User Tools

Site Tools


en:gui5:handbuch:kapitel_2:2.5.08_portfolio-auswertung

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:gui5:handbuch:kapitel_2:2.5.08_portfolio-auswertung [2020/04/02 13:03]
peter [2.05.07 Portfolio Evaluation]
en:gui5:handbuch:kapitel_2:2.5.08_portfolio-auswertung [2021/12/14 11:36] (current)
alexandra [1. Name]
Line 5: Line 5:
  
  
-{{:​gui5:​handbuch:​kapitel_2:​2.05.07-1.png|}} +{{:en:​gui5:​handbuch:​kapitel_2:​bildschirmfoto_2021-06-11_um_16.44.13.png?|}} 
- +{{:en:​gui5:​handbuch:​kapitel_2:​bildschirmfoto_2021-06-11_um_16.44.22.png?|}}
-{{:​gui5:​handbuch:​kapitel_2:​port5.png|}}+
  
 The mask consists of the following elements: The mask consists of the following elements:
Line 13: Line 12:
 ===== 1. Name ===== ===== 1. Name =====
  
-    * **Bezeichnung:** In diesem Feld wird die Bezeichnung der Auswertung definiertfalls diese gespeichert werden soll (beispielsweise für die [[gui5:​handbuch:​kapitel_2:​2.01.03_system_-_zeitdienst|Zeitdienste]] oder zum Verwalten der Auswertungsergebnisse). +    * **Name:** In this fieldyou define the name of the evaluation if it is to be saved (for example, for time services or to manage the evaluation results). 
-    * **Auswertung:** Die Portfolio-Auswertung besteht aus der Auswertung Portfolio-Diagrammdieses generiert tabellarische oder graphische Auswertungen bezüglich der Informationen ​in der X-, Y-, Z-und FarbkategorieAls Kennzahlen für die X-, Y- und Z-Achse stehen AngebotswertFertigstellung ​Ist-ZeitIstkostenPlan-UmsatzPlandauerPlankostenRechnungswert und Wahrscheinlichkeit zur VerfügungAls Kennzahlen für die Farbkategorie stehen bis zu fünf Projektkategorien ​(beispielsweise Projektart), die Priorität und der Projektstatus zur Verfügung+    * **Evaluation:** The portfolio evaluation consists of the evaluation portfolio diagramwhich generates tabular or graphical evaluations with regard to the information ​in the X, Y, Z and color categoriesThe key figures available for the X, Y and axes are quotation valuecompletionactual timeactual costsplanned salesplanned durationplanned costsinvoice value and probabilityUp to five project categories ​(such as project type), priority, and project status are available as key figures for the color category
-    * **Report-Zusammenstellung:** In diesem Feld kann die neue Report-Zusammenstellung ausgewählt werden.+    * **Report ​Selection:** In this field the new report selection can be selected. 
 ===== 2. Input Data ===== ===== 2. Input Data =====
    
Line 24: Line 24:
  
     * **X, Y, Z Category and the Color Category:** These selection boxes refer to the evaluation axes and support the above mentioned key figures.     * **X, Y, Z Category and the Color Category:** These selection boxes refer to the evaluation axes and support the above mentioned key figures.
- 
-{{:​gui5:​handbuch:​kapitel_2:​2.05.07-2.png|}} 
- 
  
  
-{{:​gui5:​handbuch:​kapitel_2:​2.05.07-3.png|}}+{{:en:​gui5:​handbuch:​kapitel_2:​bildschirmfoto_2021-06-11_um_16.44.32.png?|}}
  
 ===== 4. Settings for View ===== ===== 4. Settings for View =====
Line 39: Line 36:
     * **Display Evaluation Parameters:​** Here you select whether the evaluation parameters are displayed.     * **Display Evaluation Parameters:​** Here you select whether the evaluation parameters are displayed.
  
-{{:​gui5:​handbuch:​kapitel_2:​2.05.07-4.png|}}+{{:en:​gui5:​handbuch:​kapitel_2:​bildschirmfoto_2021-06-11_um_16.44.45.png?|}}
  
  
en/gui5/handbuch/kapitel_2/2.5.08_portfolio-auswertung.1585825407.txt.gz · Last modified: 2020/04/02 13:03 by peter