User Tools

Site Tools


en:handbuch:kapitel_3:3.12.06_mitarbeiterauswertung

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_3:3.12.06_mitarbeiterauswertung [2009/12/11 15:32]
192.168.0.51
en:handbuch:kapitel_3:3.12.06_mitarbeiterauswertung [2019/10/25 14:11] (current)
Line 18: Line 18:
  
     * [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation I]], [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation II]] and [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation III]]      * [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation I]], [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation II]] and [[3.12.04_kapazitaetsauswertung#​Capacity Utilisation Evaluation III]] 
-    * [[3.12.04_kapazitaetsauswertung#​Capacity ​evaluation ​I]], [[3.12.04_kapazitaetsauswertung#​Capacity Evaluation II]] and [[3.12.04_kapazitaetsauswertung#​Capacity Evaluation III]]+    * [[3.12.04_kapazitaetsauswertung#​Capacity ​Evaluation ​I]], [[3.12.04_kapazitaetsauswertung#​Capacity Evaluation II]] and [[3.12.04_kapazitaetsauswertung#​Capacity Evaluation III]]
     * [[3.12.04_kapazitaetsauswertung#​Calendar Overview Evaluation I]] and [[3.12.04_kapazitaetsauswertung#​Calendar Overview Evaluation II]]     * [[3.12.04_kapazitaetsauswertung#​Calendar Overview Evaluation I]] and [[3.12.04_kapazitaetsauswertung#​Calendar Overview Evaluation II]]
  
Line 36: Line 36:
  
  
-The [[#employee overview]] chart, based on the plan data in the system provides the appropriate chart. ​ +The [[#Employee Overview]] chart, based on the plan data in the system provides the appropriate chart. ​
- +
-{{:​en:​handbuch:​kapitel_3:​employee_chart2.jpg|}}+
  
 +{{:​en:​handbuch:​kapitel_3:​employee_time_conf1.jpg|}}
  
 ===== Occupation ​ Chart ===== ===== Occupation ​ Chart =====
Line 45: Line 44:
 The **occupation chart** provides an overview of the project services and working hours of employees in the selected time interval. The project services are based on manual data entry in the [[en:​handbuch:​kapitel_2:​2.3.01_timetracker | TimeTracker]] for the [[en:​handbuch:​kapitel_2:​2.02.04_arbeitspaket | Jobs]] ​ of the employees. The working time data is entered in the [[en:​handbuch:​ kapitel_2: 2.3.01_timetracker | TimeTracker]] as "​come-leave"​ or can be determined automatically by the system with the help of an option as the sum of the project times. The absences (vacation, illness, maternity leave, ...) can be defined decentrally ​ in  [[en:​handbuch:​kapitel_2:​2.3.01_timetracker | TimeTracker]] or defined centrally in [[en:​handbuch:​kapitel_4:​4.08.2_abwesenheitserfassung |  Absence Recording]]. The **occupation chart** provides an overview of the project services and working hours of employees in the selected time interval. The project services are based on manual data entry in the [[en:​handbuch:​kapitel_2:​2.3.01_timetracker | TimeTracker]] for the [[en:​handbuch:​kapitel_2:​2.02.04_arbeitspaket | Jobs]] ​ of the employees. The working time data is entered in the [[en:​handbuch:​ kapitel_2: 2.3.01_timetracker | TimeTracker]] as "​come-leave"​ or can be determined automatically by the system with the help of an option as the sum of the project times. The absences (vacation, illness, maternity leave, ...) can be defined decentrally ​ in  [[en:​handbuch:​kapitel_2:​2.3.01_timetracker | TimeTracker]] or defined centrally in [[en:​handbuch:​kapitel_4:​4.08.2_abwesenheitserfassung |  Absence Recording]].
  
-{{:handbuch:kapitel_4:praxis:4-reports-ma3.gif?direct}}+{{:en:handbuch:kapitel_3:employee_occup1.jpg|}}
  
 ===== Time Sheet ===== ===== Time Sheet =====
Line 53: Line 52:
 In contrast to [[#​Occupation chart]] the comments of [[en:​handbuch:​kapitel_2:​ 2.3.01_timetracker | TimeTracker]] are here displayed and the information of [[en:​handbuch:​kapitel_3:​3.11.07_arbeitszeitverwaltung | Working Time Administration]] (holiday accounts, illness and flexi-time) are listed. Optionally, the postings from the working time accounts and a listing of the posted jobs can be displayed. In contrast to [[#​Occupation chart]] the comments of [[en:​handbuch:​kapitel_2:​ 2.3.01_timetracker | TimeTracker]] are here displayed and the information of [[en:​handbuch:​kapitel_3:​3.11.07_arbeitszeitverwaltung | Working Time Administration]] (holiday accounts, illness and flexi-time) are listed. Optionally, the postings from the working time accounts and a listing of the posted jobs can be displayed.
  
-{{:​handbuch:​kapitel_4:praxis:4-reports-ma5.gif?direct}}+{{:en:handbuch:kapitel_3:​capacity_chart11.jpg|}} 
 +{{:​en:​handbuch:kapitel_3:capacity_chart11a.jpg|}}
  
 ===== Project Time External/​Internal ===== ===== Project Time External/​Internal =====
- 
  
 The chart **Project Time external/​Internal** provides an overview of all relevant working hour information of the employees in the selected time interval. In addition to this information,​ further information are also provided from the [[en:​handbuch:​kapitel_2:​fakturierbare_zeiten | Billable Time]], the [[en:​handbuch:​kapitel_2:​2.4.11_rechnung | Invoice]] and the  [[en:​handbuch:​kapitel_2:​2.3.03_reisen | Travel]]. ​ The chart **Project Time external/​Internal** provides an overview of all relevant working hour information of the employees in the selected time interval. In addition to this information,​ further information are also provided from the [[en:​handbuch:​kapitel_2:​fakturierbare_zeiten | Billable Time]], the [[en:​handbuch:​kapitel_2:​2.4.11_rechnung | Invoice]] and the  [[en:​handbuch:​kapitel_2:​2.3.03_reisen | Travel]]. ​
  
-{{:handbuch:kapitel_4:praxis:4-reports-ma6.gif?direct}}+{{:en:handbuch:kapitel_3:capacity_chart13.jpg|}} 
 + 
  
 ===== Employee Plan/Actual ===== ===== Employee Plan/Actual =====
Line 66: Line 67:
 The chart **Employee Plan/​Actual** provides an overview of the planned and the achieved project efforts and working hours of the employees in the selected time interval. By using this chart, the proportion of project time to working hours (column capacity) can be illustrated. The capacity refers to the "​net-working hours",​ i.e. working hours without the absences. The chart **Employee Plan/​Actual** provides an overview of the planned and the achieved project efforts and working hours of the employees in the selected time interval. By using this chart, the proportion of project time to working hours (column capacity) can be illustrated. The capacity refers to the "​net-working hours",​ i.e. working hours without the absences.
  
-The chart can also illustrate the 'plan and actual time' graphically,​ if the option is set "​with ​illustration"​. ​ +The chart can also illustrate the 'plan and actual time' graphically,​ if the option is set "​with ​image".
- +
- +
-{{:​handbuch:​kapitel_4:​praxis:​4-reports-ma4.gif?​direct}} +
  
 +{{:​en:​handbuch:​kapitel_3:​capacity_chart14.jpg|}}
en/handbuch/kapitel_3/3.12.06_mitarbeiterauswertung.1260541928.txt.gz · Last modified: 2019/10/25 14:09 (external edit)