User Tools

Site Tools


en:handbuch:kapitel_2:2.5.01_earned-value-analyse

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:2.5.01_earned-value-analyse [2009/10/08 16:13]
192.168.0.24
en:handbuch:kapitel_2:2.5.01_earned-value-analyse [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[2.05_auswertungssystem|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|next}}]] [[2.05_auswertungssystem|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|next}}]]
  
-====== 2.5.01 Earned-Value-Analysis ======+====== 2.05.01 Earned-Value-Analysis ======
  
 The chart **Earned-Value-Analysis** lists the planned and actual time/effort (in hours or person-days) for a project over any time period, as well as the degree of completion (progress for the previous period). From this data Earned Value and further key figures (BCWS, ACWP und BCWP) is determined. With Earned-Value-Analysis,​ not only the planned and actual values, but also a third value (BCWP, also stated in hours) can be used for the project evaluation. ​ The chart **Earned-Value-Analysis** lists the planned and actual time/effort (in hours or person-days) for a project over any time period, as well as the degree of completion (progress for the previous period). From this data Earned Value and further key figures (BCWS, ACWP und BCWP) is determined. With Earned-Value-Analysis,​ not only the planned and actual values, but also a third value (BCWP, also stated in hours) can be used for the project evaluation. ​
  
-**Tip:** For more on this subject see chapter [[4.5 Handling with Charts]] ​und [[4.5.01 Earned Value Analyse]] +**Tip:** For more on this subject see chapter [[en:​handbuch:​kapitel_4:​4.12_auswertungssystem| ​4.12 Applying ​Charts]] ​and [[en:​handbuch:​kapitel_3:3.12.01_ Earned-Value-Analyse|3.12.01 Earned Value Analysis]]
- +
-{{:en:​handbuch:​kapitel_2:earnd-value-analysis.gif?​direct}} +
- +
  
 The form consists of the following elements: The form consists of the following elements:
  
 ===== 1. Name ===== ===== 1. Name =====
 +
 +{{:​en:​handbuch:​kapitel_2:​earnedvalue1.1.png|}}
  
     * **Name:** In this field the name of the chart is defined, if this should be saved (for example, for the time service or for administrating the chart results).     * **Name:** In this field the name of the chart is defined, if this should be saved (for example, for the time service or for administrating the chart results).
Line 21: Line 19:
  
 ===== 2. Input Data ===== ===== 2. Input Data =====
 +
 +{{:​en:​handbuch:​kapitel_2:​earnedvaluechart1.2.png|}}
  
     * **Search:** With this select list "​professional search"​ can be used for the input data of the chart. This search entry must relate to the  supported catagories.     * **Search:** With this select list "​professional search"​ can be used for the input data of the chart. This search entry must relate to the  supported catagories.
     * **Search Machine: Search Word and Category** ​ This element is used to filter the selected data from the categories. Only the document type project is available for selection. How to operate the search machine is described in chapter 3.2.2.3 and can be performed, if necessary, a multiple amount of times. ​       * **Search Machine: Search Word and Category** ​ This element is used to filter the selected data from the categories. Only the document type project is available for selection. How to operate the search machine is described in chapter 3.2.2.3 and can be performed, if necessary, a multiple amount of times. ​  
     * **Input Data:** Under this field, the selected selection criteria for the chart are listed. This input data can derive from the "​professional search"​(Profisuche),​ the standard search machine or the personal clipboard.  ​     * **Input Data:** Under this field, the selected selection criteria for the chart are listed. This input data can derive from the "​professional search"​(Profisuche),​ the standard search machine or the personal clipboard.  ​
 +
  
 ===== 3. Main Parameters ===== ===== 3. Main Parameters =====
 +
 +{{:​en:​handbuch:​kapitel_2:​assessment1.3.png|}}
  
     * **Chart Period:** This drop-down box refers to the chart'​s time span (elements start and end) and allows a parameterised definition of the time span for the time services. ​ This selection (current week, current month, ..., next week, last week, ...) can be also used to simplify the manual definition of start and end.      * **Chart Period:** This drop-down box refers to the chart'​s time span (elements start and end) and allows a parameterised definition of the time span for the time services. ​ This selection (current week, current month, ..., next week, last week, ...) can be also used to simplify the manual definition of start and end. 
-    * **Start and End:** In this field a time interval can be entered as selection criteria to limit the given period for the chart. ​  +    * **Start and End:** In this field a time interval can be entered as selection criteria to limit the given period for the chart. ​
- +
-{{:​handbuch:​kapitel_2:​earnedvalue2.gif?​direct}} +
  
 ===== 4. Further Criteria ===== ===== 4. Further Criteria =====
  
- +{{:​en:​handbuch:​kapitel_2:​earnedvalue2.png|}} 
-{{:​en:​handbuch:​kapitel_2:​earnd-value-analysis3.gif?direct}}+
  
     * **Period:** In this drop-down box the attributes for the column of the tabular chart can be controlled. The periods for planned values, actual values and progress can be generated considering this selection (weekly, monthly and quarterly.     * **Period:** In this drop-down box the attributes for the column of the tabular chart can be controlled. The periods for planned values, actual values and progress can be generated considering this selection (weekly, monthly and quarterly.
Line 46: Line 45:
     * **Show as Person-Days :** When this option is active, all time/effort is displayed as person-days in the tabular chart (otherwise as hours). ​     * **Show as Person-Days :** When this option is active, all time/effort is displayed as person-days in the tabular chart (otherwise as hours). ​
     * **Show Costs:** When this option is active, all time/effort is displayed as EUR-Amounts in the tabular chart (otherwise as hours).     * **Show Costs:** When this option is active, all time/effort is displayed as EUR-Amounts in the tabular chart (otherwise as hours).
- 
- 
  
 ===== 5. Adjustment of Chart Display ​ ===== ===== 5. Adjustment of Chart Display ​ =====
  
-{{:​en:​handbuch:​kapitel_2:​earnd-value-analysis4.gif|}}    +{{:​en:​handbuch:​kapitel_2:​earnedvalue3.png|}}
  
-  ​* **Width:** The width in pixel (px) is determined for the graphical chart in this field. +   * **Width:** The width in pixel (px) is determined for the graphical chart in this field. 
-  * **Height:** The height in pixel (px) is determined for the graphical chart in this field. +   ​* **Height:** The height in pixel (px) is determined for the graphical chart in this field. 
-  * **Display:​** The generated chart can be generated in various formats with this selection. CHART (only graphical chart), CSV, HTML (standard setting), PDF, RTF (text processing),​ and XLS (MS Excel).+   ​* **Display:​** The generated chart can be generated in various formats with this selection. CHART (only graphical chart), CSV, HTML (standard setting), PDF, RTF (text processing),​ and XLS (MS Excel).
  
 ===== 6. Results ===== ===== 6. Results =====
  
-{{:​en:​handbuch:​kapitel_2:​earnd-value-analysis5.gif|}}+{{:​en:​handbuch:​kapitel_2:​earnedvalue4.png|}}
  
 The results of the already processed chart are found in this tab.  ​ The results of the already processed chart are found in this tab.  ​
en/handbuch/kapitel_2/2.5.01_earned-value-analyse.1255011185.txt.gz · Last modified: 2019/10/25 14:09 (external edit)