 ====== 4.12 Chart System ====== ====== 4.12 Chart System ======
  
-===== 4.12.Applying Standard Charts ​ =====+ 
 +===== 4.12.01 Applying Standard Charts ===== 
  
 Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts. Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts.
Line 33: Line 35:
  
 ... pasted into the input data. ... pasted into the input data.
- 
  
 {{:​en:​handbuch:​kapitel_5:​project_chart5.1.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart5.1.gif|}}
Line 54: Line 55:
  
 {{:​en:​handbuch:​kapitel_5:​project_chart9.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart9.gif|}}
- +
 If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task). If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task).
  
Line 91: Line 92:
 {{:​en:​handbuch:​kapitel_5:​project_chart19.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart19.gif|}}
  
-In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected ​catagory), ...+In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected ​category), ...
  
 {{:​en:​handbuch:​kapitel_5:​project_chart20.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart20.gif|}}
Line 167: Line 168:
 {{:​en:​handbuch:​kapitel_5:​project_chart37.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart37.gif|}}
  
-**Notes:** The chart results are stored permanently only if the cahrt block is stored. The number of results can be set in the field "Max Number of Results"​.+**Notes:** The chart results are stored permanently only if the chart block is stored. The number of results can be set in the field "Max Number of Results"​.
  