User Tools

Site Tools


en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen [2009/11/02 12:24]
admin
en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen [2019/10/25 14:11] (current)
Line 2: Line 2:
 ====== 4.12 Chart System ====== ====== 4.12 Chart System ======
  
-===== 4.12.Applying Standard Charts ​ =====+ 
 +===== 4.12.01 Applying Standard Charts ===== 
  
 Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts. Projectile contains many standard charts. The charts are grouped by topic in the chart blocks and contain between one and up to 13 individual charts.
Line 33: Line 35:
  
 ... pasted into the input data. ... pasted into the input data.
- 
  
 {{:​en:​handbuch:​kapitel_5:​project_chart5.1.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart5.1.gif|}}
Line 54: Line 55:
  
 {{:​en:​handbuch:​kapitel_5:​project_chart9.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart9.gif|}}
- +
 If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task). If the chart results are generated, the system presents the results in the browser. This chart includes information about the projects, activities and/or jobs and agents, the estimated and actual times with remaining time/effort and the corresponding difference (planned - actual), the estimated processing period (start / end) and the status information (status, completion date and completion of the task).
  
Line 91: Line 92:
 {{:​en:​handbuch:​kapitel_5:​project_chart19.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart19.gif|}}
  
-In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected ​catagory), ...+In the second example, the standard search engine is applied for selecting the input data. Here, for example, all projects (selected ​category), ...
  
 {{:​en:​handbuch:​kapitel_5:​project_chart20.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart20.gif|}}
Line 114: Line 115:
  
 {{:​en:​handbuch:​kapitel_5:​project_chart28.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart28.gif|}}
- 
  
 The third possibility to select the input data is the advanced search. The appropriate search queries are stored here, which can be immediately applied. ​ The third possibility to select the input data is the advanced search. The appropriate search queries are stored here, which can be immediately applied. ​
Line 150: Line 150:
 {{:​en:​handbuch:​kapitel_5:​project_chart36.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart36.gif|}}
  
-... and be generated in pdf format.+... can be generated in pdf format.
  
 {{:​en:​handbuch:​kapitel_5:​project_chart_download.gif|}}{{:​en:​handbuch:​kapitel_5:​open.gif|}}{{:​en:​handbuch:​kapitel_5:​size2.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart_download.gif|}}{{:​en:​handbuch:​kapitel_5:​open.gif|}}{{:​en:​handbuch:​kapitel_5:​size2.gif|}}
  
-Depending on the system settings, the generated chart in the browser ... +Depending on the system settings, the generated chart is opened ​in the browser ​ ...
- +
-Je nach Systemeinstellung öffnet sich die erzeugte Auswertung im Browser …+
  
 {{:​en:​handbuch:​kapitel_5:​project_chart_download3.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart_download3.gif|}}
  
-… oder im entsprechenden Anzeigeprogramm …+... or in the appropriate display program ...
  
 {{:​en:​handbuch:​kapitel_5:​project_chart_download4.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart_download4.gif|}}
  
-… (hier im Adobe Reader).+... (here in Adobe Reader).
  
-Im Reiter „Ergebnisse“ werden die Auswertungsergebnisse verwaltet.+In the "​Results"​ tab, the chart results are administered.
  
 {{:​en:​handbuch:​kapitel_5:​project_chart37.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart37.gif|}}
  
-AnmerkungenDie Auswertungsergebnisse werden nur dauerhaft gespeichert,​ wenn der Auswertungsblock abgespeichert istDie Anzahl der Ergebnisse kann im Feld „Max. Anzahl Ergebnisse“ eingestellt werden. +**Notes:** The chart results are stored permanently only if the chart block is storedThe number of results can be set in the field "Max Number of Results"​.
- +
-… Fortsetzung ​+
  
-(c) 1998-2007 Information Desire Software GmbH. Alle Rechte vorbehalten!+(c) 1998-2009 Information Desire Software GmbH. Alle Rechte vorbehalten!
  
en/handbuch/kapitel_4/4.12.1_bedienung_der_standardauswertungen.1257161046.txt.gz · Last modified: 2019/10/25 14:09 (external edit)