Line 91: Line 91:
 {{:​en:​handbuch:​kapitel_5:​project_chart21.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart21.gif|}}
  
-... are used as input data.{{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}}+... are used as input data.
  
 This process can be performed a multiple amount of times (with various categories). This process can be performed a multiple amount of times (with various categories).
Line 103: Line 103:
 In the example, all top projects with the status „active“ are transfered to the input data.  In the example, all top projects with the status „active“ are transfered to the input data. 
  
 +{{:​en:​handbuch:​kapitel_5:​project_chart30.1.gif|}}
  
 +Then the view time span (3. Main parameters) and the further criteria are used (4. Parameters) to limit the results of the charts.
  
- +In the example, all projects are evaluated, which are applied to the cost center „Development“ ... 
-In the example, all projects are evaluated, which are applied to the cost center „development, a project class as a must/shall project … +
  
 {{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}}
  
-{{:​handbuch:​kapitel_4:​tutorial:​358.gif?​direct}} +... a necessary project or an optional project ​and which has the status active or advance services.
- +
-Then the view time span (3Main parameters) and the further criteria are used (4Parameters) to limit the results of the charts. These parameters include for example, the cost center of the project, the project type, project status, priority, and whether the project is an external order or not. The other options relate to filtering results. +
- +
-{{:​en:​handbuch:​kapitel_5:​project_chart31.gif|}} +
- +
-In the example, all projects are evaluated, which are assigned to cost center technology, the project type customizing ​ or introduction are assigned, ​a necessary project or an optional project ​...+
  
 {{:​en:​handbuch:​kapitel_5:​project_chart32.gif|}} {{:​en:​handbuch:​kapitel_5:​project_chart32.gif|}}
  
-... and has the status ​active ​or advance services. +These parameters include for example, ​the cost center of the project, the project type, project ​status, priority, and whether the project is an external order or notThe other options relate to filtering results.
- +
-{{:​handbuch:​kapitel_4:​tutorial:​361.gif?​direct}}+
  
 On the "​format"​ tab (5. Settings for chart display), for example, the width of the images in pixels are selected and the diagram type is selected. On the "​format"​ tab (5. Settings for chart display), for example, the width of the images in pixels are selected and the diagram type is selected.
  
-{{:handbuch:kapitel_4:tutorial:362.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart35.gif|}}
  
 If alternative output formats are desired (by default, all reports are generated in HTML within the application) the output format can be chosen in the element "​display"​. If alternative output formats are desired (by default, all reports are generated in HTML within the application) the output format can be chosen in the element "​display"​.
  
-In the following example, the chart job plan/actual is generated with the illustration (diagram type "​bar ​cahrt") ...+In the following example, the chart job plan/actual is generated with the illustration (diagram type "​bar ​horizontal chart") ...
  
-{{:handbuch:kapitel_4:tutorial:363.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart36.gif|}}
  
-... with the pdf output format.+... in pdf output format.
  
 Depending on the system setting, the generated chart is opened in the browser ... Depending on the system setting, the generated chart is opened in the browser ...
  
-{{:handbuch:kapitel_4:tutorial:364.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart_download3.gif|}}
  
 ... or in the appropriate display program ... ... or in the appropriate display program ...
  
-{{:handbuch:kapitel_4:tutorial:365.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart_download4.gif|}}
  
 ... (here with Adobe Reader). ... (here with Adobe Reader).
Line 150: Line 143:
 In the "​Results"​ tab, the chart results are administered. In the "​Results"​ tab, the chart results are administered.
  
-{{:handbuch:kapitel_4:tutorial:367.gif?direct}}+{{:en:handbuch:kapitel_5:project_chart37.gif|}}
  
 **Notes**: The chart results are stored permanently only if the chart block is stored. The number of results in the field "​Maximum number of results"​ can be set.  **Notes**: The chart results are stored permanently only if the chart block is stored. The number of results in the field "​Maximum number of results"​ can be set. 
  