechende Option aktiv ist) oder aus der Funktionalität "​Fakturierbare Zeiten"​. Diese Variante listet die Projektzeiten projektweise auf und führt im unteren Teil die Einzelzeitnachweise mit den Bemerkungen auf. +
- +
- +
-(c) 1998-2007 Information Desire Software GmbHAlle Rechte vorbehalten!+
  
 +The chart "​billable project times evaluation"​ generates a detailed overview of all recorded and billable times. The actual time/effort comes directly from the TimeTracker,​ the values for the billable times come from either the Time Tracker (if the option is active) or from the functionality "​billable hours"​. This version lists the project times project-based and displays individual time sheets with the comments in the lower part.
en/handbuch/kapitel_4/4.12.4_fakturaauswertungen.1257255710.txt.gz · Last modified: 2019/10/25 14:09 (external edit)