This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:gui5:handbuch:kapitel_2:2.5.07_mitarbeiterauswertung [2020/04/02 12:33] peter |
en:gui5:handbuch:kapitel_2:2.5.07_mitarbeiterauswertung [2021/12/14 11:35] (current) alexandra [1. Name] |
||
---|---|---|---|
Line 1: | Line 1: | ||
[[2.5.05_kontaktauswertung|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.08_portfolio-auswertung|{{|Next}}]] | [[2.5.05_kontaktauswertung|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.08_portfolio-auswertung|{{|Next}}]] | ||
- | ====== 2.05.06 Employee Evaluation ====== | + | ====== 2.05.06 Employee Chart ====== |
The employee evaluation realizes the employee-related evaluations and overviews regarding utilization and capacities. These include general overviews, time and activity statements, plan/actual comparisons, capacity utilization and capacity evaluations and overviews of absences (vacation, illness, etc.). | The employee evaluation realizes the employee-related evaluations and overviews regarding utilization and capacities. These include general overviews, time and activity statements, plan/actual comparisons, capacity utilization and capacity evaluations and overviews of absences (vacation, illness, etc.). | ||
- | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.28.16.png?|}} | |
- | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.28.26.png?|}} | |
- | + | ||
- | {{:gui5:handbuch:kapitel_2:2.05.06-1.png|}} | + | |
Line 36: | Line 34: | ||
* Calendar Overview I and II | * Calendar Overview I and II | ||
- | * **Report Compilation:** In this field the new report compilation can be selected. | + | * **Report Selection:** In this field the new report selection can be selected. |
===== 2. Input Data ===== | ===== 2. Input Data ===== | ||
Line 49: | Line 48: | ||
* **Start and End:** In these fields, you can enter a time interval as a selection criterion to limit the analysis period for the evaluation. | * **Start and End:** In these fields, you can enter a time interval as a selection criterion to limit the analysis period for the evaluation. | ||
- | {{:gui5:handbuch:kapitel_2:2.05.06-2.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.28.37.png?|}} |
- | {{:gui5:handbuch:kapitel_2:mitarbe2.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.28.49.png?|}} |
Line 60: | Line 58: | ||
* **External Order:** This selection refers to the external indicator of the project and restricts the selection of the project accordingly (only external projects are displayed). | * **External Order:** This selection refers to the external indicator of the project and restricts the selection of the project accordingly (only external projects are displayed). | ||
* **Period:** This selection box is used in the capacity evaluation to define a period (weekly, monthly, ...) for the capacities for the selected employees. | * **Period:** This selection box is used in the capacity evaluation to define a period (weekly, monthly, ...) for the capacities for the selected employees. | ||
- | * **Vormonat und Gleitzeit einbeziehen:** Die Option Vormonat einbeziehen berücksichtigt die Gleitzeitstunden (Über- oder Unterstunden) des Vormonats und die Option Gleitzeit einbeziehen berücksichtigt alle Gleitzeiten (vom ersten Mitarbeitervertrag; siehe auch [[gui5:handbuch:kapitel_3:3.11.07_arbeitszeitverwaltung|Arbeitszeitverwaltung]]). | + | * **Include Previous Month and Flexitime:** The include previous month option takes into account the flextime hours (overtime or undertime) of the previous month and the Include flextime option takes into account all flextime (from the first employee contract; see also Working Time Management). |
- | * **Dokumente ohne Istaufwand:** Diese Option steuert, ob in der generierten Auswertung auch Zeilen ohne Aufwände aufgelistet werden sollen (Kennzeichen gesetzt) oder unterdrückt werden sollen (Kennzeichen nicht gesetzt) | + | * **Documents without Actual Effort:** This option controls whether lines without actual effort should also be listed in the generated report (indicator set) or suppressed (indicator not set). |
- | * **Arbeitspakete im Detail:** Dieses Kennzeichen steuert, ob in der generierten Auswertung [[gui5:handbuch:kapitel_2:2.02.04_arbeitspaket|Arbeitspakete]] (Kennzeichen gesetzt) oder [[gui5:handbuch:kapitel_2:2.02.03_vorgang|Vorgänge]] (Kennzeichen nicht gesetzt) angezeigt werden sollen. | + | * **Work Packages in Detail:** This indicator controls whether work packages (indicator set) or operations (indicator not set) should be displayed in the generated evaluation. |
- | * **Eine Zeile pro Zeiterfassung:** Dieses Kennzeichen steuert, ob in der generierten Auswertung eine Zeile pro Zeiterfassung angezeigt werden soll. Ist das Kennzeichen nicht gesetzt, wird eine Zeile pro Arbeitspaket angezeigt. | + | * **One Line per Time Recording:** This indicator controls whether one line per time recording should be displayed in the generated evaluation. If the indicator is not set, one line is displayed per work package. |
- | {{:gui5:handbuch:kapitel_2:2.05.06-3.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.28.58.png?|}} |
Line 79: | Line 77: | ||
* **Display Evaluation Parameters:** Here you can select whether the evaluation parameters are to be displayed. | * **Display Evaluation Parameters:** Here you can select whether the evaluation parameters are to be displayed. | ||
- | {{:gui5:handbuch:kapitel_2:2.05.06-4.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_16.29.04.png?|}} |