en:handbuch:kapitel_2:2.3.08_statusbericht

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:2.3.08_statusbericht [2009/09/11 16:55]
192.168.0.54
en:handbuch:kapitel_2:2.3.08_statusbericht [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[2.3.07_fremdkosten|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.04_fakturamodul_optional|{{|next}}]] [[2.3.07_fremdkosten|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.04_fakturamodul_optional|{{|next}}]]
  
-====== 2.3.08 Status Report ======+====== 2.03.08 Status Report ======
  
  
-Using the Status Report ​window ​allows evaluating a project at any given time. These subjective and/or qualitative ​charateristics ​are exchanged through quantitative key figures automatically for reporting. Using the information of this window ​and the evaluation system, an rtf-file is produced, which consists of information about the evaluation and decision demand, time/effort and cost information and Earned-Value-Analysis. ​+Using the **Status Report** form allows evaluating a project at any given time. These subjective and/or qualitative ​characteristics ​are exchanged through quantitative key figures automatically for reporting. Using the information of this form and the evaluation system, an rtf-file is produced, which consists of information about the evaluation and decision demand, time/effort and cost information and Earned-Value-Analysis. ​
  
-**Tip:** For more on this subject see chapter [[4.3.07 Statusbericht erfassen]].+{{:en:​handbuch:​kapitel_2:​projectreport1.png|}}
  
-{{:​handbuch:​kapitel_2:​statusbericht1.gif?​direct}} +The form consists of the following elements:
- +
-The window ​consists of the following elements:+
  
 On the "​Master Data" tab: On the "​Master Data" tab:
  
     * **Number:** This alphanumerical field specifies the status report distinctly in the system.     * **Number:** This alphanumerical field specifies the status report distinctly in the system.
-    * **Project:​** This field defines the project, to which the defined process belongs. A process can be assigned to a parent project as well as a sub-project. The projects can be defined and modified in the project ​window.  ​+    * **Project:​** This field defines the project, to which the defined process belongs. A process can be assigned to a parent project as well as a sub-project. The projects can be defined and modified in the project ​form.  ​
     * **Report Date:** The field report date specifies the date and time of the status report. By default, the current date is pre-occupied from the system.     * **Report Date:** The field report date specifies the date and time of the status report. By default, the current date is pre-occupied from the system.
-    * **Employee:​** The employee responsible for the status report is pre-occupied here. The employees are administered in the Employee ​window.+    * **Employee:​** The employee responsible for the status report is pre-occupied here. The employees are administered in the Employee ​form.
     * **Deadline Status :** The deadline status of the project is entered here from the user. In the standard the status 0 - Favorable, 1- Scheduled, 2 - Problematic und 3 - Critical are stored. The status can be defined and modified in Collections (ProjectReportStates).     * **Deadline Status :** The deadline status of the project is entered here from the user. In the standard the status 0 - Favorable, 1- Scheduled, 2 - Problematic und 3 - Critical are stored. The status can be defined and modified in Collections (ProjectReportStates).
     * **Cost Status:** The cost status of the project is entered here from the user. In the standard the status 0 - Favorable, 1- Scheduled, 2 - Problematic und 3 - Critical are stored. The status can be defined and modified in Collections (ProjectReportStates). ​     * **Cost Status:** The cost status of the project is entered here from the user. In the standard the status 0 - Favorable, 1- Scheduled, 2 - Problematic und 3 - Critical are stored. The status can be defined and modified in Collections (ProjectReportStates). ​
Line 27: Line 25:
     * **Comments:​** This field is designated for comments concerning the status report.     * **Comments:​** This field is designated for comments concerning the status report.
  
-{{:​handbuch:​kapitel_2:​statusbericht2.gif?direct}}+{{:en:​handbuch:​kapitel_2:​projectreport2.png|}}
  
 On the "​Comments"​ tab: On the "​Comments"​ tab:
Line 33: Line 31:
     * **Comments - Critical, Problematic,​ Scheduled and Favorable:​** If applicable, comments concerning the status messages deadlines, cost and quality (see Master data) are stored. .     * **Comments - Critical, Problematic,​ Scheduled and Favorable:​** If applicable, comments concerning the status messages deadlines, cost and quality (see Master data) are stored. .
     * **Positive and Negative Remarks:** Positive und negative remarks for the progress of the project can be stored here.      * **Positive and Negative Remarks:** Positive und negative remarks for the progress of the project can be stored here. 
-    * **Critical ​Faktors/Risks:** Critical factors and/or risks for the progress of the project can be stored here. The risk management module is a further possibility to administer risks for the project. +    * **Critical ​Factors/Risks:** Critical factors and/or risks for the progress of the project can be stored here. The risk management module is a further possibility to administer risks for the project. 
-    * **Change Requests:** Change requests for the project can be stored here. The project change ​window ​offers a further possibility to store change request for the project.+    * **Change Requests:** Change requests for the project can be stored here. The project change ​form offers a further possibility to store change request for the project.
  
-{{:​handbuch:​kapitel_2:​statusbericht3.gif?direct}}+{{:en:​handbuch:​kapitel_2:​projectreport3.png|}}
  
 On the "​Decision Demand"​ tab: On the "​Decision Demand"​ tab:
Line 44: Line 42:
     * **Date (1 bis 3):** The due date for the decision can be stored here.     * **Date (1 bis 3):** The due date for the decision can be stored here.
  
-The window ​consists of the following action:+The form consists of the following action:
  
     * **Print Status Report:** Using this action, a complete status report can be generated in rtf-format. The created document can be printed through the browser or in a standard text editor.     * **Print Status Report:** Using this action, a complete status report can be generated in rtf-format. The created document can be printed through the browser or in a standard text editor.