This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:handbuch:kapitel_3:3.12.03_gantt-diagramm [2009/11/12 11:26] 192.168.0.76 |
en:handbuch:kapitel_3:3.12.03_gantt-diagramm [2019/10/25 14:11] (current) |
||
---|---|---|---|
Line 27: | Line 27: | ||
This chart provides an overview of all the elements of the work breakdown structure and milestones of the selected projects. The plan time/effort, actual time/effort and the remaining time/effort of the elements, schedule and cost information as well as key figures are displayed as a list. The plan data is determined from the jobs and the actual times are extracted from the data entries of TimeTracker. | This chart provides an overview of all the elements of the work breakdown structure and milestones of the selected projects. The plan time/effort, actual time/effort and the remaining time/effort of the elements, schedule and cost information as well as key figures are displayed as a list. The plan data is determined from the jobs and the actual times are extracted from the data entries of TimeTracker. | ||
+ | {{:en:handbuch:kapitel_3:gantt_table1.jpg|}} | ||
- | {{:handbuch:kapitel_4:praxis:4-reports-ga2.gif?direct}} | + | This chart supports more than 60 key figures. These key figures can be added in the [[en:handbuch:kapitel_2: 2.10_reportgenerator_reportmaker | ReportDesigner]]. |
- | This chart supports more than 60 key figures. These key figures can be added in the [[en:handbuch:kapitel_2: 2.10_reportgenerator_reportmaker | ReportMaker]]. | ||
- | + | {{:en:handbuch:kapitel_3:gantt_chart3.jpg|}} | |
- | {{:handbuch:kapitel_4:praxis:4-reports-ga3.gif?direct}} | + | |