Line 61: Line 61:
 |  Incoming Invoice ​ |  Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice ​ |  FLOAT  |  |  IncomingInvoice_Tracked_Project ​ |  yes  | |  Incoming Invoice ​ |  Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice ​ |  FLOAT  |  |  IncomingInvoice_Tracked_Project ​ |  yes  |
 |  Incoming Invoice Net  |   ​Incoming invoice of the project, the total of the  invoice position items, which reference the project (net), Time span: Date of incoming invoice ​ |  FLOAT  |  |  IncomingInvoiceNet_Tracked_Project ​ |  yes  | |  Incoming Invoice Net  |   ​Incoming invoice of the project, the total of the  invoice position items, which reference the project (net), Time span: Date of incoming invoice ​ |  FLOAT  |  |  IncomingInvoiceNet_Tracked_Project ​ |  yes  |
-|  Turnover Chargeable ​ |  ​All billable times multiplied by the hourly ratesi.e.job times which can be billed in invoicesThe basis of this key figure is the key figure ​"Chargeable ​Time*"​. This key figure is multiplied with the external hourly rate of the job (see pricing). When defining the time span, the the time recording are used per day.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Project ​ |  yes  |+|  Turnover Chargeable ​ |  ​Considering all the benefits / costs (traveltrips, item salesreceipts, invoices) that can be billed in the invoiceIf job hours need to be charged, they are multiplied by the external hourly rate. Basis of this key figure is the key figure ​Chargeable ​Effort“.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Project ​ |  yes  |
 |  Job Turnover Tracked ​ |  The  basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "​Invoice included"​. If the time span is defined, the performance period is used, otherwise the invoice date is used.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Project ​ |  yes  | |  Job Turnover Tracked ​ |  The  basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "​Invoice included"​. If the time span is defined, the performance period is used, otherwise the invoice date is used.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Project ​ |  yes  |
 |  Misc Cost Tracked ​ |  All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents ​ |  FLOAT  |  MONEY  |  MiscCost_Tracked_Project ​ |  yes  | |  Misc Cost Tracked ​ |  All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents ​ |  FLOAT  |  MONEY  |  MiscCost_Tracked_Project ​ |  yes  |
Line 76: Line 76:
 |  Supplier Budget ​ |  Sum of the budgets, ​ which reference the order positions in the project. Budgets have no fixed date, but a margin, ​ charge overlapping ​ |  FLOAT  |  |  SupplierBudget_Tracked_Project ​ |  yes  | |  Supplier Budget ​ |  Sum of the budgets, ​ which reference the order positions in the project. Budgets have no fixed date, but a margin, ​ charge overlapping ​ |  FLOAT  |  |  SupplierBudget_Tracked_Project ​ |  yes  |
 |  Supplier Turnover ​ |  Sum of the incoming invoice items, which reference the project and is included in the outgoing bills, Time Boundary: Invoice Date  |  FLOAT  |  |  SupplierTurnover_Tracked_Project ​ |  yes  | |  Supplier Turnover ​ |  Sum of the incoming invoice items, which reference the project and is included in the outgoing bills, Time Boundary: Invoice Date  |  FLOAT  |  |  SupplierTurnover_Tracked_Project ​ |  yes  |
-|  ​Time Billed ​ |  Sum of the jobs, the boundary is based on date entries of the billed time entries ​ |  FLOAT  |  ​MONEY  ​| ​ Time_Billed_Project ​ |  yes  | +|  Billed ​Effort ​ ​| ​ Sum of the jobs, the boundary is based on date entries of the billed time entries ​ |  FLOAT  |  ​DURATION ​ ​| ​ Time_Billed_Project ​ |  yes  | 
-|  Chargeable ​Time  ​| ​ The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here, the billable time of individual jobs is charged at the project level. In defining the time span, the time entries per day are used.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Project ​ |  yes  |+|  Chargeable ​Effort ​ ​| ​ The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here, the billable time of individual jobs is charged at the project level. In defining the time span, the time entries per day are used.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Project ​ |  yes  |
 |  Time Performance Estimated Project ​ |  Formula for calculation:​ (planned period (Total) * degree of completion) / Plan period (at the reporting date). The SPI (Schedule Performance Index) is the time-related performance key figure of earned value analysis. It is formed from the ratio of earned value and planned time/​effort. This means that with an SPI greater than 1.00 (100%) the project results were delivered faster than originally planned, while a value of less than 1.00 (100%), the project is progressing too slowly. Calculation:​ the product of overall planned duration and degree of completion divided by the planned duration to the reporting period (to the project respectively) |  FLOAT  |  |  TimePerformance_Estimated_Project ​ |  yes  | |  Time Performance Estimated Project ​ |  Formula for calculation:​ (planned period (Total) * degree of completion) / Plan period (at the reporting date). The SPI (Schedule Performance Index) is the time-related performance key figure of earned value analysis. It is formed from the ratio of earned value and planned time/​effort. This means that with an SPI greater than 1.00 (100%) the project results were delivered faster than originally planned, while a value of less than 1.00 (100%), the project is progressing too slowly. Calculation:​ the product of overall planned duration and degree of completion divided by the planned duration to the reporting period (to the project respectively) |  FLOAT  |  |  TimePerformance_Estimated_Project ​ |  yes  |
 |  Planned Time  |   The basis of this key figure is the project planning. Here, the planned time of the individual jobs are  charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. ​  ​| ​ FLOAT  |  DURATION ​ |  Time_Planned_Project ​ |  yes  | |  Planned Time  |   The basis of this key figure is the project planning. Here, the planned time of the individual jobs are  charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. ​  ​| ​ FLOAT  |  DURATION ​ |  Time_Planned_Project ​ |  yes  |