en:handbuch:kapitel_2:fertigstellung_schaetzen

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:fertigstellung_schaetzen [2009/10/02 17:05]
192.168.0.24
en:handbuch:kapitel_2:fertigstellung_schaetzen [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[spesenabrechnung|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[zeiterfassung_sperren|{{|next}}]] [[spesenabrechnung|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[zeiterfassung_sperren|{{|next}}]]
-====== 2.06.06 Estimate Grade of Compeletion ​======+====== 2.06.06 Estimate Grade of Completion ​======
  
-For project controlling either the grade of completion or rest time/effort is needed as a benchmark. These evaluations can be stored in TimeTracker (from the employee) or in the dialog ​"​estimate completion"​ (for example, from the project leader). ​ Furthermore,​ grades of completion can be stored in the project (see also the project and grade of completion forms). ​ +For project controlling either the grade of completion or rest time/effort is needed as a benchmark. These evaluations can be stored in TimeTracker (from the employee) or in the dialogue ​"​estimate completion"​ (for example, from the project leader). ​ Furthermore,​ grades of completion can be stored in the project (see also the project and grade of completion forms). ​
- +
- +
-**Tip:** For more on this subject see chapter [[4.3.11_fertigstellung_schaetzen|4.3.11 Fertigstellung schätzen]]. +
- +
-{{:​handbuch:​kapitel_2:​fertigstellung-schaetzen.gif?​direct}}+
  
 +{{:​en:​handbuch:​kapitel_2:​grade_of_completion.png|}}
en/handbuch/kapitel_2/fertigstellung_schaetzen.1254495949.txt.gz · Last modified: 2019/10/25 14:09 (external edit)