User Tools

Site Tools


en:gui5:handbuch:kapitel_2:2.02.03_vorgang

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:gui5:handbuch:kapitel_2:2.02.03_vorgang [2021/12/01 14:40]
alexandra [Status]
en:gui5:handbuch:kapitel_2:2.02.03_vorgang [2021/12/01 14:43] (current)
alexandra [2.02.02 Process]
Line 2: Line 2:
 ====== 2.02.02 Process ====== ====== 2.02.02 Process ======
  
-The Process mask manages the tasks of the projects. In projectile, operations are the grouping of [[..:​kapitel_2:​2.02.04_arbeitspaket|work packages]]. This mask shows the activity, the period and the expenses (plan, target, actual, rest, billable, invoiced).+The Process mask manages the tasks of the projects. In projectile, operations are the grouping of [[..:​kapitel_2:​2.02.04_arbeitspaket|jobs]]. This mask shows the activity, the period and the expenses (plan, target, actual, rest, billable, invoiced).
  
 The mask consists of the following elements: The mask consists of the following elements:
Line 30: Line 30:
  
        
-      * **Target Time:** In this field, the estimated net time expenditure of the operation is defined. The cumulated planned values of all activities in a project are the basis for costing ​and controlling (planned/​actual comparisons).+      ​ 
 + 
 +      ​* **Target Time:** In this field, the estimated net time expenditure of the operation is defined. The cumulated planned values of all activities in a project are the basis for cost and controlling (planned/​actual comparisons).
       * **Planning Time:** This field is determined by the system during planning and defines the estimated project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "​advance work" or "​active"​),​ this value is not changed.       * **Planning Time:** This field is determined by the system during planning and defines the estimated project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "​advance work" or "​active"​),​ this value is not changed.
       * **Actual Time:** The content of this field shows how many hours have been posted to this task in the [[..:​kapitel_2:​2.3.01_timetracker|time recording component]] ​ so far.       * **Actual Time:** The content of this field shows how many hours have been posted to this task in the [[..:​kapitel_2:​2.3.01_timetracker|time recording component]] ​ so far.