This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
en:gui5:handbuch:kapitel_2:2.5.01_earned-value-analyse [2020/03/20 13:53] peter [5. View Settings] |
en:gui5:handbuch:kapitel_2:2.5.01_earned-value-analyse [2021/12/14 11:35] (current) alexandra [1. Name] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| [[2.05_auswertungssystem|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|Next}}]] | [[2.05_auswertungssystem|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|Next}}]] | ||
| - | ====== 2.05.01 Earned Value Analysis ====== | + | ====== 2.05.01 Earned Value Chart ====== |
| The Earned Value Analysis report lists the planned and actual expenses (in hours or man-days) as well as the percentage of completion (progress to previous period) for a project over any period. The so-called earned value and other key figures (BCWS, ACWP and BCWP) are determined from this data. The special feature of Earned Value Analysis is that the BCWP is used for project assessment as the third variable of the same unit in addition to the planned and actual values. | The Earned Value Analysis report lists the planned and actual expenses (in hours or man-days) as well as the percentage of completion (progress to previous period) for a project over any period. The so-called earned value and other key figures (BCWS, ACWP and BCWP) are determined from this data. The special feature of Earned Value Analysis is that the BCWP is used for project assessment as the third variable of the same unit in addition to the planned and actual values. | ||
| - | {{:gui5:handbuch:kapitel_2:2.05.01-1.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.28.png?|}} |
| + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.39.png?|}} | ||
| The mask consists of the following elements: | The mask consists of the following elements: | ||
| Line 14: | Line 15: | ||
| * **Name:** In this field the name of the evaluation is defined if it is to be saved (for example, for [[..:kapitel_2:2.01.03_system_-_zeitdienst|time services]] or to manage the evaluation results). | * **Name:** In this field the name of the evaluation is defined if it is to be saved (for example, for [[..:kapitel_2:2.01.03_system_-_zeitdienst|time services]] or to manage the evaluation results). | ||
| * **Evaluation:** The Earned Value Analysis contains the Earned Value Analysis. This evaluation generates the Earned Value Analysis for a selected project. The planned values, the actual values and the progress for the project structure or other criteria are deducted periodically. The earned value is calculated from the progress of the period (difference between the percentage of completion of the period under consideration and the previous period) and the total planned expenditure. The key figures BCWS, ACWP and BCWP are also determined here and the results are visualized in two figures. | * **Evaluation:** The Earned Value Analysis contains the Earned Value Analysis. This evaluation generates the Earned Value Analysis for a selected project. The planned values, the actual values and the progress for the project structure or other criteria are deducted periodically. The earned value is calculated from the progress of the period (difference between the percentage of completion of the period under consideration and the previous period) and the total planned expenditure. The key figures BCWS, ACWP and BCWP are also determined here and the results are visualized in two figures. | ||
| - | * **Report Compilation:** FIXME | + | * **Report Selection:** In this field the new report selection can be selected. |
| ===== 2. Input Data ===== | ===== 2. Input Data ===== | ||
| Line 27: | Line 29: | ||
| * **Start and End:** In these fields, you can enter a time interval as a selection criterion to limit the analysis period for the evaluation. | * **Start and End:** In these fields, you can enter a time interval as a selection criterion to limit the analysis period for the evaluation. | ||
| - | {{:gui5:handbuch:kapitel_2:2.05.01-2.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.59.png?|}} |
| Line 41: | Line 43: | ||
| * **Display Costs:** If this option is active, all expenses are displayed in the tabular evaluation as EUR amounts (otherwise as hours). | * **Display Costs:** If this option is active, all expenses are displayed in the tabular evaluation as EUR amounts (otherwise as hours). | ||
| - | {{:gui5:handbuch:kapitel_2:2.05.01-3.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.44.07.png?|}} |
| ===== 5. View Settings ===== | ===== 5. View Settings ===== | ||
| Line 51: | Line 52: | ||
| * **Display Evaluation:** Here you can select whether the evaluation parameters are to be displayed. | * **Display Evaluation:** Here you can select whether the evaluation parameters are to be displayed. | ||
| - | {{:gui5:handbuch:kapitel_2:2.05.01-4.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.44.11.png?|}} |