This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:handbuch:kapitel_3:3.6._fortsetzung_5 [2010/09/02 11:30] 192.168.0.2 |
en:handbuch:kapitel_3:3.6._fortsetzung_5 [2019/10/25 14:11] (current) |
||
---|---|---|---|
Line 60: | Line 60: | ||
| End Tracked | Key figure: end of time tracking, last time at which something has been recorded for a project, whether time, receipts, travel, travel, etc. | DATE | | End_Tracked_Project | no | | | End Tracked | Key figure: end of time tracking, last time at which something has been recorded for a project, whether time, receipts, travel, travel, etc. | DATE | | End_Tracked_Project | no | | ||
| Incoming Invoice | Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice | FLOAT | | IncomingInvoice_Tracked_Project | yes | | | Incoming Invoice | Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice | FLOAT | | IncomingInvoice_Tracked_Project | yes | | ||
- | | Incoming Invoice Net | Considering all the benefits / costs (travel, trips, item sales, receipts, invoices) that can be billed in the invoice. If job hours need to be charged, they are multiplied by the external hourly rate. Basis of this key figure is the key figure „Chargeable Effort“. | FLOAT | | IncomingInvoiceNet_Tracked_Project | yes | | + | | Incoming Invoice Net | Incoming invoice of the project, the total of the invoice position items, which reference the project (net), Time span: Date of incoming invoice | FLOAT | | IncomingInvoiceNet_Tracked_Project | yes | |
- | | Turnover Chargeable | All billable times multiplied by the hourly rates, i.e., job times which can be billed in invoices. The basis of this key figure is the key figure "Chargeable Time*". This key figure is multiplied with the external hourly rate of the job (see pricing). When defining the time span, the the time recording are used per day. | FLOAT | MONEY | Turnover_Chargeable_Project | yes | | + | | Turnover Chargeable | Considering all the benefits / costs (travel, trips, item sales, receipts, invoices) that can be billed in the invoice. If job hours need to be charged, they are multiplied by the external hourly rate. Basis of this key figure is the key figure „Chargeable Effort“. | FLOAT | MONEY | Turnover_Chargeable_Project | yes | |
| Job Turnover Tracked | The basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "Invoice included". If the time span is defined, the performance period is used, otherwise the invoice date is used. | FLOAT | MONEY | JobTurnover_Tracked_Project | yes | | | Job Turnover Tracked | The basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "Invoice included". If the time span is defined, the performance period is used, otherwise the invoice date is used. | FLOAT | MONEY | JobTurnover_Tracked_Project | yes | | ||
| Misc Cost Tracked | All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents | FLOAT | MONEY | MiscCost_Tracked_Project | yes | | | Misc Cost Tracked | All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents | FLOAT | MONEY | MiscCost_Tracked_Project | yes | |