User Tools

Site Tools


en:handbuch:kapitel_2:2.01.25_basic_-_mitarbeitervertrag

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:handbuch:kapitel_2:2.01.25_basic_-_mitarbeitervertrag [2009/10/07 12:00]
192.168.0.24
en:handbuch:kapitel_2:2.01.25_basic_-_mitarbeitervertrag [2019/10/25 14:11] (current)
Line 1: Line 1:
 [[2.01.24_basic_-_mitarbeiter|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.01.26_basic_-_mitarbeiterzeitbuchung|{{|next}}]] [[2.01.24_basic_-_mitarbeiter|{{|previous}}]] [[en:​handbuch:​handbuch|{{|Home}}]] [[2.01.26_basic_-_mitarbeiterzeitbuchung|{{|next}}]]
  
-====== 2.01.25 Employment Contract ======+====== 2.01.24 Employment Contract ======
  
 The **Employment Contract** form administers the work time contracts from employees. With the contracts, the main data for the employees, as, e.g. the contract duration, holiday entitlement,​ flexible time buffer, daily work hours and the maximum capacity are displayed. The contracts have a defined validity. ​ If no valid contract is assigned, the system uses the master data from the employee administration. Once defined contracts can only be deleted or restricted. The **Employment Contract** form administers the work time contracts from employees. With the contracts, the main data for the employees, as, e.g. the contract duration, holiday entitlement,​ flexible time buffer, daily work hours and the maximum capacity are displayed. The contracts have a defined validity. ​ If no valid contract is assigned, the system uses the master data from the employee administration. Once defined contracts can only be deleted or restricted.
  
-Note: This component is only availableif Work Time Management ​is licenced.+Note: This component is only available if [[en:​handbuch:​kapitel_3:​3.11.07_arbeitszeitverwaltung|Working ​Time Administration]] ​is licensed.
  
 +**Tip:** For more on this subject see chapter [[en:​handbuch:​kapitel_3:​3.11.07 Arbeitszeitverwaltung|3.11.07 Working Time Administration]].
  
-**Tip:** For more on this subject see chapter [[4.1.07 Work Time Administration]]. +{{:​en:​handbuch:​kapitel_2:​employee_contract1.png|}}
- +
-{{:​handbuch:​kapitel_2:​vertrag1.gif?​direct}} +
- +
-{{:​en:​handbuch:​kapitel_2:​contract.gif?direct}}+
  
 The form consists of the following elements: The form consists of the following elements:
Line 29: Line 26:
     * **Allowed Special Hours Lower Deviation:​** If the employee goes below this defined hour value, the system sends the user a warning. ​     * **Allowed Special Hours Lower Deviation:​** If the employee goes below this defined hour value, the system sends the user a warning. ​
     * **Periods:​** The drop-down box periods defines the duration for the maximum flexible time, allowed set-time lower deviation, maximum special time buffer and the allowed special time lower deviation. ​     * **Periods:​** The drop-down box periods defines the duration for the maximum flexible time, allowed set-time lower deviation, maximum special time buffer and the allowed special time lower deviation. ​
-    * **Non-Tariff Contract:** This field specifies employees without a tariff contract. The work time administration ​considers when posting, only vacation and does not designate a flexible time buffer. ​+    * **Non-Tariff Contract:** This field specifies employees without a tariff contract. The [[en:​handbuch:​kapitel_3:​3.11.07_arbeitszeitverwaltung_fortsetzung|Working Time Administration]] ​considers when posting, only vacation and does not designate a flexible time buffer. ​
  
-{{:​handbuch:​kapitel_2:​vertrag2.gif?​direct}} +{{:​en:​handbuch:​kapitel_2:​employee_contract2.png|}}
- +
-{{:​en:​handbuch:​kapitel_2:​contract2.gif?direct}}+
  
 On the "​Utilization"​ tab: On the "​Utilization"​ tab:
  
     * **Max. Capacity:** This value specifies to how much percent the user can be planned for within the projects. ​     * **Max. Capacity:** This value specifies to how much percent the user can be planned for within the projects. ​
-    * **Max. Work Time:** This value defines the maximum work time for the employee ​refering ​to the standard work time (see also Calendar). For example, a part-time job has the value 50%.+    * **Max. Work Time:** This value defines the maximum work time for the employee ​referring ​to the standard work time (see also Calendar). For example, a part-time job has the value 50%.
     * **Set-Time Monday to Sunday:** Differing work times per day for the employee and/or employment contract can be defined here. If an employee works part-time and does not work an all workdays, an appropriate settlement can be illustrated here. For example, an employee works 20 hours per week on the first three workdays => Monday = 7h, Tuesday = 7h and Wednesday = 6h.     * **Set-Time Monday to Sunday:** Differing work times per day for the employee and/or employment contract can be defined here. If an employee works part-time and does not work an all workdays, an appropriate settlement can be illustrated here. For example, an employee works 20 hours per week on the first three workdays => Monday = 7h, Tuesday = 7h and Wednesday = 6h.
  
-{{:​handbuch:​kapitel_2:​vertrag2.gif?​direct}} +{{:​en:​handbuch:​kapitel_2:​employee_contract3.png|}}
- +
-{{:​en:​handbuch:​kapitel_2:​contract3.gif?direct}}+
  
 On the "​Wages"​ tab: On the "​Wages"​ tab:
  
-    * **Cost/​Charge Rate 1 (Internal Hourly Rate):** The internal cost/charge rate of the employee for [[|costing]] in the system is defined in this field. ​+    * **Cost/​Charge Rate 1 (Internal Hourly Rate):** The internal cost/charge rate of the employee for [[en:​handbuch:​kapitel_a:​glossar#​Costing]] in the system is defined in this field. ​
     * **Cost/​Charge Rate 2 (Partial Cost Rate):** A further cost/charge rate per employee can be utilised with the help of this element (e.g. full and partial cost rate).     * **Cost/​Charge Rate 2 (Partial Cost Rate):** A further cost/charge rate per employee can be utilised with the help of this element (e.g. full and partial cost rate).
     * **Monthly Wage, Yearly Wage, Amount of Monthly Wages:** These fields describe the employee'​s wages in the contract'​s time span and are applied when utilising the HR-interface.     * **Monthly Wage, Yearly Wage, Amount of Monthly Wages:** These fields describe the employee'​s wages in the contract'​s time span and are applied when utilising the HR-interface.
     * **Comments:​** This field is designated for comments.     * **Comments:​** This field is designated for comments.
 +
 +This dokument includes the following actions:
 +
 +    * **Set Date:** This action is used to enter the contract duration (start to end)
 +    * **Delete:** This action deletes the employee contract completely. ​
 +    * **Create new Dokument from  Template:** This action opens a new contract from the existing template.
en/handbuch/kapitel_2/2.01.25_basic_-_mitarbeitervertrag.1254909620.txt.gz · Last modified: 2019/10/25 14:09 (external edit)