en:handbuch:kapitel_2:fakturierbare_zeiten

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:fakturierbare_zeiten [2009/10/08 17:38]
192.168.0.24
en:handbuch:kapitel_2:fakturierbare_zeiten [2019/10/25 14:11] (current)
Line 4: Line 4:
  
 Performed work/effort is not always approved for billing as has been recorded. The entered times for invoicing in Projectile (see chapter [[4.4.5 Invoicing]]) can be calculated. This functionality is used predominantly from project leaders for preparing the invoicing.  ​ Performed work/effort is not always approved for billing as has been recorded. The entered times for invoicing in Projectile (see chapter [[4.4.5 Invoicing]]) can be calculated. This functionality is used predominantly from project leaders for preparing the invoicing.  ​
- 
-**Tip:** For more on this subject see chapter [[4.3.7 Billable Time Recording]]. 
  
 **Note:** This functionality is also available in TimeTracker and can be configured in the TimeTracker_Default (see Administration Guide)! ​ **Note:** This functionality is also available in TimeTracker and can be configured in the TimeTracker_Default (see Administration Guide)! ​
  
-{{:​handbuch:​kapitel_2:​fakturierbare-zeiten.gif?direct}}+{{:en:​handbuch:​kapitel_2:​billable_time.png|}}
  
  
  
  
en/handbuch/kapitel_2/fakturierbare_zeiten.1255016334.txt.gz · Last modified: 2019/10/25 14:09 (external edit)