en:handbuch:kapitel_2:2.02.12_statusbericht

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:2.02.12_statusbericht [2009/07/15 08:23]
192.168.0.49
en:handbuch:kapitel_2:2.02.12_statusbericht [2019/10/25 14:11] (current)
Line 1: Line 1:
-[[2.02.11_projektweiser_mitarbeitersatz|{{|zurück}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.02.13_projektaenderungsantrag|{{|weiter}}]] +[[2.02.11_projektweiser_mitarbeitersatz|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.02.13_projektaenderungsantrag|{{|next}}]] 
-====== 2.02.12 Statusbericht ​======+====== 2.02.11 Statusreport ​======
  
  
-Die Maske Statusbericht ... +The Mask Statusreport consists of the following elements:
  
 +{{:​en:​handbuch:​kapitel_2:​statusreport1.png|}}
 +
 +On the "​Master data" tab:
 +
 +    * **Number:** In this field the number of the status report will assign automatically from system.
 +    * **Project:​** In this field the project, which was selected at the beginning of the status report put on, is indicated.
 +    * **Report date:** In this selection window the date and the time are indicated, on which one set the status report.
 +    * **Employee:​** In this field the coworker is indicated, who put on the status report.
 +    * **Status of appointment,​ Cost and Quality:** In these selection fields the status of the dates, costs and the quality can be specified. To the selection stand favorable, regular, problematic and critical.
 +    * **Rest of the personal contribution,​ external service and the material costs:** Into this fields estimated residual values in EUR can be deposited concerning own, foreign achievement,​ as well as non-personnel costs.
 +    * **Expected Projectenddate:​** In this selection box a date is specified, at which the project is to be finished. ​
 +    * **Comments:​** This field makes the input of remark possible to the opened status report.
 +
 +{{:​en:​handbuch:​kapitel_2:​statusreport2.png|}}
 +
 +On the "​Comments"​ tab: 
 +
 +    * **Comments:​** In these fields comments can be noted to the following listed points, (critically,​ problematic,​ regular, favorable).
 +    * **Positive and negative Notes:** These fields make the input of positive or negative notes possible to the status report put on.
 +    * **Critical Factors/​Risks:​** Into this text fields the project manager can deposit critical factors or risks, which could arise in the project or already arose.
 +    * **Project-CRs:​** Here associated requests for modification can be deposited in text form the project.
 +
 +{{:​en:​handbuch:​kapitel_2:​statusreport3.png|}}
 +
 +On the "​DecisionDemand":​
 +
 +    * **DemandDesicion (1-10):** In this field a name for the desion need can be assigned at will.
 +    * **Employee:​** This field makes the input possible of the coworker concerned.
 +    * **Contact:​** This field specifies the contact person from the customer for the statusreport.
 +    * **Date:** In this field the date, at which the decision need is to be locked, can be registered.  ​
en/handbuch/kapitel_2/2.02.12_statusbericht.1247639020.txt.gz · Last modified: 2019/10/25 14:09 (external edit)