This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:handbuch:kapitel_2:2.5.09_projektauswertung [2009/12/09 16:45] admin |
en:handbuch:kapitel_2:2.5.09_projektauswertung [2019/10/25 14:11] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
[[2.5.08_portfolio-auswertung|{{|previous}}]] [[en:handbuch:handbuch|{{|Home}}]] [[2.06_schnellerfassungen_und_weitere_funktionalitaeten|{{|next}}]] | [[2.5.08_portfolio-auswertung|{{|previous}}]] [[en:handbuch:handbuch|{{|Home}}]] [[2.06_schnellerfassungen_und_weitere_funktionalitaeten|{{|next}}]] | ||
- | ====== 2.5.09 Project Chart ====== | + | ====== 2.05.09 Project Chart ====== |
The **Project Chart** processes the project-related charts. Included are project overview, project structure plan, target/actual comparisons for projects and jobs, Milestone-Trend-Analysis (MTA Chart), visualizing the grade of completion, time sheets and skill matrix. | The **Project Chart** processes the project-related charts. Included are project overview, project structure plan, target/actual comparisons for projects and jobs, Milestone-Trend-Analysis (MTA Chart), visualizing the grade of completion, time sheets and skill matrix. | ||
- | **Tip:** For more on this subject see chapter [[en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen|4.12.1 Applying Charts]] and [[handbuch:kapitel_3:3.12.08_projektauswertung|4.5.08 Project Chart]]. | + | **Tip:** For more on this subject see chapter [[en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen|4.12.1 Applying Charts]] and [[en:handbuch:kapitel_3:3.12.08_projektauswertung|4.5.08 Project Chart]]. |
The form consists of the following elements: | The form consists of the following elements: | ||
Line 11: | Line 11: | ||
===== 1. Name ===== | ===== 1. Name ===== | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_inputdata.gif?direct}} | + | {{:en:handbuch:kapitel_2:projectchart1.png|}} |
* **Name:** In this field the name of the chart is defined, if this should be saved (for example, for time sevices or for administrating the chart results). | * **Name:** In this field the name of the chart is defined, if this should be saved (for example, for time sevices or for administrating the chart results). | ||
Line 26: | Line 26: | ||
===== 2. Input Data ===== | ===== 2. Input Data ===== | ||
+ | |||
+ | {{:en:handbuch:kapitel_2:projectchart2.png|}} | ||
* **Search:** It is possible to search for data for the chart with this selection box. This search entry must relate to the supported catagories. | * **Search:** It is possible to search for data for the chart with this selection box. This search entry must relate to the supported catagories. | ||
Line 33: | Line 35: | ||
===== 3. Main Parameters ===== | ===== 3. Main Parameters ===== | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_inputdata2.gif?direct}} | + | {{:en:handbuch:kapitel_2:projectchart3.png|}} |
* **Chart Period:** This drop-down box refers to the chart's time span (elements start and end) and allows a parameterised definition of the time span for the time services. This selection (current week, current month, …, next week, last week, …) can be also used to simplify the manual definition of start and end. | * **Chart Period:** This drop-down box refers to the chart's time span (elements start and end) and allows a parameterised definition of the time span for the time services. This selection (current week, current month, …, next week, last week, …) can be also used to simplify the manual definition of start and end. | ||
Line 40: | Line 42: | ||
===== 4. Further Criteria ===== | ===== 4. Further Criteria ===== | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_parameters.gif?direct}} | + | {{:en:handbuch:kapitel_2:projectchart4.png|}} |
- | + | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_parameters2.gif?direct}} | + | |
* **Cost Center:** Cost centers can be selected as selection criteria with this selection list. These cost centers refer to the cost center of the project and limits the selection of the given employee (only projects are displayed, which are assigned to this/these cost center(s)). | * **Cost Center:** Cost centers can be selected as selection criteria with this selection list. These cost centers refer to the cost center of the project and limits the selection of the given employee (only projects are displayed, which are assigned to this/these cost center(s)). | ||
Line 53: | Line 53: | ||
===== 5. Adjustment of Chart Display ===== | ===== 5. Adjustment of Chart Display ===== | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_format.gif?direct}} | + | {{:en:handbuch:kapitel_2:projectchart5.1.png|}} |
* **Width:** The width in pixel (px) is determined for the graphical chart in this field. | * **Width:** The width in pixel (px) is determined for the graphical chart in this field. | ||
Line 63: | Line 63: | ||
===== 6. Results===== | ===== 6. Results===== | ||
- | {{:en:handbuch:kapitel_2:project_chart_-_results.gif?direct}} | + | {{:en:handbuch:kapitel_2:projectchart6.png|}} |
The results of the already processed chart are found in this tab. | The results of the already processed chart are found in this tab. |