User Tools

Site Tools


en:handbuch:kapitel_3:3.6._fortsetzung_5

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_3:3.6._fortsetzung_5 [2009/12/22 16:08]
192.168.0.76
en:handbuch:kapitel_3:3.6._fortsetzung_5 [2019/10/25 14:11] (current)
Line 1: Line 1:
-[[|{{|previous}}]] [[handbuch:​handbuch|{{|Home}}]] [[|{{|next}}]]+[[|{{|previous}}]] [[en:handbuch:​handbuch|{{|Home}}]] [[|{{|next}}]]
 ====== 3.06 Reportgenerator "​ReportMaker"​ (continued 5) ====== ====== 3.06 Reportgenerator "​ReportMaker"​ (continued 5) ======
  
Line 47: Line 47:
 |  Budget Third Party  |  Total ext. amounts FL-Budgets of a project ​ |  FLOAT  |  |  BudgetThirdParty_Tracked_Project ​ |  no  | |  Budget Third Party  |  Total ext. amounts FL-Budgets of a project ​ |  FLOAT  |  |  BudgetThirdParty_Tracked_Project ​ |  no  |
 |  Planned Travel Cost  |  Total ext. amounts travel cost budgets of the project ​ |  FLOAT  |  |  BudgetTravel_Tracked_Project ​ |  no  | |  Planned Travel Cost  |  Total ext. amounts travel cost budgets of the project ​ |  FLOAT  |  |  BudgetTravel_Tracked_Project ​ |  no  |
-|  Completion Calculated ​ |  Degree of completion by calculation,​ not based on estimates, but purely on the basis of plan and actual. The basis of this  key figure is the quotient of actual and planned time or (if available) the final employee estimate less the  thereafter recorded services. This data is determined for each job and condensed to the projects. When defining the time span, either the plan and actual time or the estimates of the jobs are used on a daily basis. ​ |  FLOAT  |  |  Completion_Calculated_Project ​ |  yes  |+|  Completion Calculated ​ |  Degree of completion by calculation,​ not based on estimates, but purely on the basis of plan and actual. The basis of this  key figure is the quotient of actual and planned time or (if available) the final employee estimate less the  thereafter recorded services. This data is determined for each job and summarized for the projects. When defining the time span, either the plan and actual time or the estimates of the jobs are used on a daily basis. ​ |  FLOAT  |  |  Completion_Calculated_Project ​ |  yes  |
 |  Completion Employee Estimated ​ |  Key Figure: Degree of completion by employee estimate, i.e. estimates from TT. The basis of this figure is the tracking and recording system TimeTracker and the estimate completion dialog. Here, the remaining time and/or degree of completion for jobs are entered by the employee and, if necessary, corrected by the project manager in the dialog "​estimate completion"​. When defining the time span, the estimates are used per day.  |  FLOAT  |  |  Completion_EmployeeEstimated_Project ​ |  yes  | |  Completion Employee Estimated ​ |  Key Figure: Degree of completion by employee estimate, i.e. estimates from TT. The basis of this figure is the tracking and recording system TimeTracker and the estimate completion dialog. Here, the remaining time and/or degree of completion for jobs are entered by the employee and, if necessary, corrected by the project manager in the dialog "​estimate completion"​. When defining the time span, the estimates are used per day.  |  FLOAT  |  |  Completion_EmployeeEstimated_Project ​ |  yes  |
 |  Completion Manager Estimated ​ |  Key Figure: Degree of completion through the manager'​s estimate, i.e. from the states documents, which depends directly on the project. The basis of this key figure is the degree of completion of the project. When defining the time span, the estimates per deadline are used.  |  FLOAT  |  |  Completion_ManagerEstimated_Project ​ |  yes  | |  Completion Manager Estimated ​ |  Key Figure: Degree of completion through the manager'​s estimate, i.e. from the states documents, which depends directly on the project. The basis of this key figure is the degree of completion of the project. When defining the time span, the estimates per deadline are used.  |  FLOAT  |  |  Completion_ManagerEstimated_Project ​ |  yes  |
-|  Cost Normalized ​ | This key figure calculates ​ analogue to the key figure Work Cost Tracked* (project form), which multiplies the recorded actual time with the internal hourly rate of the employee. Basis of the calculation is not the "​pure"​ recorded time, but the calculation of costs are in percentage - in relation to the daily working times of 8 hours. The time span is the date entries of the time recording. |  FLOAT  |MONEY ​ |  Cost_Normalized_Project ​ |  yes  |+|  Cost Normalized ​ | This key figure calculates ​ analogue to the key figure Work Cost Tracked* (project form), which multiplies the recorded actual time with the internal hourly rate of the employee. Basis of the calculation is not the "​pure"​ recorded time, but the calculation of costs are in percentage - in relation to the daily working times of 8 hours. The time span is the date entries of the time recording. |  FLOAT  |  MONEY  |  Cost_Normalized_Project ​ |  yes  |
 |  Cost Material Tracked ​ |  Total ext. amount of the costs  |  FLOAT  |  |  CostMaterial_Tracked_Project ​ |  no  | |  Cost Material Tracked ​ |  Total ext. amount of the costs  |  FLOAT  |  |  CostMaterial_Tracked_Project ​ |  no  |
 |  Misc Cost Tracked ​ |  Total ext. other amounts of the costs   ​| ​ FLOAT  |  |  CostOther_Tracked_Project ​ |  no  | |  Misc Cost Tracked ​ |  Total ext. other amounts of the costs   ​| ​ FLOAT  |  |  CostOther_Tracked_Project ​ |  no  |
Line 56: Line 56:
 |  Planned Cost Total  |  Total planned costs on the basis of jobs and budgets, internal costs  |  FLOAT  |  MONEY  |  Cost_Planned_Project ​ |  yes  | |  Planned Cost Total  |  Total planned costs on the basis of jobs and budgets, internal costs  |  FLOAT  |  MONEY  |  Cost_Planned_Project ​ |  yes  |
 |  Cost Tracked ​ |  Internal job costs + costs from cost documents, such as receipts, driving, travel ...  The basis of this key figure is the tracking and recording entries (Time Tracker) and the cost recording (drive, receipt, travel, foreign costs and foreign invoices). Here, the work cost tracked* and all internal costs (net amounts) of the entries for driving, receipts, travel, foreign costs and foreign invoices are totaled. When defining a time span, the recorded time and cost receipts are used per day.  |  FLOAT  |  MONEY  |  Cost_Tracked_Project ​ |  yes  | |  Cost Tracked ​ |  Internal job costs + costs from cost documents, such as receipts, driving, travel ...  The basis of this key figure is the tracking and recording entries (Time Tracker) and the cost recording (drive, receipt, travel, foreign costs and foreign invoices). Here, the work cost tracked* and all internal costs (net amounts) of the entries for driving, receipts, travel, foreign costs and foreign invoices are totaled. When defining a time span, the recorded time and cost receipts are used per day.  |  FLOAT  |  MONEY  |  Cost_Tracked_Project ​ |  yes  |
-|  Cost Third Party Tracked ​ |  Total ext. amounts of the costs |  FLOAT  |  |  CostThirdParty_Tracked_Project ​ |  no  |+|  Cost Third Party Tracked ​ |   ​Total ext. amounts of the costs  |  FLOAT  |  |  CostThirdParty_Tracked_Project ​ |  no  |
 |  Travel Cost Tracked ​ |  Total ext. amounts of the costs   ​| ​ FLOAT  |  |  CostTravel_Tracked_Project ​ |  no  | |  Travel Cost Tracked ​ |  Total ext. amounts of the costs   ​| ​ FLOAT  |  |  CostTravel_Tracked_Project ​ |  no  |
 |  End Tracked ​ |  Key figure: end of time tracking, last time at which something has been recorded for a project, whether time, receipts, travel, travel, etc.  |  DATE  |  |  End_Tracked_Project ​ |  no  | |  End Tracked ​ |  Key figure: end of time tracking, last time at which something has been recorded for a project, whether time, receipts, travel, travel, etc.  |  DATE  |  |  End_Tracked_Project ​ |  no  |
 |  Incoming Invoice ​ |  Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice ​ |  FLOAT  |  |  IncomingInvoice_Tracked_Project ​ |  yes  | |  Incoming Invoice ​ |  Incoming invoice of the project, the total of the incoming invoice position items that reference the project, Time span: the date of the incoming invoice ​ |  FLOAT  |  |  IncomingInvoice_Tracked_Project ​ |  yes  |
 |  Incoming Invoice Net  |   ​Incoming invoice of the project, the total of the  invoice position items, which reference the project (net), Time span: Date of incoming invoice ​ |  FLOAT  |  |  IncomingInvoiceNet_Tracked_Project ​ |  yes  | |  Incoming Invoice Net  |   ​Incoming invoice of the project, the total of the  invoice position items, which reference the project (net), Time span: Date of incoming invoice ​ |  FLOAT  |  |  IncomingInvoiceNet_Tracked_Project ​ |  yes  |
-|  Turnover Chargeable ​ |  ​All billable times multiplied by the hourly ratesi.e.job times which can be billed in invoicesThe basis of this key figure is the key figure ​"Chargeable ​Time*"​. This key figure is multiplied with the external hourly rate of the job (see pricing). When defining the time span, the the time recording are used per day.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Project ​ |  yes  |+|  Turnover Chargeable ​ |  ​Considering all the benefits / costs (traveltrips, item salesreceipts, invoices) that can be billed in the invoiceIf job hours need to be charged, they are multiplied by the external hourly rate. Basis of this key figure is the key figure ​Chargeable ​Effort“.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Project ​ |  yes  |
 |  Job Turnover Tracked ​ |  The  basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "​Invoice included"​. If the time span is defined, the performance period is used, otherwise the invoice date is used.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Project ​ |  yes  | |  Job Turnover Tracked ​ |  The  basis of this key figure is the data of the invoice. Here the net amounts of the position items are calculated based on jobs of the project with the status "​Invoice included"​. If the time span is defined, the performance period is used, otherwise the invoice date is used.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Project ​ |  yes  |
 |  Misc Cost Tracked ​ |  All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents ​ |  FLOAT  |  MONEY  |  MiscCost_Tracked_Project ​ |  yes  | |  Misc Cost Tracked ​ |  All costs except work costs: item sales, trips, travel, receipts, Time span: Date entris of the cost documents ​ |  FLOAT  |  MONEY  |  MiscCost_Tracked_Project ​ |  yes  |
Line 76: Line 76:
 |  Supplier Budget ​ |  Sum of the budgets, ​ which reference the order positions in the project. Budgets have no fixed date, but a margin, ​ charge overlapping ​ |  FLOAT  |  |  SupplierBudget_Tracked_Project ​ |  yes  | |  Supplier Budget ​ |  Sum of the budgets, ​ which reference the order positions in the project. Budgets have no fixed date, but a margin, ​ charge overlapping ​ |  FLOAT  |  |  SupplierBudget_Tracked_Project ​ |  yes  |
 |  Supplier Turnover ​ |  Sum of the incoming invoice items, which reference the project and is included in the outgoing bills, Time Boundary: Invoice Date  |  FLOAT  |  |  SupplierTurnover_Tracked_Project ​ |  yes  | |  Supplier Turnover ​ |  Sum of the incoming invoice items, which reference the project and is included in the outgoing bills, Time Boundary: Invoice Date  |  FLOAT  |  |  SupplierTurnover_Tracked_Project ​ |  yes  |
-|  ​Time Billed ​ |  Sum of the jobs, the boundary is based on date entries of the billed time entries ​ |  FLOAT  |  ​MONEY  ​| ​ Time_Billed_Project ​ |  yes  | +|  Billed ​Effort ​ ​| ​ Sum of the jobs, the boundary is based on date entries of the billed time entries ​ |  FLOAT  |  ​DURATION ​ ​| ​ Time_Billed_Project ​ |  yes  | 
-|  Chargeable ​Time  ​| ​ The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Here are the billable ​hours of individual jobs is charged at the project level. In defining the time span, the time entries per day are used.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Project ​ |  yes  |+|  Chargeable ​Effort ​ ​| ​ The basis of this key figure is tracking and recording entry (TimeTracker) and the evaluation of chargeable services. Herethe billable ​time of individual jobs is charged at the project level. In defining the time span, the time entries per day are used.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Project ​ |  yes  |
 |  Time Performance Estimated Project ​ |  Formula for calculation:​ (planned period (Total) * degree of completion) / Plan period (at the reporting date). The SPI (Schedule Performance Index) is the time-related performance key figure of earned value analysis. It is formed from the ratio of earned value and planned time/​effort. This means that with an SPI greater than 1.00 (100%) the project results were delivered faster than originally planned, while a value of less than 1.00 (100%), the project is progressing too slowly. Calculation:​ the product of overall planned duration and degree of completion divided by the planned duration to the reporting period (to the project respectively) |  FLOAT  |  |  TimePerformance_Estimated_Project ​ |  yes  | |  Time Performance Estimated Project ​ |  Formula for calculation:​ (planned period (Total) * degree of completion) / Plan period (at the reporting date). The SPI (Schedule Performance Index) is the time-related performance key figure of earned value analysis. It is formed from the ratio of earned value and planned time/​effort. This means that with an SPI greater than 1.00 (100%) the project results were delivered faster than originally planned, while a value of less than 1.00 (100%), the project is progressing too slowly. Calculation:​ the product of overall planned duration and degree of completion divided by the planned duration to the reporting period (to the project respectively) |  FLOAT  |  |  TimePerformance_Estimated_Project ​ |  yes  |
 |  Planned Time  |   The basis of this key figure is the project planning. Here, the planned time of the individual jobs are  charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. ​  ​| ​ FLOAT  |  DURATION ​ |  Time_Planned_Project ​ |  yes  | |  Planned Time  |   The basis of this key figure is the project planning. Here, the planned time of the individual jobs are  charged at the project level. When defining a time span, the planned time of the jobs under the assumption of uniform distribution are calculated on a daily basis. ​  ​| ​ FLOAT  |  DURATION ​ |  Time_Planned_Project ​ |  yes  |
Line 93: Line 93:
 |  Work Cost External Tracked ​ |  Actual work effort external (for external staff). The costs are calculate based on the jobs in the  incoming invoice positions ​ |  FLOAT  |  MONEY  |  WorkCostExternal_Tracked_Project ​ |  yes  | |  Work Cost External Tracked ​ |  Actual work effort external (for external staff). The costs are calculate based on the jobs in the  incoming invoice positions ​ |  FLOAT  |  MONEY  |  WorkCostExternal_Tracked_Project ​ |  yes  |
 |  Planned Working Days Project ​ |  These are the days between the planned start and planned end. Weekends are not counted, but public holidays are  |  FLOAT  |  |  WorkingDays_Planned_Project ​ |  yes  | |  Planned Working Days Project ​ |  These are the days between the planned start and planned end. Weekends are not counted, but public holidays are  |  FLOAT  |  |  WorkingDays_Planned_Project ​ |  yes  |
-|  Tracked Working Days Project ​ |  These are the days between the first and the last time recording. Weekends are not counted, but public holidays are  |  FLOAT  |  |  WorkingDays_Tracked_Project ​ |  yes  |file:///​home/​katrina/​Desktop/​Bildschirmfoto-%C3%84nderungsantrag+|  Tracked Working Days Project ​ |  These are the days between the first and the last time recording. Weekends are not counted, but public holidays are  |  FLOAT  |  |  WorkingDays_Tracked_Project ​ |  yes  |
  
  
Line 101: Line 101:
  
 ^  Name  ^  Description ​ ^  Type  ^  SubTyp ​ ^  ID  ^  Standard yes/​no ​ ^  ​ ^  Name  ^  Description ​ ^  Type  ^  SubTyp ​ ^  ID  ^  Standard yes/​no ​ ^  ​
-|  Completion Employee Estimated ​ |  Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker) ​und der Dialog Fertigstellung schätzenHier werden die Restaufwände und/oder Fertigstellungsgrade des Arbeitspaketes vom Mitarbeiter eingegeben und ggfvom Projektleiter im Dialog "​Fertigstellung schätzen"​ korrigiert. Bei der Abgrenzung werden die Schätzungen pro Tag herangezogen.  |  FLOAT  |  |  Completion_EmployeeEstimated_Job ​ |  yes  | +|  Completion Employee Estimated ​ |   The basis of this figure is the tracking and recording entry (TimeTracker) ​and the estimate completion dialogHere, the remaining time and/or degree of completion for jobs are entered by the employee and, if necessary, corrected by the project manager in the dialog „estimate completion“When defining the time span, the estimates are used per day.  |  FLOAT  |  |  Completion_EmployeeEstimated_Job ​ |  yes  | 
-|  Completion Calculated ​ |  Basis dieser Kennzahl ist der Quotient aus Ist- und Plan-Aufwand oder (wenn vorhandendie letzte Mitarbeiterschätzung abzüglich der danach erfassten LeistungenBei Abgrenzung werden die entweder die Plan- und Istaufwände oder die Schätzungen der Arbeitspakete auf Tagesbasis herangezogen.  |  FLOAT  |  |  Completion_Calculated_Job ​ |  yes  | +|  Completion Calculated ​ |   The basis of this key figure is the quotient of actual and planned time or (if availablethe final employee estimate less the thereafter recorded services When defining the time span, either the plan and actual time or the estimates of the jobs are used on a daily basis.  |  FLOAT  |  |  Completion_Calculated_Job ​ |  yes  | 
-|  Cost Normalized ​ |  ​Kosten basierend auf Ist-ZeitenDiese werden aber so umgelegt ​(normalisiert), dass die erfasste Zeit der Plan-Dauer des Tages entsprichtWenn also in Stunden erfasst wurdenso werden daraus immer 8.0 (wenn das so im Kalender steht).  Diese Stunden werden dann mit internem Satz multipliziert ​ ​| ​ FLOAT  |  MONEY  |  Cost_Normalized_Job ​ |  yes  | +|  Cost Normalized ​ |   The cost is based on actual timesThese cost are allocate ​so (normalized), that the recorded time of the planned period corresponds to the dayTherefore, when times have been recorded ​in hoursthere will always be 8.0 (if this was entered into the calendar). These hours are then multiplied by the internal rate  ​| ​ FLOAT  |  MONEY  |  Cost_Normalized_Job ​ |  yes  | 
-|  Planned Costs  |  Basis dieser Kennzahl ist die ProjektplanungHier werden die Kennzahl ​"Plan-Aufwand ​*" ​und der externen Stundensatz  ​(siehe PreisfindungmultipliziertBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  MONEY  |  Cost_Planned_Job ​ |  yes  | +|  Planned Costs  |   The basis of this key figure is project planningHere, the key figure ​"planned time*" ​and the external hourly rates (see pricingare multipliedWhen defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis.  |  FLOAT  |  MONEY  |  Cost_Planned_Job ​ |  yes  | 
-|  Cost Tracked ​ |  ​Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker). ​Hier werden die Kennzahl ​"Ist-Zeit ​*" ​und der internen Stundensatz  ​(siehe KostenfindungmultipliziertBei Abgrenzung werden die erfassten Zeiten pro Tag herangezogen.  |  FLOAT  |  MONEY  |  Cost_Tracked_Job ​ |  yes  | +|  Cost Tracked ​ |  ​The basis of this key figure is tracking and recording entry (TimeTracker). ​Here, the key figure ​"actual time*" ​and the internal hourly rates (see costingare multipliedWhen defining a time span, the recorded time per day is used.  |  FLOAT  |  MONEY  |  Cost_Tracked_Job ​ |  yes  | 
-|  Cost External Tracked ​ |  ​Ist-Kosten extern ​(für externe Mitarbeiter). Berechnung der Kosten auf Basis der Arbeitspakete mit Verwendung der Eingangsrechnungen des Jobs  ​| ​ FLOAT  |  MONEY  |  CostExternal_Tracked_Job ​ |  yes  | +|  Cost External Tracked ​ |  ​Actual costs external ​(for external employees). The costs are calculated based on the jobs, using the incoming invoices for the job  ​| ​ FLOAT  |  MONEY  |  CostExternal_Tracked_Job ​ |  yes  | 
-|  End Tracked ​ |  ​Ende Zeiterfassung ​ ​| ​ DATE  |  |  End_Tracked_Job ​ |  yes  | +|  End Tracked ​ |  ​End time recording ​ ​| ​ DATE  |  |  End_Tracked_Job ​ |  yes  | 
-|  ​Plan-Projekttage (verstrichen)  ​|  ​Dies sind die vergangenen Tage zwischen Planbeginn und -endeWochenenden werden nicht mitgezähltgesetzliche Feiertage jedoch schon Abgrenzung: Plan-Beginn und  Plan-Ende des Arbeitspaketes ​ ​| ​ FLOAT  |  |  PassedWorkingDays_Planned_Job ​ |  yes  | +|  ​Planned Working Days Passed ​    These are the elapsed ​ days between the planned start and planned endWeekends are not countedbut  public holidays are, Time span: planned start and planned end of the job  ​| ​ FLOAT  |  |  PassedWorkingDays_Planned_Job ​ |  yes  | 
-|  Remaining Cost Calculated ​ |  ​Restbudget auf Basis Differenz Ist-Zeit und Soll-Zeit sowie externem Stundensatz ​ ​| ​ FLOAT  |  MONEY  |  RemainingCost_Calculated_Job ​ |  no  | +|  Remaining Cost Calculated ​ |  ​Remaining budget is based on the difference of actual time and target time and external hourly rate  ​| ​ FLOAT  |  MONEY  |  RemainingCost_Calculated_Job ​ |  no  | 
-|  Remaining Cost Employee Estimated ​ |  ​Restkosten nach Mitarbeiterschätzung  ​|  FLOAT  |  MONEY  |  RemainingCost_EmployeeEstimated_Job ​ |  no  | +|  Remaining Cost Employee Estimated ​ |  ​Remaining costs through employee estimate ​  |  FLOAT  |  MONEY  |  RemainingCost_EmployeeEstimated_Job ​ |  no  | 
-|  Remaining Time Employee Estimated ​ |  Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker) ​und der Dialog Fertigstellung schätzenHier werden die Restaufwände und/oder Fertigstellungsgrade des Arbeitspaketes vom Mitarbeiter eingegeben und ggfvom Projektleiter im Dialog "​Fertigstellung schätzen"​ korrigiert. Bei Abgrenzung werden die Schätzungen pro Tag herangezogen.  |  FLOAT  |  DURATION ​ |  RemainingTime_EmployeeEstimated_Job ​ |  yes  | +|  Remaining Time Employee Estimated ​ |   The basis of this key figure is tracking and recording entry (TimeTracker) ​and the estimate completion dialogHere, the remaining time and/or degree of completion of the job is entered by the employee and, if necessary corrected by the project manager in the dialog „Estimate completion“When defining the time span, the estimates are used per day.  |  FLOAT  |  DURATION ​ |  RemainingTime_EmployeeEstimated_Job ​ |  yes  | 
-|  Start Tracked ​ |  ​Beginn Zeiterfassung ​ ​| ​ DATE  |  |  Start_Tracked_Job ​ |  yes  | +|  Start Tracked ​ |  ​Start time recording ​ ​| ​ DATE  |  |  Start_Tracked_Job ​ |  yes  | 
-|  Time Billed ​ |  Billed Time, in diesem Kontext die fakturierten Zeiten auf JobbasisHierbei auf Basis der fakturierten Zeiterfassungen und _nicht_ auf RechnungspositionsbasisAbgrenzung basiert auf den Datumseinträgen der fakturierten Zeiterfassungen ​ ​| ​ FLOAT  |  MONEY  |  Time_Billed_Job ​ |  yes  | +|  Time Billed ​ |  Billed Time, in this context, the billable times on the job basisHereon the  basis of the billed time entries and not on the invoice position basis. The boundary is based on date entries of the billed time entries ​ ​| ​ FLOAT  |  MONEY  |  Time_Billed_Job ​ |  yes  | 
-|  Chargeable Time  |  ​Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker) ​und die Bewertung der fakturierbaren LeistungenHier werden die abrechenbaren Zeiten des Arbeitspaketes berechnet. Bei Abgrenzung werden die Zeiterfassungen pro Tag herangezogen.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Job ​ |  yes  | +|  Chargeable Time  |  ​The basis of this key figure is tracking and recording entry (TimeTracker) ​and the evaluation of chargeable servicesHere, the billable times of individual jobs is chargedIn defining the time span, the time entries per day are used  ​| ​ FLOAT  |  DURATION ​ |  Time_Chargeable_Job ​ |  yes  | 
-|  Planned Time  |  ​Basis dieser Kennzahl ist die ProjektplanungHier wird der Planaufwand des Arbeitspaketes  bestimmtBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  DURATION ​ |  Time_Planned_Job ​ |  yes  | +|  Planned Time  |  ​The basis of this key figure is the project planningHere, the planned time of the job is definedWhen defining a time span, the planned time  under the assumption of uniform distribution are calculated on a daily basis.  |  FLOAT  |  DURATION ​ |  Time_Planned_Job ​ |  yes  | 
-|  Planned Time Active Projects ​ |  ​Wie „Plan-Aufwand", ​nur für laufende ​(aktiveProjekte ​ ​| ​ FLOAT  |  DURATION ​ |  Time_PlannedActive_Job ​ |  yes  | +|  Planned Time Active Projects ​ |  ​As "​Planned Time", ​but only for running ​(activeprojects ​ ​| ​ FLOAT  |  DURATION ​ |  Time_PlannedActive_Job ​ |  yes  | 
-|  Time Purchased ​ |  ​Zeiten aus Eingangsrechnungenzugekauft Zeit ext. MA Summe von Stunden aus Eingangsrechnungspositionenwo Job zugewiesen ist, AbgrenzungDatum der Eingangsrechnung ​ ​| ​ FLOAT  |  DURATION ​ |  Time_Purchased_Job ​ |  yes  | +|  Time Purchased ​ |  ​Time from incoming invoicestime purchased ​ext. employee sum of hours from the incoming invoice positionswhich is assigned a job. BoundaryDate of incoming invoice ​ ​| ​ FLOAT  |  DURATION ​ |  Time_Purchased_Job ​ |  yes  | 
-|  Target Time  |  ​Basis dieser Kennzahl ist die ProjektplanungHier wird der Soll-Aufwand des Arbeitspaketes  berechnet. Bei Abgrenzung wird der Soll-Aufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  DURATION ​ |  Time_Target_Job ​ |  yes  | +|  Target Time  |  ​The basis of this key figure is the project planningHere, the target time of the job is calculatedWhen defining a time span, the target time  under the assumption of uniform distribution is calculated on a daily basis. ​|  FLOAT  |  DURATION ​ |  Time_Target_Job ​ |  yes  | 
-|  Actual Time Spent  |  ​Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker). ​Hier werden die erfassten Stunden des Bearbeiter des Arbeitspaketes verwendetBei Abgrenzung werden die erfassten Zeiten pro Tag herangezogen.  |  FLOAT  |  DURATION ​ |  Time_Tracked_Job ​ |  yes  | +|  Actual Time Spent  |  ​The basis of this key figure is the tracking and recording entry (TimeTracker). ​Here, the recorded times of the employee of the job is usedWhen defining a time span, the recorded times per day are used.  |  FLOAT  |  DURATION ​ |  Time_Tracked_Job ​ |  yes  | 
-|  ​Mitarbeiterumsatz ​ ​|  ​Mitarbeiter-UmsatzAn sich eignet sich diese Zahl nicht als periodische Kennzahlsie ergibt nur als Gesamtergebnis Sinn  ​| ​ FLOAT  |  MONEY  |  Turnover_Calculated_Job ​ |  no  | +|  ​Turnover Calculated ​ ​|  ​Employee turnoverActuallythis number is not a periodical key figure, it is only logical in an overall result sense. ​ ​| ​ FLOAT  |  MONEY  |  Turnover_Calculated_Job ​ |  no  | 
-|  Turnover Chargeable ​ |  ​Basis dieser Kennzahl ist die Kennzahl ​"​Chargeable Time *"​. ​Diese Kennzahl  wird mit dem externer Stundensatz des Arbeitspaketes ​(siehe PreisfindungmultipliziertBei Abgrenzung werden die Zeiterfassungen pro Tag herangezogen.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Job ​ |  yes  | +|  Turnover Chargeable ​ |  ​The basis of this key figure is the key figure ​"​Chargeable Time *"​. ​This key figure is multiplied with the external hourly rate of the job (see pricing). When defining a time span, the recorded times per day are used.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Job ​ |  yes  | 
-|  Turnover Chargeable external ​ |  ​Berechnung der Kosten auf Basis der Arbeitspakete von externen Mitarbeitern ​in Eingangsrechnungspositionen  ​|  FLOAT  |  MONEY  |  TurnoverExternal_Chargeable_Job ​ |  yes  | +|  Turnover Chargeable external ​ |  ​Calculating the costs based on the jobs of external employees ​in incoming invoice positions ​  |  FLOAT  |  MONEY  |  TurnoverExternal_Chargeable_Job ​ |  yes  | 
-|  Planned Time  |  ​Basis dieser Kennzahl ist die ProjektplanungHier wird der Planaufwand des Arbeitspaketes mit den externen Stundensatz ​(siehe PreisfindungmultipliziertBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  MONEY  |  Turnover_Planned_Job ​ |  yes  | +|  Planned Time  |  ​The basis of this key figure is the project planningHere, the planned time of the job is multiplied with the external hourly rate (see pricing). When defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis.  |  FLOAT  |  MONEY  |  Turnover_Planned_Job ​ |  yes  | 
-|  Turnover Tracked ​ |  ​Basis dieser Kennzahl sind die Daten der RechnungHier wird der Nettobetrag der Rechnungspositionen basierend auf dem Arbeitspaket mit Status "​Rechnung übernommen"​ bestimmtBei Abgrenzung wird (wenn vorhandender Leistungszeitraumansonsten das Rechnungsdatum herangezogen.  |  FLOAT  |  MONEY  |  Turnover_Tracked_Job ​ |  yes  | +|  Turnover Tracked ​ |  ​The basis of these key figures is the data of the invoiceThe net amounts of the invoice positions based on the job  with the status „Invoice included“ are defined hereWhen limited ​(if existent), the time span of the service is used, otherwise the date of the invoice is used.  |  FLOAT  |  MONEY  |  Turnover_Tracked_Job ​ |  yes  | 
-|  Planned Working Days Project ​  ​|  ​Dies sind die Tage zwischen Planbeginn und -endeWochenenden werden nicht mitgezähltgesetzliche Feiertage jedoch schon  ​| ​ FLOAT  |  |  WorkingDays_Planned_Job ​ |  yes  | +|  Planned Working Days Project ​  ​|  ​These are the days between the planned beginning and planned endWeekends are not countedbut public holidays are  ​| ​ FLOAT  |  |  WorkingDays_Planned_Job ​ |  yes  | 
-|  Working Days_Tracked Project ​ |  ​Dies sind die Tage zwischen der ersten und der letzten ZeiterfassungWochenenden werden nicht mitgezähltgesetzliche Feiertage jedoch schon  ​| ​ FLOAT  |  |  WorkingDays_Tracked_Job ​ |  yes  |+|  Working Days_Tracked Project ​ |  ​These are the days between the first and last time recordingWeekends are not countedbut public holidays are  ​| ​ FLOAT  |  |  WorkingDays_Tracked_Job ​ |  yes  |
  
-===== Mitarbeiter: =====+===== Employee: =====
  
  
-^  Name  ^  ​Beschreibung ​ ​^ ​ Type  ^  SubTyp ​ ^  ID  ^  Standard yes/​no ​ ^   +^  Name  ^  ​Description ​ ​^ ​ Type  ^  SubTyp ​ ^  ID  ^  Standard yes/​no ​ ^   
-|  ​Ist-Kosten ​ ​|  ​Basis dieser Kennzahl ist die Kennzahl ​"Ist-Arbeitsaufwand ​*" ​zuzüglich aller erfassten Kosten FahrtBelegReise und Fremdkostendes MitarbeitersBei Abgrenzung werden die erfassten Zeiten pro Tag und das Belegdatum herangezogen.  |  FLOAT  |  MONEY  |  Cost_Tracked_Employee ​ |  yes  | +|  ​Cost Tracked ​ ​|  ​The basis of this key figure is the key figure  ​"work cost tracked*", ​plus all recorded travel expensesreceipts, travel and foreign costsof the employeeWhen defining a time span, the recorded times per day and the receipt date is used.  |  FLOAT  |  MONEY  |  Cost_Tracked_Employee ​ |  yes  | 
-|  ​Ist-Umsatz Arbeitskosten ​ ​|  ​Basis dieser Kennzahl sind die Daten der RechnungHier wird der Nettobetrag aller Rechnungspositionen basierend auf allen Arbeitspaketen des Mitarbeiters mit Status "​Rechnung übernommen"​ bestimmtBei Abgrenzung wird (wenn vorhanden) der Leistungszeitraumansonsten das Rechnungsdatum herangezogen.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Employee ​ |  yes  | +|  ​Job Turnover Tracked ​ ​|  ​The basis of this key figure is the data of the invoiceHere the net amounts of the position items are calculated based on jobs of the employee with the status „Invoice included“If the time span is definedthe performance period is used, otherwise the invoice date is used.  |  FLOAT  |  MONEY  |  JobTurnover_Tracked_Employee ​ |  yes  | 
-|  ​Ist-Umsatz ​ ​|  ​Basis dieser Kennzahl ist die Kennzahl ​"Ist-Umsatz Arbeitskosten ​*"​. ​Hier wird der Nettobetrag aller Rechnungspositionen basierend auf allen Arbeitspaketen des Mitarbeiters mit Status "​Rechnung übernommen"​ zuzüglich aller fakturierten Kosten des Mitarbeiters ​(FahrtBeleg und ReisebestimmtBei Abgrenzung wird (wenn vorhandender Leistungszeitraumansonsten das Rechnungsdatum herangezogen.  |  FLOAT  |  MONEY  |  Turnover_Tracked_Employee ​ |  yes  | +|  ​Turnover Tracked ​ ​|  ​The basis of these key figures is "Job Turnover Tracked*"​. ​The net amounts of all invoice positions based on all jobs of the employee with the status „Invoice included“,​ plus all billed costs of the employee ​(drivereceipt and travelare defined hereWhen limited ​(if existent), the time span of the service is used, otherwise the date of the invoice is used.  |  FLOAT  |  MONEY  |  Turnover_Tracked_Employee ​ |  yes  | 
-|  ​Plan-Anwesenheit ​ ​|  ​Diese Kennzahl bestimmt die Planarbeitszeit des Mitarbeiters im Intervall entsprechend des  Standortes ​(Kalenderbzw. (wenn vorhandendes Mitarbeitervertrages.  |  FLOAT  |  MONEY  |  Presence_Planned_Employee ​ |  yes  | +|  ​Presence Planned ​ ​|  ​This key figure determines the planned working time of the employee in the interval corresponding to the location ​(calendar), or (if existentof the employee contract.  |  FLOAT  |  MONEY  |  Presence_Planned_Employee ​ |  yes  | 
-|  ​Beginn Zeiterfassung ​ ​|  ​nicht nur die erste Zeitfassungsondern auch Datum von erfassten BelegenFahrtenReisen ​etc. geht mit ein  ​| ​ DATE  |  |  Start_Tracked_Employee ​ |  yes  | +|  ​Start Tracked ​ ​|  ​Start time recordingfirst time recordingalso date of entered receipts, driving, travel, etc.  |  DATE  |  |  Start_Tracked_Employee ​ |  yes  | 
-|  ​Ende Zeiterfassung ​ ​|  ​nicht nur die letzte Zeitfassungsondern auch Datum von erfassten BelegenFahrtenReisen ​etc. geht mit ein    ​|DATE  |  |  End_Tracked_Employee ​ |  yes  | +|  ​End Tracked ​ ​|  ​End time recordingalso date of entered receiptsdriving, travel, etc.   ​|DATE  |  |  End_Tracked_Employee ​ |  yes  | 
-|  ​Gleitzeit zu Beginn ​ ​|  ​Gleitzeit zu Beginn ​ ​| ​ FLOAT  |  |  Flextime_EntitlementBegin_Employee ​ |  yes  | +|  ​Flextime Entitlement Begin  ​|  ​Flextime Entitlement Begin  ​| ​ FLOAT  |  |  Flextime_EntitlementBegin_Employee ​ |  yes  | 
-|  ​Gleitzeit zum Ende  ​|  ​Gleitzeit zum Ende  ​|  FLOAT  |  |  Flextime_EntitlementEnd_Employee ​ |  yes  | +|  ​Flextime Entitlement End  ​|  ​Flextime Entitlement End    ​|  FLOAT  |  |  Flextime_EntitlementEnd_Employee ​ |  yes  | 
-|  ​Eingangsrechnungsbetrag ​ ​|  ​Summe der Eingangsrechnungspositionendie den Mitarbeiter referenzieren ​AbgrenzungDatum der Eingangsrechnung  ​|  FLOAT  |  |  IncomingInvoice_Tracked_Employee ​ |  yes  | +|  ​Incoming Invoice_Tracked ​ ​|  ​Total of incoming invoice positionswhich refer to the employeeBoundarydate of the incoming invoice ​  |  FLOAT  |  |  IncomingInvoice_Tracked_Employee ​ |  yes  | 
-|  ​Bestellwert brutto ​ |Summe der Bestellpositionendie den Mitarbeiter referenzieren ​(brutto), AbgrenzungBestelldatum ​ ​| ​ FLOAT  |  |  OrderValue_Tracked_Employee ​ |  yes  | +|  ​Order Value Tracked ​ ​| ​ Total of the order positionswhich refer (grosto the employeeBoundaryOrder date  ​| ​ FLOAT  |  |  OrderValue_Tracked_Employee ​ |  yes  | 
-|  Supplier Budgets |  ​Summe der Budgetsdie auf Bestellpositionen,​ die den Mitarbeiter referenzieren. Budgets ​haben kein festes Datumsondern SpanneÜberlappung berechnen  ​|  FLOAT  |  |  SupplierBudget_Tracked_Employee ​ |  yes  | +|  Supplier Budgets |  ​Sum of the budgets of order positionswhich refer to the employee. Budgets ​have no fixed datebut have a marginoverlapping is calculated ​  |  FLOAT  |  |  SupplierBudget_Tracked_Employee ​ |  yes  | 
-|  ​Lieferant-Rechnungswert ​ ​| ​ Summe der Eingangsrechnungspositionendie den Mitarbeiter referenzieren und in Ausgangsrechnungen übernommen wurdenAbgrenzungRechnungsdatum ​ ​| ​ FLOAT  |  |  SupplierTurnover_Tracked_Employee ​ |  yes  | +|  ​Supplier Turnover ​ ​| ​  Sum of the incoming invoice positionswhich refer to the employee and are included into the outgoing invoiceBoundaryinvoice date  ​| ​ FLOAT  |  |  SupplierTurnover_Tracked_Employee ​ |  yes  | 
-|  Billed Time  |  ​fakturierte Zeit aus den Jobs des MAAbgrenzung basiert auf den Datumseinträgen der fakturierten Zeiterfassungen  ​|  FLOAT  |  MONEY  |  Time_Billed_Employee ​ |  yes  | +|  Billed Time  |  ​Billed time from jobs of the employeeThe time limit is based on the date entries of the billed time recording ​  |  FLOAT  |  MONEY  |  Time_Billed_Employee ​ |  yes  | 
-|  Chargeable Time  |  ​Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker) ​und die Bewertung der fakturierbaren LeistungenHier werden die abrechenbaren Zeiten aller Arbeitspakete des Mitarbeiters berechnetBei Abgrenzung werden die Zeiterfassungen pro Tag herangezogen.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Employee ​ |  yes  | +|  Chargeable Time  |  ​The basis of this key figure is tracking and recording entry (TimeTracker) ​and the evaluation of chargeable servicesHere, the billable time of all jobs of the employee is chargedWhen defining the time span, the time entries per day are used.  |  FLOAT  |  DURATION ​ |  Time_Chargeable_Employee ​ |  yes  | 
-|  ​Plan-Zeit ​ ​|  ​Basis dieser Kennzahl ist die ProjektplanungHier wird der Planaufwand aller Arbeitspakete des Mitarbeiters bestimmtBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  DURATION ​ |  Time_Planned_Employee ​ |  yes  | +|  ​Planned Time  ​|  ​The basis of this key figure is the project planningHere, the planned time of the jobs of the employee are definedWhen defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis.  |  FLOAT  |  DURATION ​ |  Time_Planned_Employee ​ |  yes  | 
-|  ​Plan-Aufwand laufender Projekte  ​|  ​Wie Plan-Zeit"​nur für laufende ​(aktiveProjekte ​ ​| ​ FLOAT  |  DURATION ​ |  Time_PlannedActive_Employee ​ |  yes  | +|  ​Time Planned Active ​  |  ​As Planned Time“but only for running ​(activeprojects ​ ​| ​ FLOAT  |  DURATION ​ |  Time_PlannedActive_Employee ​ |  yes  |   
-|  ​Ist-Zeit ​ ​|  ​Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker). ​Hier werden die erfassten Stunden aller Arbeitspakete des MitarbeitersBei Abgrenzung werden die erfassten Zeiten pro Tag herangezogen.  |  FLOAT  |  DURATION ​ |  Time_Tracked_Employee ​ |  yes  | +|  ​Time Tracked ​ ​|  ​The basis of this key figure is tracking and recording entry (TimeTracker). ​Here, the recorded time of all jobs of the employee are definedWhen defining the time span, the recorded times per day are used.  |  FLOAT  |  DURATION ​ |  Time_Tracked_Employee ​ |  yes  | 
-|  ​Mitarbeiterumsatz ​ ​|  ​Mitarbeiter-UmsatzAn sich eignet sich diese Zahl nicht als periodische Kennzahlsie ergibt nur als Gesamtergebnis Sinn  ​| ​ FLOAT  | MONEY  |  Turnover_Calculated_Employee ​ |  no  | +|  ​Turnover Calculated ​ ​|  ​Employee turnoverActuallythis number is not a periodical key figure, it is only logical in an overall result sense. ​ ​| ​ FLOAT  |  MONEY  |  Turnover_Calculated_Employee ​ |  no  | 
-|  ​Fakturierbarer Umsatz ​ ​|  ​Basis dieser Kennzahl ist die Kennzahl "Chargeable Time *"Diese Kennzahl  wird mit dem externen Stundensätzen aller Arbeitspakete des Mitarbeiters ​(siehe PreisfindungmultipliziertBei Abgrenzung werden die Zeiterfassungen pro Tag herangezogen.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Employee ​ |  yes  | +|  ​Turnover Chargeable ​ ​|  ​The basis of this key figure is the key figure „Chargeable Time*This key figure is multiplied with the external hourly rate of all jobs (see pricing). When defining the time span, the the time recording is used per day.  |  FLOAT  |  MONEY  |  Turnover_Chargeable_Employee ​ |  yes  | 
-|  ​Plan-Umsatz ​   ​|Basis dieser Kennzahl ist die ProjektplanungHier wird der Planaufwand aller Arbeitspakete des Mitarbeiters  mit den externen Stundensatz ​(siehe PreisfindungmultipliziertBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  MONEY  |  ​urnover_Planned_Employee ​ ​| ​ yes  | +|  ​Turnover Planned  ​The basis of this key figure is project planningHere, the planned time of all jobs of the project are multiplied with the external hourly rate (see pricing). When defining the time span, the planned time under the assumption of uniform distribution is calculated on a daily basis.  |  FLOAT  |  MONEY  |  ​Turnover_Planned_Employee ​ ​| ​ yes  | 
-|  ​Urlaubsanspruch zu Beginn ​ ​|  ​Urlaubsanspruch zu Beginn ​ ​| ​ FLOAT  |  |  Vacation_EntitlementBegin_Employee ​ |  yes  | +|  ​Vacation Entitlement Begin  ​|  ​Beginning of vacation entitlement ​ ​| ​ FLOAT  |  |  Vacation_EntitlementBegin_Employee ​ |  yes  | 
-|  ​Urlaubsanspruch zum Ende  ​|  ​Urlaubsanspruch zum Ende  ​| ​ FLOAT  |  |  Vacation_EntitlementEnd_Employee ​ |  yes  | +|  ​Vacation Entitlement End  ​|  ​End of vacation entitlement ​ ​| ​ FLOAT  |  |  Vacation_EntitlementEnd_Employee ​ |  yes  | 
-|  ​Ausbezahlter Urlaub ​ ​|  ​ausbezahlter Urlaub ​ ​| ​ FLOAT  |  |  Vacation_PaidOff_Employee ​ |  yes  | +|  ​Vacation Paid Off  ​|  ​Paid off vacation ​ ​| ​ FLOAT  |  |  Vacation_PaidOff_Employee ​ |  yes  | 
-|  ​Plan-Kosten ​ ​|  ​Basis dieser Kennzahl ist die ProjektplanungHier wird der Planaufwand aller Arbeitspakete des Mitarbeiters bestimmtBei Abgrenzung wird der Planaufwand unter Annahme der Gleichverteilung auf Tagesbasis berechnet.  |  FLOAT  |  MONEY  |  WorkCost_Planned_Employee ​ |  yes  | +|  ​Cost Planned ​ ​|  ​The basis of this key figure is the project planningHere, the planned time of all jobs of the employee are definedWhen defining a time span, the planned time under the assumption of uniform distribution are calculated on a daily basis.  |  FLOAT  |  MONEY  |  WorkCost_Planned_Employee ​ |  yes  | 
-|  ​Plan-Arbeitsaufwand ​ |Diese Kennzahl ist derzeit identisch mit „Plan-Kosten" ​ |    |  MONEY  |  WorkCost_Planned_Employee ​ |  yes  | +|  ​Work Cost Planned ​ ​| ​ This key figure is identical to "Cost Planned" ​at the present ​ ​| ​   |  MONEY  |  WorkCost_Planned_Employee ​ |  yes  | 
-|  ​Ist-Arbeitsaufwand ​ ​| ​ Basis dieser Kennzahl ist die Leistungserfassung ​(TimeTracker). ​Hier werden die Kennzahl ​  "Ist-Zeit ​*" ​und der internen Stundensatz  ​(siehe KostenfindungmultipliziertBei Abgrenzung werden die erfassten Zeiten pro Tag herangezogen.  |  FLOAT  |  MONEY  |  WorkCost_Tracked_Employee ​ |  yes  | +|  ​Work Cost Tracked ​ ​| ​  The basis of this key figure is tracking and recording entry (TimeTracker). ​Here, the key figure ​"Actual Time Spent*" ​is multiplied with the internal hourly rate (see costing). When defining the time span, the the recorded time is used per day.  |  FLOAT  |  MONEY  |  WorkCost_Tracked_Employee ​ |  yes  | 
-|  ​Werktage ​ ​|  ​Werktageohne Wochenenden und ohne Feiertage ​ ​| ​ FLOAT  |  |  WorkingDays_Planned_Employee ​ |  yes  |+|  ​Planned Working Days  ​|  ​Working dayswithout weekends and without public holidays ​ ​| ​ FLOAT  |  |  WorkingDays_Planned_Employee ​ |  yes  |
  
 [[3.6 Fortsetzung 6|... continued page 6]] [[3.6 Fortsetzung 6|... continued page 6]]
  
en/handbuch/kapitel_3/3.6._fortsetzung_5.1261494489.txt.gz · Last modified: 2019/10/25 14:09 (external edit)