User Tools

Site Tools


en:handbuch:kapitel_2:2.02.04_arbeitspaket

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:2.02.04_arbeitspaket [2012/03/26 15:05]
192.168.0.65
en:handbuch:kapitel_2:2.02.04_arbeitspaket [2019/10/25 14:11] (current)
Line 23: Line 23:
     * **Priority:​** This field specifies the priority of the selected job. The greater the priority is, the higher the job is displayed (if the display should be effected by the criteria Priority)     * **Priority:​** This field specifies the priority of the selected job. The greater the priority is, the higher the job is displayed (if the display should be effected by the criteria Priority)
     * **Actual End:** This field specifies the completion date of the job. The job must be closed from the user or project leader after the tasks have been completely worked through. A job must be either closed in the document itself or from the time tracking component.     * **Actual End:** This field specifies the completion date of the job. The job must be closed from the user or project leader after the tasks have been completely worked through. A job must be either closed in the document itself or from the time tracking component.
-    **Note:** It is not mandatory to assign a job to a project; jobs without a project will only be considered by employee-based analyses and not in the project analysis.+    ​ 
 + **Note:** It is not mandatory to assign a job to a project; jobs without a project will only be considered by employee-based analyses and not in the project analysis.
  
 {{:​en:​handbuch:​kapitel_2:​job2.png|}} {{:​en:​handbuch:​kapitel_2:​job2.png|}}
en/handbuch/kapitel_2/2.02.04_arbeitspaket.1332767129.txt.gz · Last modified: 2019/10/25 14:09 (external edit)