This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:gui5:handbuch:kapitel_2:2.02.02_projekt [2021/12/01 14:34] alexandra [Misc] |
en:gui5:handbuch:kapitel_2:2.02.02_projekt [2021/12/14 11:23] (current) alexandra [Portfolio] |
||
---|---|---|---|
Line 74: | Line 74: | ||
* **Complexity:** | * **Complexity:** | ||
- | * **Order Volume:** FIXME | + | * **Order Volume:** What is the order volume for the project? |
- | * **Number of External Contacts:** FIXME | + | * **Number of External Contacts:** How many contact person does the company have? |
- | * **Contact Type:** FIXME | + | * **Contract Type:** The contract liability level. |
- | * **Number of Suppliers:** FIXME | + | * **Number of Suppliers:** How many suppliers does the project have? |
- | * **Risk Probability:** FIXME | + | * **Risk Probability:** What is the likely risk for the project? |
- | * **Project Effort:** FIXME | + | * **Project Effort:** How big is the effort for this project? Approximately how many days are needed? |
- | * **Number of Employees:** FIXME | + | * **Number of Employees:** How many employees are needed for the project? |
- | * **Relevance:** FIXME | + | * **Relevance:** The importance of the project for the company. |
- | * **Complexity:** FIXME | + | * **Complexity:** These parameters determine the complexity of the project. |
- | * **Tailoring:** FIXME | + | * **Tailoring:** If a tailoring was created for this project, this field contains a link to show the tailoring. Tailorings can be created via Actions > Administration > Create tailoring. |
=====Risk Assessment===== | =====Risk Assessment===== | ||
Line 112: | Line 112: | ||
* **Target Time:** This field is determined by the system during planning and defines the expected project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "advance work" or "active"), this value is not changed. | * **Target Time:** This field is determined by the system during planning and defines the expected project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "advance work" or "active"), this value is not changed. | ||
* **Planning Time:** This field defines the expected project duration. This field is either determined automatically according to the [[..:kapitel_a:glossar#ButtomUp-Prinzip|ButtomUp principle]] or is specified by the user in [[..:kapitel_a:glossar#TopDown-Planung|Top-Down planning]]. This value is identical to the planned effort until the status changes to "Advance work" or "active". | * **Planning Time:** This field defines the expected project duration. This field is either determined automatically according to the [[..:kapitel_a:glossar#ButtomUp-Prinzip|ButtomUp principle]] or is specified by the user in [[..:kapitel_a:glossar#TopDown-Planung|Top-Down planning]]. This value is identical to the planned effort until the status changes to "Advance work" or "active". | ||
- | * **Periodic Planning Time:** FIXME | + | * **Periodic Planning Time:** The current plan costs from the schedule. |
* **Actual Time:** This field contains the recorded times for the assigned project. These actual efforts are transferred to the projects and [[..:kapitel_2:2.02.04_arbeitspaket|work packages]] each time a change is made in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] recording component. | * **Actual Time:** This field contains the recorded times for the assigned project. These actual efforts are transferred to the projects and [[..:kapitel_2:2.02.04_arbeitspaket|work packages]] each time a change is made in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] recording component. | ||
* **Billable Time:** This field contains the billable effort for the assigned project. | * **Billable Time:** This field contains the billable effort for the assigned project. | ||
* **Billed Time:** This field contains the billed times for the assigned project. These billed times are transferred to the projects and work packages each time the invoice is issued or cancelled. | * **Billed Time:** This field contains the billed times for the assigned project. These billed times are transferred to the projects and work packages each time the invoice is issued or cancelled. | ||
* **Estimated Remaining Effort:** This field shows the last remaining effort estimate entered minus the subsequently entered effort. | * **Estimated Remaining Effort:** This field shows the last remaining effort estimate entered minus the subsequently entered effort. | ||
- | * **LastTrackingRestriction:** FIXME | + | * **LastTrackingRestriction:** Tracking of cost for this project is not allowed before this date. |
* **Figures:** | * **Figures:** | ||
- | * **Offer Value:** FIXME | + | * **Offer Value:** The sum of the completed offer. |
- | * **OrderConfirmationTracked:** FIXME | + | * **OrderConfirmationTracked:** The sum of the completed order. |
- | * **TurnoverContractPlanned:** FIXME | + | * **TurnoverContractPlanned:** The forecast based on contracts. Depending on the type of contract, compiled from milestones, payment schedule or the sum of plan expenses * external hourly rate plus all costs. |
- | * **TurnoverChargeable:** FIXME | + | * **TurnoverChargeable:** The sum of actual expenses * external hourly rate in addition to all costs. |
- | * **TurnoverTrackedProject:** FIXME | + | * **TurnoverTrackedProject:** The sum of the completed invoices. |
- | * **Total Costs:** FIXME | + | * **Total Costs:** The sum of planned expenses * internal hourly rate + internal other budgets. |
- | * **Actual Costs:** FIXME | + | * **Actual Costs:** The sum of actual expenses * internal hourly rate + other expenses (drive, travel, receipts, item sales, incoming invoices). |
- | * **LeftoverBudget:**FIXME | + | * **LeftoverBudget:** The difference between total costs and actual costs (total costs - actual costs). |
- | * **OrderValueNet:** FIXME | + | * **OrderValueNet:** The sum of the completed order positions. |
- | * **IncomingInvoiceNet:** FIXME | + | * **IncomingInvoiceNet:** The sum of the completed incoming invoice positions. |
- | * **ExternLeftoverBudget:** FIXME | + | * **ExternLeftoverBudget:** The difference between OrderValueNet and IncomingInvoiceNet (OrderValueNet - ExternLeftoverBudget). |
* **EVA:** | * **EVA:** | ||
- | * **CPI:** FIXME | + | * **CPI:** The cost-based performance measure of earned value analysis. It is formed from the ratio of earned value and planned expense. This means that if the CPI is greater than 1, the project results were delivered at less cost than originally planned, while a value less than 1 means the budget is overdrawn. |
- | * **SPI:** FIXME | + | * **SPI:** The time-based performance measure of earned value analysis. It is formed from the ratio between earned value and planned expense. This means that if the SPI is greater than 1, the project results were delivered faster than planned. If the number is less than 1, the project is progressing too slowly. |
=====Calculation===== | =====Calculation===== | ||
Line 189: | Line 189: | ||
* **Technical Details:** | * **Technical Details:** | ||
* **Key:** This numeric field uniquely identifies the project. This number is proposed by the system. | * **Key:** This numeric field uniquely identifies the project. This number is proposed by the system. | ||
- | * **Sales Pipeline:** FIXME | + | * **Sales Pipeline:** The sales activity related to this project. |
* **Indicators for Tracking and Reporting:** | * **Indicators for Tracking and Reporting:** |