This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:handbuch:kapitel_2:2.02.04_arbeitspaket [2012/03/26 15:05] 192.168.0.65 |
en:handbuch:kapitel_2:2.02.04_arbeitspaket [2019/10/25 14:11] (current) |
||
---|---|---|---|
Line 23: | Line 23: | ||
* **Priority:** This field specifies the priority of the selected job. The greater the priority is, the higher the job is displayed (if the display should be effected by the criteria Priority) | * **Priority:** This field specifies the priority of the selected job. The greater the priority is, the higher the job is displayed (if the display should be effected by the criteria Priority) | ||
* **Actual End:** This field specifies the completion date of the job. The job must be closed from the user or project leader after the tasks have been completely worked through. A job must be either closed in the document itself or from the time tracking component. | * **Actual End:** This field specifies the completion date of the job. The job must be closed from the user or project leader after the tasks have been completely worked through. A job must be either closed in the document itself or from the time tracking component. | ||
- | **Note:** It is not mandatory to assign a job to a project; jobs without a project will only be considered by employee-based analyses and not in the project analysis. | + | |
+ | **Note:** It is not mandatory to assign a job to a project; jobs without a project will only be considered by employee-based analyses and not in the project analysis. | ||
{{:en:handbuch:kapitel_2:job2.png|}} | {{:en:handbuch:kapitel_2:job2.png|}} |