- | ====== 2.5.03 Gantt-Chart====== | + | ====== 2.05.03 Gantt-Chart====== |
The **Gantt Chart** processes the project-related bar charts. A bar chart is a chart for visualizing the time plan of a project. The duration of a job or project is symbolized through the length of the bar on the timeline. The bars can be comprised of either actual or planned data. Events or milestones are displayed as time points. The parameters available for the generated charts are the display possibilities (through projects, jobs, milestones, with links, with the date) and the size of the generated jpg image. | The **Gantt Chart** processes the project-related bar charts. A bar chart is a chart for visualizing the time plan of a project. The duration of a job or project is symbolized through the length of the bar on the timeline. The bars can be comprised of either actual or planned data. Events or milestones are displayed as time points. The parameters available for the generated charts are the display possibilities (through projects, jobs, milestones, with links, with the date) and the size of the generated jpg image. | ||
- | **Tip:** For more on this subject see chapter [[4.5 Using Charts]] und [[en:handbuch:kapitel_3:3.12.03_gantt_diagramm|Gannt Charts]]. | + | **Tip:** For more on this subject see chapter [[en:handbuch:kapitel_4:4.12.1_bedienung_der_standardauswertungen|4.12.1 Applying Charts]] and [[en:handbuch:kapitel_3:3.12.03_gantt-diagramm | 3.12.03 Gantt Chart]]. |
The form consists of the following elements: | The form consists of the following elements: | ||
Line 10: | Line 10: | ||
===== 1. Name ===== | ===== 1. Name ===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_inputdata.gif?direct}} | + | {{:en:handbuch:kapitel_2:gantt1.png|}} |
* **Name:** In this field the name of the chart is defined, if this should be saved (for example, for time services or for administrating the chart results). | * **Name:** In this field the name of the chart is defined, if this should be saved (for example, for time services or for administrating the chart results). | ||
Line 21: | Line 21: | ||
===== 2. Input Data===== | ===== 2. Input Data===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_inputdata2.gif|}} | + | {{:en:handbuch:kapitel_2:gantt2.png|}} |
* **Search:** It is possible to search for data for the chart with this selection box. This search entry must relate to the supported catagories. | * **Search:** It is possible to search for data for the chart with this selection box. This search entry must relate to the supported catagories. | ||
Line 30: | Line 30: | ||
===== 3. Main Parameters ===== | ===== 3. Main Parameters ===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_inputdata3.gif|}} | + | {{:en:handbuch:kapitel_2:gantt3.png|}} |
* **Chart Period:** This drop-down box refers to the chart's time span (elements start and end) and allows a parameterised definition of the time span for the time services. This selection (current week, current month, …, next week, last week, …) can be also used to simplify the manual definition of start and end. | * **Chart Period:** This drop-down box refers to the chart's time span (elements start and end) and allows a parameterised definition of the time span for the time services. This selection (current week, current month, …, next week, last week, …) can be also used to simplify the manual definition of start and end. | ||
* **Start and End:** In this field a time interval can be entered as selection criteria to limit the given period for the chart. | * **Start and End:** In this field a time interval can be entered as selection criteria to limit the given period for the chart. | ||
- | |||
===== 4. Further Criteria ===== | ===== 4. Further Criteria ===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_-_parameters.gif?direct}} | + | {{:en:handbuch:kapitel_2:gantt4.png|}} |
- | + | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_-_parameters2.gif?direct}} | + | |
- | + | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_-_parameters3.gif?direct}} | + | |
* **Display Mode:** Data can be selected with this element (only actual, only planned, planned and actual). With the option only planned, only the planned data is visualized, with the option only actual, only the actual data (from recording and estimations) is displayed and the option plannned and actual visualizes the planned data as well as the actual data. | * **Display Mode:** Data can be selected with this element (only actual, only planned, planned and actual). With the option only planned, only the planned data is visualized, with the option only actual, only the actual data (from recording and estimations) is displayed and the option plannned and actual visualizes the planned data as well as the actual data. | ||
Line 66: | Line 61: | ||
===== 5. Adjustment of Chart Display ===== | ===== 5. Adjustment of Chart Display ===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_-format.gif|}} | + | {{:en:handbuch:kapitel_2:gantt5.png|}} |
* **Width:** The width in pixel (px) is determined for the graphical chart in this field. | * **Width:** The width in pixel (px) is determined for the graphical chart in this field. | ||
Line 75: | Line 70: | ||
===== 6. Results===== | ===== 6. Results===== | ||
- | {{:en:handbuch:kapitel_2:gantt_diagramm_-_results.gif|}} | + | {{:en:handbuch:kapitel_2:gantt6.png|}} |
The results of the already processed chart are found in this tab. | The results of the already processed chart are found in this tab. |