| ====== 4.12 Chart System ====== | ====== 4.12 Chart System ====== | ||
| - | ===== 4.12.1 Applying Standard Charts ===== | + | |
| + | ===== 4.12.01 Applying Standard Charts ===== | ||
| Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts. | Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts. | ||
| Line 33: | Line 35: | ||
| ... pasted into the input data. | ... pasted into the input data. | ||
| - | |||
| {{:en:handbuch:kapitel_5:project_chart5.1.gif|}} | {{:en:handbuch:kapitel_5:project_chart5.1.gif|}} | ||
| Line 54: | Line 55: | ||
| {{:en:handbuch:kapitel_5:project_chart9.gif|}} | {{:en:handbuch:kapitel_5:project_chart9.gif|}} | ||
| - | + | ||
| If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task). | If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task). | ||
| Line 91: | Line 92: | ||
| {{:en:handbuch:kapitel_5:project_chart19.gif|}} | {{:en:handbuch:kapitel_5:project_chart19.gif|}} | ||
| - | In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected catagory), ... | + | In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected category), ... |
| {{:en:handbuch:kapitel_5:project_chart20.gif|}} | {{:en:handbuch:kapitel_5:project_chart20.gif|}} | ||
| Line 167: | Line 168: | ||
| {{:en:handbuch:kapitel_5:project_chart37.gif|}} | {{:en:handbuch:kapitel_5:project_chart37.gif|}} | ||
| - | **Notes:** The chart results are stored permanently only if the cahrt block is stored. The number of results can be set in the field "Max Number of Results". | + | **Notes:** The chart results are stored permanently only if the chart block is stored. The number of results can be set in the field "Max Number of Results". |