This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:handbuch:kapitel_2:2.02.02_projekt [2012/03/26 12:42] 192.168.0.65 |
en:handbuch:kapitel_2:2.02.02_projekt [2019/10/25 14:11] (current) |
||
---|---|---|---|
Line 134: | Line 134: | ||
* ** Time recording only after planned begin date:** This flag controls the properties of the job of the project. If this box is marked, the job in TimeTracker can only be entered when the planned begin of the job is reached. | * ** Time recording only after planned begin date:** This flag controls the properties of the job of the project. If this box is marked, the job in TimeTracker can only be entered when the planned begin of the job is reached. | ||
* **Time recording only after planned end date:** This flag controls the properties of the job of the project. If this box is marked, the job in TimeTracker can only be entered as long as the planned end of the project is not reached. | * **Time recording only after planned end date:** This flag controls the properties of the job of the project. If this box is marked, the job in TimeTracker can only be entered as long as the planned end of the project is not reached. | ||
+ | * **Checked Assesstime:** | ||
+ | * **Checked tracked time:** | ||
* **Operation Activity:** This flag controls the properties of the job of the project. This flag is analysis criteria for the capacity analysis and is used, for example, for internal projects or long-term projects, in order not to consider the staff workload. | * **Operation Activity:** This flag controls the properties of the job of the project. This flag is analysis criteria for the capacity analysis and is used, for example, for internal projects or long-term projects, in order not to consider the staff workload. | ||
* **Components, Change Requests:** When using the module "project documentation" references to the product structure and the change requests can be stored here. | * **Components, Change Requests:** When using the module "project documentation" references to the product structure and the change requests can be stored here. | ||
Line 141: | Line 143: | ||
On the "Back references" tab: | On the "Back references" tab: | ||
+ | |||
+ | * **Offer Headers:** | ||
+ | * **Invoice Headers:** | ||
+ | * **Confirmation Headers:** | ||
+ | * **Contracts:** | ||
+ | * **Drives:** | ||
+ | * **Foreign Invoice Lines:** | ||
+ | * **Item Sheets:** | ||
+ | * **Order Lines:** | ||
+ | * **Projectwise Occupations:** | ||
+ | * **Receipts:** | ||
+ | * **Travels:** | ||
The form contains the following actions: | The form contains the following actions: | ||
- | * **Project Planning (also {{:handbuch:kapitel_1:timing.gif?nolink}}-Button) {{:handbuch:kapitel_1:timing.gif?nolink}}:** When using this action the extended project planning on the basis of the network planning technique can be used . (see also chapter 4-2-1-5 Calculating the project plan - appointment scheduling). | + | * **Project Planning (also {{:en:handbuch:kapitel_2:project_planning_button.png|}}-Button):** When using this action the extended project planning on the basis of the network planning technique can be used . (see also chapter 4-2-1-5 Calculating the project plan - appointment scheduling). |
- | * **Refresh price table (also {{:handbuch:kapitel_1:recalculate.gif?nolink}}-Button) {{:handbuch:kapitel_1:recalculate.gif?nolink}}:** When using this action all values in the budget tab are recalculated and/or refreshed. | + | * **Refresh price table (also {{:en:handbuch:kapitel_2:refresh_pricetable_button.png|}}-Button):** When using this action all values in the budget tab are recalculated and/or refreshed. |
- | * **Set project status:** When using this action the project status can be modified. According to the current status of the project, various attributes are available (project passive, open offer, advance performance, project active, project completed, ... ). Status changes affect the complete project structure (also including all sub-projects). For further information see chapter 4.2 Projects. | + | * **Set project status (also {{:en:handbuch:kapitel_2:project_status_button.png|}}-Button):** When using this action the project status can be modified. According to the current status of the project, various attributes are available (project passive, open offer, advance performance, project active, project completed, ... ). Status changes affect the complete project structure (also including all sub-projects). For further information see chapter 4.2 Projects. |
* **Create project-based occupations:** When using this action, price tables (see also pricing and project-based occupations) can be defined project-related. | * **Create project-based occupations:** When using this action, price tables (see also pricing and project-based occupations) can be defined project-related. | ||
* **Show project-based occupations:** When using this action all product-related occupations of this project as aolee as all sub-projects are shown. | * **Show project-based occupations:** When using this action all product-related occupations of this project as aolee as all sub-projects are shown. |