Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_3:3.12_auswertungssystem [2009/12/14 14:33]
admin
en:handbuch:kapitel_3:3.12_auswertungssystem [2019/10/25 14:11] (current)
Line 107: Line 107:
 Then the view time span (3. Main parameters) and the further criteria are used (4. Parameters) to limit the results of the charts. Then the view time span (3. Main parameters) and the further criteria are used (4. Parameters) to limit the results of the charts.
  
-In the example, all projects are evaluated, which are applied to the cost center „development, a project class as a must/shall project … +In the example, all projects are evaluated, which are applied to the cost center „Development“ ... 
  
 {{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}}
Line 116: Line 116:
  
 These parameters include for example, the cost center of the project, the project type, project status, priority, and whether the project is an external order or not. The other options relate to filtering results. These parameters include for example, the cost center of the project, the project type, project status, priority, and whether the project is an external order or not. The other options relate to filtering results.
- 
  
 On the "​format"​ tab (5. Settings for chart display), for example, the width of the images in pixels are selected and the diagram type is selected. On the "​format"​ tab (5. Settings for chart display), for example, the width of the images in pixels are selected and the diagram type is selected.
  
-{{:handbuch:kapitel_4:tutorial:362.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart35.gif|}}
  
 If alternative output formats are desired (by default, all reports are generated in HTML within the application) the output format can be chosen in the element "​display"​. If alternative output formats are desired (by default, all reports are generated in HTML within the application) the output format can be chosen in the element "​display"​.
  
-In the following example, the chart job plan/actual is generated with the illustration (diagram type "bar chart"​) ...+In the following example, the chart job plan/actual is generated with the illustration (diagram type "​bar ​horizontal ​chart"​) ...
  
-{{:handbuch:kapitel_4:tutorial:363.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart36.gif|}}
  
-... with the pdf output format.+... in pdf output format.
  
 Depending on the system setting, the generated chart is opened in the browser ... Depending on the system setting, the generated chart is opened in the browser ...
  
-{{:handbuch:kapitel_4:tutorial:364.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart_download3.gif|}}
  
 ... or in the appropriate display program ... ... or in the appropriate display program ...
  
-{{:handbuch:kapitel_4:tutorial:365.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart_download4.gif|}}
  
 ... (here with Adobe Reader). ... (here with Adobe Reader).
Line 144: Line 143:
 In the "​Results"​ tab, the chart results are administered. In the "​Results"​ tab, the chart results are administered.
  
-{{:handbuch:kapitel_4:tutorial:367.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart37.gif|}}
  
 **Notes**: The chart results are stored permanently only if the chart block is stored. The number of results in the field "​Maximum number of results"​ can be set.  **Notes**: The chart results are stored permanently only if the chart block is stored. The number of results in the field "​Maximum number of results"​ can be set. 
  