User Tools

Site Tools


en:handbuch:kapitel_3:3.12.01_earned-value-analyse

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_3:3.12.01_earned-value-analyse [2009/10/27 16:53]
admin
en:handbuch:kapitel_3:3.12.01_earned-value-analyse [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[3.12_auswertungssystem|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[3.12.02_finanzauswertung|{{|next}}]] [[3.12_auswertungssystem|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[3.12.02_finanzauswertung|{{|next}}]]
  
-====== 3.12.01 Earned Value Analyse ​======+====== 3.12.01 Earned Value Analysis ​======
  
 +The Earned Value Analysis emerged in the early 60's as a control method of the U.S. Air Force and is a management tool for projects in many countries. Earned Value or Earned Value Analysis refers to a method to make the progress of a project measurable and predictable at any given time. The key figure, which with this is done by this method, is also known as Earned Value.
  
-Die Earned ​Value Analyse entstand Anfang der 60er Jahre als Kontrollverfahren der US Airforce und ist in verschiedenen Ländern das Steuerungsinstrument für Projekte. Earned Value oder Earned Value Analysis bezeichnet eine Methode, um den Fortschritt eines Projekts zu jedem Zeitpunkt messbar und prognostizierbar zu machen. Die Kennzahl, mit der dies nach dieser Methode geschieht, wird ebenfalls als Earned Value bezeichnet.+Earned ​value is based on the three basis key figures which can be calculated at any given time in the project
  
-Earned Value basiert auf den zu jedem Projektzeitpunkt ermittelbaren drei Basiskennzahlen ​ 
  
-    * **BCWS** (Soll bis zu diesem Zeitpunkt kumulierte geplante Kosten),  +    * **BCWS** (Budgeted Cost of Work Scheduled : scheduled ​ ​planned costs cumulated up to this point in time),  
-    * **ACWP** (Ist bis zu diesem Zeitpunkt kumulierte aufgelaufene Kostenund +    * **ACWP** (Actual Cost of Work Performed : actual ​accrued expenses cumulated up to this point in timeand 
-    * **BCWP** (Tatsächlicher Plan kumulierte geplante Kosten der bis zu diesem Zeitpunkt fertiggestellten Aktivitäten)+    * **BCWP** (Budgeted Cost of Work Performed : actual plan cumulated planned costs for activities completed up to this point in time)
  
-Das besondere an der Earned Value Analyse ist, dass neben den Plan und den Ist-Werten als dritte Größe der gleichen Einheit der BCWP zur Projektbeurteilung herangezogen wird. Diese dritte Größe ​ stellt eine Messbarkeit des Projektfortschritts herDie absoluten Abweichungen des Projekts vom Plan bzglTerminen und Kosten werden als **Schedule Variance** = BCWP - BCWS und **Cost Variance** = BCWP - ACWP bezeichnet.+With Earned-Value-Analysis, not only the planned and actual values, but also a third value (BCWP, also stated in hours) can be used for project evaluationThis third value produces measurable project progressThe absolute differences of the project from the plan regarding the project schedule and costs are described as **Schedule Variance** = BCWP - BCWS and **Cost Variance** = BCWP - ACWP.
  
-Die Auswertung stellt zunächst in tabellarischer Form die Kennzahlen der Earned Value Analyse darDabei kann der Benutzer im Reiter "​Parameter"​ die zeitliche Periode als Spalte für den PlanIst (und Rest), den Fortschritt ​(Fertigstellungsgrad der aktuellen Periode abzüglich des Fertigstellungsgrades der letzten Periode), den Earned Value und die Kennzahlen sowie die Abweichungen auswählenAls Perioden stehen hier wöchentlichmonatlich und Quartalsweise zur VerfügungMit der Einstellung ​in Gruppierung wird der Zeilenaufbau bestimmt: (nach Mitarbeiternach Phasenach Tätigkeit und nach Unterprojekt). +The chart first presents the key figures of the Earned Value Analysis in tabular formThis allows the user to select the periods as a column for the planactual ​(and remaining), the progress ​(degree of completion of the current period less the degree of completion of last period), the earned value and the key figures and the differences in the tab "​Parameters"​The available periods are weeklymonthly and quarterlyThe row structure is defined with the settings ​in grouping: (by employeephaseoccupation and subproject). 
  
-Für die Bestimmung des Fortschrittes können vier Optionen ausgewählt werdenDie Option aus Planwerten bestimmt für das Gruppierungsmerkmal ​(siehe nächstes Elementden rechnerischen Fertigstellungsgrad ​(Ist-Aufwand ​Planaufwand), die Option aus Schätzungen im Projekt verwendet den Fertigstellungsgrad aus dem Projekt und die Option aus Schätzungen ​in der Zeiterfassung verwendet die Schätzungen aus den TimeTracker.+To determine the progress, four options can be selectedThe option "​progress from plan" determines for the grouping feature ​(see next element), the calculated degree of completion ​(actual effortplanned effort), the option "​progress from project"​ uses the degree of completion from the project and the option progress from job  uses in the estimations from TimeTracker.
  
-Die Daten der Tabelle können ​in StundenPersonentagen oder EUR berechnet werden.+The data for the table can be in hoursperson days or in EUR (currency).
  
-{{:​handbuch:​kapitel_4:praxis:4-reports-eva1.gif?direct}}+{{:en:handbuch:kapitel_3:​earned_value1.jpg|}} 
 +{{:​en:​handbuch:kapitel_3:earned_value1a.jpg|}}
  
-Die erste Graphik der Auswertung visualisiert die Kennzahlen ​BCWS, ACWP und BCWP. Der grüne Graph stellt die bis zu diesem Zeitpunkt kumulierten geplante Aufwände darder orange ​Graph die bis zu diesem Zeitpunkt kumulierten aufgelaufene Aufwände und ab der aktuellen Periode die geschätzten AufwändeDer violette Graph stellt als Vergleichsgröße die kumulierten geplante Aufwände der bis zu diesem Zeitpunkt fertiggestellten AktivitätenBei der Option ​"Kosten anzeigen" ​werden statt Aufwände Kosten angezeigt.+The first graph of the chart visualizes the key figures ​BCWS, ACWP and BCWP. The green graph represents the cumulative planned time/effort up to this timethe orange ​graph represents the cumulated accrued expenses up to this time and the  estimated time/effort from the current periodThe purple graph represents as comparative value the cumulated planned time/effort of activities completed up to this timeUsing the option ​"display costs" ​ ​displays costs instead of effort.
  
-{{:handbuch:kapitel_4:praxis:4-reports-eva2.jpg?direct}}+{{:en:handbuch:kapitel_3:earned_value2.jpg|}}
  
-Die zweite Graphik der Auswertung visualisiert die Abweichungen Zeit BCWP - BCWS, Budget ​BCWS - ACWP und Kosten ​BCWP - ACWP . +The second graph of the chart visualizes the differences of time  ​BCWP - BCWS, budget ​BCWS - ACWP and costs BCWP - ACWP.
  
-{{:handbuch:kapitel_4:praxis:4-reports-eva3.jpg?direct}}+{{:en:handbuch:kapitel_3:earned_value3.jpg|}}
  
-Die relativen Abweichungendie auch zum Vergleich unterschiedlicher Projekte herangezogen werden können sind:+The relative differenceswhich can also be used to compare various projects are:
  
-    * **SPI:​** ​ Schedule Performance Index = BCWP/​BCWS ​und +    * **SPI:​** ​ Schedule Performance Index = BCWP/​BCWS ​and 
     * **CPI:** Cost Performance Index = BCWP/​ACWP. ​     * **CPI:** Cost Performance Index = BCWP/​ACWP. ​
  
-SPI und vor allem CPI können zur Prognose von Projektdauer bzw. Projektendebudget ​(EAC = Estimate at Completion) ​herangezogen werden.+SPI and CPI in particular can be used to predict the project duration and/or the project end budget ​(EAC = Estimate at Completion).
  