 The Gantt charts contain the time-related project charts in the system. The parameters available for the generated charts are various types of display types and the size of the generated jpg images. With display types, it can be selected whether bars should be generated above projects and jobs, whether milestones and networks should be displayed and whether the date for significant data should be generated. The Gantt charts contain the time-related project charts in the system. The parameters available for the generated charts are various types of display types and the size of the generated jpg images. With display types, it can be selected whether bars should be generated above projects and jobs, whether milestones and networks should be displayed and whether the date for significant data should be generated.
  
-In the Gantt chart, the planning data for the main project and the sub-projects (as described in chapter [[en:​handbuch:​kapitel_2:​2.5.03]]) is displayed as a gray bar with phases, milestones as gray diamonds, and the jobs as blue bars. The arrows between the jobs symbolize the order relationships. For this project, time and deadlines have been recorded. The recording for the projects and jobs are displayed as thin black bars and the estimates for the milestones as horizontal lines.+In the Gantt chart, the planning data for the main project and the sub-projects (as described in chapter [[en:​handbuch:​kapitel_2:​2.5.03_gantt-diagramm|2.5.03 ​Gantt-Chart]]) is displayed as a gray bar with phases, milestones as gray diamonds, and the jobs as blue bars. The arrows between the jobs symbolize the order relationships. For this project, time and deadlines have been recorded. The recording for the projects and jobs are displayed as thin black bars and the estimates for the milestones as horizontal lines.
  
 {{:​en:​handbuch:​kapitel_3:​gantt_chart1.jpg|}} {{:​en:​handbuch:​kapitel_3:​gantt_chart1.jpg|}}
Line 25: Line 25:
 ===== Gantt-Table ===== ===== Gantt-Table =====
  
 +This chart provides an overview of all the elements of the work breakdown structure and milestones of the selected projects. The plan time/​effort,​ actual time/effort and the remaining time/effort of the elements, schedule and cost information as well as key figures are displayed as a list. The plan data is determined from the jobs and the actual times are extracted from the data entries of TimeTracker. ​
  
-Diese Auswertung liefert eine Übersicht über alle Elemente des Projektstrukturplans und der Meilensteine der selektierten Projekte. Die Plan-, Ist- und Restaufwände für die Elemente werden zusammen mit Termin- und Kosteninformationen sowie Kennzahlen in einer Liste dargestellt. Dabei werden die Plandaten aus den Arbeitspaketen bestimmt und die Ist-Zeiten werden aus den Erfassungsdaten des TimeTrackers gewonnen+{{:​en:​handbuch:​kapitel_3:​gantt_table1.jpg|}}
  
-{{:handbuch:kapitel_4:praxis:​4-reports-ga2.gif?​direct}}+This chart supports more than 60 key figures. These key figures can be added in the [[en:handbuch:kapitel_22.10_reportgenerator_reportmaker | ReportDesigner]].
  
-Diese Auswertung unterstützt über 60 Kennzahlen. Diese Kennzahlen können im [[handbuch:​kapitel_2:​2.10_reportgenerator_reportmaker|ReportDesigner]] zugeladen werden. 
  
-{{:handbuch:kapitel_4:praxis:4-reports-ga3.gif?direct}}+{{:en:handbuch:kapitel_3:gantt_chart3.jpg|}}
  
  