- | ====== 2.02.12 Statusbericht ====== | + | ====== 2.02.11 Statusreport ====== |
- | Die Maske Statusbericht ... | + | The Mask Statusreport consists of the following elements: |
+ | {{:en:handbuch:kapitel_2:statusreport1.png|}} | ||
+ | |||
+ | On the "Master data" tab: | ||
+ | |||
+ | * **Number:** In this field the number of the status report will assign automatically from system. | ||
+ | * **Project:** In this field the project, which was selected at the beginning of the status report put on, is indicated. | ||
+ | * **Report date:** In this selection window the date and the time are indicated, on which one set the status report. | ||
+ | * **Employee:** In this field the coworker is indicated, who put on the status report. | ||
+ | * **Status of appointment, Cost and Quality:** In these selection fields the status of the dates, costs and the quality can be specified. To the selection stand favorable, regular, problematic and critical. | ||
+ | * **Rest of the personal contribution, external service and the material costs:** Into this fields estimated residual values in EUR can be deposited concerning own, foreign achievement, as well as non-personnel costs. | ||
+ | * **Expected Projectenddate:** In this selection box a date is specified, at which the project is to be finished. | ||
+ | * **Comments:** This field makes the input of remark possible to the opened status report. | ||
+ | |||
+ | {{:en:handbuch:kapitel_2:statusreport2.png|}} | ||
+ | |||
+ | On the "Comments" tab: | ||
+ | |||
+ | * **Comments:** In these fields comments can be noted to the following listed points, (critically, problematic, regular, favorable). | ||
+ | * **Positive and negative Notes:** These fields make the input of positive or negative notes possible to the status report put on. | ||
+ | * **Critical Factors/Risks:** Into this text fields the project manager can deposit critical factors or risks, which could arise in the project or already arose. | ||
+ | * **Project-CRs:** Here associated requests for modification can be deposited in text form the project. | ||
+ | |||
+ | {{:en:handbuch:kapitel_2:statusreport3.png|}} | ||
+ | |||
+ | On the "DecisionDemand": | ||
+ | |||
+ | * **DemandDesicion (1-10):** In this field a name for the desion need can be assigned at will. | ||
+ | * **Employee:** This field makes the input possible of the coworker concerned. | ||
+ | * **Contact:** This field specifies the contact person from the customer for the statusreport. | ||
+ | * **Date:** In this field the date, at which the decision need is to be locked, can be registered. |