User Tools

Site Tools


en:gui5:handbuch:kapitel_2:2.3.01_timetracker

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:gui5:handbuch:kapitel_2:2.3.01_timetracker [2020/02/26 09:26]
peter
en:gui5:handbuch:kapitel_2:2.3.01_timetracker [2020/10/09 13:07] (current)
alexandra
Line 5: Line 5:
  
  
-{{:​gui5:​handbuch:​kapitel_2:​2.03.01.png}}+{{:en:​gui5:​handbuch:​kapitel_2:​bildschirmfoto_2020-10-09_um_13.06.28.png|}}
  
 The upper area of the TimeTrackers is used for the tabular recording of daily working time and/or project working time. The "​coming"​ and "​going"​ times and the work performed (that is, times on work packages) are recorded. For the recording either a time interval or the duration of the interval must be entered. After entering the times, select either a work package or "​Clock-in"/"​Clock-out"​ from the selection box and confirm the entry with the Save button. The upper and lower sections contain the following buttons: The upper area of the TimeTrackers is used for the tabular recording of daily working time and/or project working time. The "​coming"​ and "​going"​ times and the work performed (that is, times on work packages) are recorded. For the recording either a time interval or the duration of the interval must be entered. After entering the times, select either a work package or "​Clock-in"/"​Clock-out"​ from the selection box and confirm the entry with the Save button. The upper and lower sections contain the following buttons:
Line 14: Line 14:
     * **Close Work Package:** {{:​gui5:​handbuch:​kapitel_2:​arbeitspaket.gif|}} Use this button to close the work package.     * **Close Work Package:** {{:​gui5:​handbuch:​kapitel_2:​arbeitspaket.gif|}} Use this button to close the work package.
     * **Start Work Package:** {{:​gui5:​handbuch:​kapitel_2:​clock_go.png|}} Click this button to start the work package.     * **Start Work Package:** {{:​gui5:​handbuch:​kapitel_2:​clock_go.png|}} Click this button to start the work package.
-  
-Die Datumsauswahl bietet die Möglichkeit,​ Zeiten für andere Tage zu erfassen. Das Filtermenü ermöglicht die Auswahl, die angezeigten Arbeitspakete nach einem bestimmten Projekt oder Kontakt zu filtern. 
  
-Der untere Bereich des TimeTrackers dient der Zeiterfassung von Arbeitspaketzeiten mit einer Stoppuhrfunktionalität und kann als ToDo-Liste verwendet werden (Abbildung oben ist eine Beispielkonfiguration):​+The date selection offers the possibility to record times for other days. The filter menu allows you to filter the displayed work packages according to a specific project or contact.
  
-    ​* **Status:​** ​Mit dem Status ​-Start- ​und -Stop- ​wird das aktivieren und deaktivieren der Stoppuhr gekennzeichnet+The lower area of the TimeTrackers is used for time tracking of work package times with a stopwatch functionality and can be used as a to-do list (figure above is an example configuration): ​    
-    * **Nummer:** Diese Spalte kennzeichnet die ArbeitspaketnummerDurch Anklicken des Sortieren-Symbols werden die Arbeitspakete nach der Nummer auf- bzwabsteigend sortiert. Diese Funktionalität steht für jede Spalte dieses Bereiches zur Verfügung+ 
-    * **Arbeitspaket:** Diese Spalte kennzeichnet die Arbeitspakete ggf. mit Link auf das Arbeitspaket+    ​* **Status:​** ​The status ​-Start- ​and -Stop- ​indicates the activation and deactivation of the stopwatch
-    * **Projekt:** Diese Spalte kennzeichnet das Projekt zu dem das Arbeitspaket gehört+    * **Number:** This column indicates the work package numberBy clicking on the sort symbol, the work packages are sorted in ascending or descending order by numberThis functionality is available for each column of this area  ​ 
-    * **Auftraggeber:** Diese Spalte kennzeichnet den Kunden des Arbeitspaketes+    * **Work Package:** This column marks the work packages with a link to the work package, if applicable
-    * **Fälligkeit:** Diese Spalte kennzeichnet die Fälligkeit des ArbeitspaketesMit der Fälligkeit ist das Datum des Plan-Endes vom Arbeitspaket gemeint+    * **Project:** This column indicates the project to which the work package belongs
-    * **Plan-Aufwand:** Diese Spalte kennzeichnet die Dauer des Arbeitspaketes+    * **Costumer:** This column indicates the customer of the work package
-    * **Ist-Aufwand:** Diese Spalte kennzeichnet die Gesamtzeit der Arbeitspakete+    * **Due Date:** This column indicates the due date of the work packageThe due date is the date of the plan end of the work package
-    * **Fertigstellung ​[%]:** In dieser Spalte kann der Fertigstellungsgrad des Arbeitspaketes geschätzt werdenNach Abspeichern des Wertes wird automatisch vom System der Restaufwand ​in Stunden bestimmt+    * **Plan ​Effort:** This column indicates the duration of the work package
-    * **Rest [h]:** In dieser Spalte kann der Restaufwand ​in Stunden für das Arbeitspaket geschätzt werdenNach Abspeichern des Wertes wird automatisch vom System der Fertigstellungsgrad bestimmt.+    * **Actual Effort:** This column indicates the total time of the work packages
 +    * **Completion ​[%]:** In this column, you can estimate the degree of completion of the work packageWhen you save the value, the system automatically determines the remaining time in hours
 +    * **Remaining ​[h]:** In this column, you can estimate the remaining time in hours for the work packageWhen you save the value, the system automatically determines the percentage of completion.
en/gui5/handbuch/kapitel_2/2.3.01_timetracker.1582705604.txt.gz · Last modified: 2020/02/26 09:26 by peter