This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
en:gui5:handbuch:kapitel_2:2.5.01_earned-value-analyse [2020/03/20 13:35] peter |
en:gui5:handbuch:kapitel_2:2.5.01_earned-value-analyse [2021/12/14 11:35] (current) alexandra [1. Name] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| [[2.05_auswertungssystem|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|Next}}]] | [[2.05_auswertungssystem|{{|Back}}]] [[..:handbuch|{{|Home}}]] [[2.5.02_fakturaauswertung|{{|Next}}]] | ||
| - | ====== 2.05.01 Earned Value Analysis ====== | + | ====== 2.05.01 Earned Value Chart ====== |
| The Earned Value Analysis report lists the planned and actual expenses (in hours or man-days) as well as the percentage of completion (progress to previous period) for a project over any period. The so-called earned value and other key figures (BCWS, ACWP and BCWP) are determined from this data. The special feature of Earned Value Analysis is that the BCWP is used for project assessment as the third variable of the same unit in addition to the planned and actual values. | The Earned Value Analysis report lists the planned and actual expenses (in hours or man-days) as well as the percentage of completion (progress to previous period) for a project over any period. The so-called earned value and other key figures (BCWS, ACWP and BCWP) are determined from this data. The special feature of Earned Value Analysis is that the BCWP is used for project assessment as the third variable of the same unit in addition to the planned and actual values. | ||
| - | {{:gui5:handbuch:kapitel_2:2.05.01-1.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.28.png?|}} |
| + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.39.png?|}} | ||
| The mask consists of the following elements: | The mask consists of the following elements: | ||
| - | On the "Input Data" tab: | ||
| ===== 1. Name ===== | ===== 1. Name ===== | ||
| - | * **Bezeichnung:** In diesem Feld wird die Bezeichnung der Auswertung definiert, falls diese gespeichert werden soll (beispielsweise für die [[gui5:handbuch:kapitel_2:2.01.03_system_-_zeitdienst|Zeitdienste]] oder zum Verwalten der Auswertungsergebnisse). | + | * **Name:** In this field the name of the evaluation is defined if it is to be saved (for example, for [[..:kapitel_2:2.01.03_system_-_zeitdienst|time services]] or to manage the evaluation results). |
| - | * **Auswertung:** Die Earned Value Analyse beinhaltet die Earned Value Analyse. Diese Auswertung generiert die Earned Value Analyse für ein ausgewähltes Projekt. Dabei werden periodisch die Planwerte, die Ist-Werte und der Fortschritt für die Projektstruktur oder weitere Kriterien abgetragen. Der Earned Value ergibt sich aus dem Fortschritt der Periode (Differenz vom Fertigstellungsgrad der betrachteten Periode zur Vorperiode) und dem Gesamtplanaufwand. Darüber hinaus werden hier die Kennzahlen BCWS, ACWP und BCWP bestimmt und die Ergebnisse in zwei Abbildungen visualisiert. | + | * **Evaluation:** The Earned Value Analysis contains the Earned Value Analysis. This evaluation generates the Earned Value Analysis for a selected project. The planned values, the actual values and the progress for the project structure or other criteria are deducted periodically. The earned value is calculated from the progress of the period (difference between the percentage of completion of the period under consideration and the previous period) and the total planned expenditure. The key figures BCWS, ACWP and BCWP are also determined here and the results are visualized in two figures. |
| - | * **Report-Zusammenstellung:** FIXME | + | * **Report Selection:** In this field the new report selection can be selected. |
| ===== 2. Input Data ===== | ===== 2. Input Data ===== | ||
| - | * **Profisuche:** Diese Auswahlbox ermöglicht die Verwendung von Profisuchen für die Eingabedaten der Auswertung. Diese [[gui5:handbuch:kapitel_3:3.05_bedienung_der_profi-suche|3.05 Bedienung der Profisuchen]] müssen sich allerdings die unterstützten Kategorien beziehen. | + | * **Professional Search:** This selection box allows you to use professional searches for the input data of the evaluation. However, this [[..:kapitel_3:3.05_bedienung_der_profi-suche|3.05 operation of the professional searches]] must refer to the supported categories. |
| - | * **Suchmaschine: Schnellsuche und Kategorie** - Dieses Element dient der Filterung der selektierten Daten aus den Kategorien. Als Auswahl zur Selektion steht nur der Dokumenttyp [[gui5:handbuch:kapitel_2:2.02.02_projekt|Projekt]] zur Verfügung. Die Bedienung der Suchmaschine wird auch in Abschnitt [[gui5:handbuch:kapitel_3:3.02.3_standard-arbeitsbereich| 3.02.03 Standard Arbeitsbereich]] beschrieben und kann hier ggf. mehrfach ausgeführt werden. | + | * **Search Engine:** Quick search and category - This element serves to filter the selected data from the categories. Only the document type [[..:kapitel_2:2.02.02_projekt|project]] is available for selection. The operation of the search engine is also described in section [[..:kapitel_3:3.02.3_standard-arbeitsbereich| 3.02.03 standard workspace]] and can be executed here several times if necessary. |
| - | * **Eingabedaten:** Unter diesem Feld sind die ausgewählten Selektionskriterien für die Auswertung aufgelistet. Diese Eingabedaten können aus der Profisuche, der Standard-Suchmaschine oder der persönlichen Ablage stammen. | + | * **Input Data:** The selected selection criteria for the evaluation are listed below this field. This input data can come from the professional search, the standard search engine or the personal folder. |
| ===== 3. Main Parameter ===== | ===== 3. Main Parameter ===== | ||
| - | * **Auswertungszeitraum:** Diese Auswahlbox bezieht sich auf den Auswertungszeitraum (Elemente Start und Ende) und ermöglicht für die Zeitdienste eine parametrisierte Definition des Zeitraumes. Diese Auswahl (Aktuelle Woche, Aktueller Monat, ..., Nächster Woche, Letzte Woche, ...) kann auch genutzt werden, um die manuelle Definition von Start und Ende zu vereinfachen. | + | * **Evaluation Period:** This selection box refers to the evaluation period (Start and End elements) and allows a parameterized definition of the period for the time services. This selection (Current week, Current month, ..., Next week, Last week, ...) can also be used to simplify the manual definition of start and end. |
| - | * **Start und Ende:** In diesen Feldern kann als Selektionskriterium ein Zeitintervall eingegeben werden, um den Betrachtungszeitraum für die Auswertung einzugrenzen. | + | * **Start and End:** In these fields, you can enter a time interval as a selection criterion to limit the analysis period for the evaluation. |
| - | {{:gui5:handbuch:kapitel_2:2.05.01-2.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.43.59.png?|}} |
| - | Auf dem Reiter "Parameter": | ||
| - | ===== 4. Other Criteria ===== | ||
| - | * **Periode:** In dieser Auswahlbox kann die Spalteneigenschaft für die tabellarische Auswertung gesteuert werden. Unter Berücksichtigung dieser Auswahl (wöchentlich, monatlich und quartalsweise) werden die Perioden für die Planwerte, Ist-Werte und Fortschritte generiert. | + | ===== 4. Other Criteria ===== |
| - | * **Fortschrittsberechnung:** In dieser Auswahlbox kann die Art der Fortschrittsberechnung ausgewählt werden. Die Option aus Planwerten bestimmt für das Gruppierungsmerkmal (siehe nächstes Element) den rechnerischen [[gui5:handbuch:kapitel_2:2.02.08_fertigstellungsgrad|Fertigstellungsgrad]] (Ist-Aufwand / Planaufwand), die Option aus Schätzungen im Projekt verwendet den Fertigstellungsgrad aus dem Projekt und die Option aus Schätzungen in der Zeiterfassung verwendet die Schätzungen aus den [[gui5:handbuch:kapitel_2:2.3.01_timetracker|TimeTracker]]. | + | |
| - | * **Gruppierung:** Diese Auswahl kann die Zeileneigenschaft für die tabellarische Auswertung gesteuert werden. Unter Berücksichtigung dieser Auswahl (nach Mitarbeiter, nach Phase, nach Tätigkeit und nach Unterprojekt) werden die Perioden für die Planwerte, Ist-Werte und Fortschritte generiert. | + | |
| - | * **Inkl. Oberprojekt:** Diese Checkbox kennzeichnet, ob bei der Option Gruppierung = nach Unterprojekt auch das Oberprojekt selber berücksichtigt werden soll. | + | |
| - | * **Arbeitsstunden/Tag:** Falls die nächste Option Als Personentage anzeigen verwendet wird, kann hier der Umrechnungsfaktor zwischen Arbeitsstunden und Personentagen eingetragen werden. | + | |
| - | * **Als Personentage anzeigen:** Wenn diese Option aktiv ist, werden alle Aufwände in der tabellarischen Auswertung als Personentage angezeigt (ansonsten als Stunden). | + | |
| - | * **Kosten anzeigen:** Wenn diese Option aktiv ist, werden alle Aufwände in der tabellarischen Auswertung als EUR-Beträge angezeigt (ansonsten als Stunden). | + | |
| - | {{:gui5:handbuch:kapitel_2:2.05.01-3.png|}} | + | * **Period:** In this selection box you can control the column property for the tabular evaluation. Taking this selection into account (weekly, monthly and quarterly), the periods for the plan values, actual values and progress are generated. |
| + | * **Progress Calculation:** In this selection box, you can choose the type of progress calculation. For the grouping characteristic (see next element), the option from plan values determines the calculated percentage of completion (actual expenditure / planned expenditure), the option from estimates in the project uses the [[..:kapitel_2:2.02.08_fertigstellungsgrad|percentage of completion]] from the project and the option from estimates in time recording uses the estimates from the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]]. | ||
| + | * **Grouping:** This selection can be used to control the row property for the tabular evaluation. Taking this selection into account (by employee, by phase, by activity and by sub-project), the periods for the planned values, actual values and progress are generated. | ||
| + | * **Incl. Top Project:** This checkbox indicates whether the option Grouping = by subproject should also consider the top project itself. | ||
| + | * **Working Hours/Day:** If the next option Show as person days is used, the conversion factor between working hours and person days can be entered here. | ||
| + | * **Show as Person Days:** If this option is active, all efforts are displayed as person days in the tabular evaluation (otherwise as hours). | ||
| + | * **Display Costs:** If this option is active, all expenses are displayed in the tabular evaluation as EUR amounts (otherwise as hours). | ||
| - | Auf dem Reiter "Format": | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.44.07.png?|}} |
| ===== 5. View Settings ===== | ===== 5. View Settings ===== | ||
| - | * **Breite:** Mit diesem Feld wird die Breite in Pixel (px) der graphischen Auswertung festgelegt. | + | * **Width:** This field defines the width in pixels (px) of the graphic evaluation. |
| - | * **Höhe:** Mit diesem Feld wird die Höhe in Pixel (px) der graphischen Auswertung festgelegt. | + | * **Height:** This field defines the height in pixels (px) of the graphic evaluation. |
| - | * **Display:** Mit Hilfe dieser Auswahl kann die erzeugte Auswertung in verschiedenen Formaten erzeugt werden. Unterstützt werden CHART (nur graphische Auswertung), CSV, HTML (Standardeinstellung), PDF, RTF (Textverarbeitung) und, XLS (MS Excel). | + | * **Display:** With the help of this selection the generated evaluation can be generated in different formats. Supported formats are CHART (only graphic evaluation), CSV, HTML (default setting), PDF, RTF (word processing) and XLS (MS Excel). |
| - | * **Auswertungsparameter anzeigen:** Hier wird markiert, ob die Auswertungsparameter angezeigt werden. | + | * **Display Evaluation:** Here you can select whether the evaluation parameters are to be displayed. |
| - | {{:gui5:handbuch:kapitel_2:2.05.01-4.png|}} | + | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-06-11_um_13.44.11.png?|}} |
| - | On the tab "results": | ||
| ===== 6. Results ===== | ===== 6. Results ===== | ||
| This tab contains the maximum number of results and the results of evaluations already performed. | This tab contains the maximum number of results and the results of evaluations already performed. | ||