Line 74: | Line 74: | ||
* **Complexity:** | * **Complexity:** | ||
- | * **Order Volume:** FIXME | + | * **Order Volume:** What is the order volume for the project? |
- | * **Number of External Contacts:** FIXME | + | * **Number of External Contacts:** How many contact person does the company have? |
- | * **Contact Type:** FIXME | + | * **Contract Type:** The contract liability level. |
- | * **Number of Suppliers:** FIXME | + | * **Number of Suppliers:** How many suppliers does the project have? |
- | * **Risk Probability:** FIXME | + | * **Risk Probability:** What is the likely risk for the project? |
- | * **Project Effort:** FIXME | + | * **Project Effort:** How big is the effort for this project? Approximately how many days are needed? |
- | * **Number of Employees:** FIXME | + | * **Number of Employees:** How many employees are needed for the project? |
- | * **Relevance:** FIXME | + | * **Relevance:** The importance of the project for the company. |
- | * **Complexity:** FIXME | + | * **Complexity:** These parameters determine the complexity of the project. |
- | * **Tailoring:** FIXME | + | * **Tailoring:** If a tailoring was created for this project, this field contains a link to show the tailoring. Tailorings can be created via Actions > Administration > Create tailoring. |
=====Risk Assessment===== | =====Risk Assessment===== | ||
Line 102: | Line 102: | ||
* **Status Reports:** Status reports are an important part of project management and project controlling. They document the progress of the project plan. The status report often contains status information about dates, costs and quality (sometimes also other information), reasons, progress information (expected project end, remaining costs, ...). | * **Status Reports:** Status reports are an important part of project management and project controlling. They document the progress of the project plan. The status report often contains status information about dates, costs and quality (sometimes also other information), reasons, progress information (expected project end, remaining costs, ...). | ||
* **Project Change Requests:**In project change management, a change request is a formalized request to change the properties of a specific product feature. The change request often contains the participants/responsible persons, the priority, a categorization and the quantitative effects (effort, costs, sales, ...) on the project. | * **Project Change Requests:**In project change management, a change request is a formalized request to change the properties of a specific product feature. The change request often contains the participants/responsible persons, the priority, a categorization and the quantitative effects (effort, costs, sales, ...) on the project. | ||
- | * **Fertigstellungsgrade:** Here the project manager can regularly enter the degrees of completion of the project (for example for controlling or POC valuation). | + | * **Estimates:** Here the project manager can regularly enter the degrees of completion of the project (for example for controlling or POC valuation). |
- | * **Risiken:** Here (if the Risk Management module is enabled) the risks are displayed. | + | * **Risks:** Here (if the Risk Management module is enabled) the risks are displayed. |
=====Key Figures===== | =====Key Figures===== | ||
Line 110: | Line 110: | ||
* **Expenses:** | * **Expenses:** | ||
- | * **Target Expenditure:** This field is determined by the system during planning and defines the expected project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "advance work" or "active"), this value is not changed. | + | * **Target Time:** This field is determined by the system during planning and defines the expected project duration in hours or days. During planning, this value is updated (analogous to planned effort) and when planning is completed (status transition to "advance work" or "active"), this value is not changed. |
- | * **Plan Effort:** This field defines the expected project duration. This field is either determined automatically according to the [[..:kapitel_a:glossar#ButtomUp-Prinzip|ButtomUp principle]] or is specified by the user in [[..:kapitel_a:glossar#TopDown-Planung|Top-Down planning]]. This value is identical to the planned effort until the status changes to "Advance work" or "active". | + | * **Planning Time:** This field defines the expected project duration. This field is either determined automatically according to the [[..:kapitel_a:glossar#ButtomUp-Prinzip|ButtomUp principle]] or is specified by the user in [[..:kapitel_a:glossar#TopDown-Planung|Top-Down planning]]. This value is identical to the planned effort until the status changes to "Advance work" or "active". |
- | * **Actual Effort:** This field contains the recorded times for the assigned project. These actual efforts are transferred to the projects and [[..:kapitel_2:2.02.04_arbeitspaket|work packages]] each time a change is made in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] recording component. | + | * **Periodic Planning Time:** The current plan costs from the schedule. |
- | * **Billable Effort:** This field contains the billable effort for the assigned project. | + | * **Actual Time:** This field contains the recorded times for the assigned project. These actual efforts are transferred to the projects and [[..:kapitel_2:2.02.04_arbeitspaket|work packages]] each time a change is made in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] recording component. |
- | * **Billed Effort:** This field contains the billed times for the assigned project. These billed times are transferred to the projects and work packages each time the invoice is issued or cancelled. | + | * **Billable Time:** This field contains the billable effort for the assigned project. |
- | * **Expected Remaining Effort:** This field shows the last remaining effort estimate entered minus the subsequently entered effort. | + | * **Billed Time:** This field contains the billed times for the assigned project. These billed times are transferred to the projects and work packages each time the invoice is issued or cancelled. |
+ | * **Estimated Remaining Effort:** This field shows the last remaining effort estimate entered minus the subsequently entered effort. | ||
+ | * **LastTrackingRestriction:** Tracking of cost for this project is not allowed before this date. | ||
+ | |||
+ | * **Figures:** | ||
+ | * **Offer Value:** The sum of the completed offer. | ||
+ | * **OrderConfirmationTracked:** The sum of the completed order. | ||
+ | * **TurnoverContractPlanned:** The forecast based on contracts. Depending on the type of contract, compiled from milestones, payment schedule or the sum of plan expenses * external hourly rate plus all costs. | ||
+ | * **TurnoverChargeable:** The sum of actual expenses * external hourly rate in addition to all costs. | ||
+ | * **TurnoverTrackedProject:** The sum of the completed invoices. | ||
+ | * **Total Costs:** The sum of planned expenses * internal hourly rate + internal other budgets. | ||
+ | * **Actual Costs:** The sum of actual expenses * internal hourly rate + other expenses (drive, travel, receipts, item sales, incoming invoices). | ||
+ | * **LeftoverBudget:** The difference between total costs and actual costs (total costs - actual costs). | ||
+ | * **OrderValueNet:** The sum of the completed order positions. | ||
+ | * **IncomingInvoiceNet:** The sum of the completed incoming invoice positions. | ||
+ | * **ExternLeftoverBudget:** The difference between OrderValueNet and IncomingInvoiceNet (OrderValueNet - ExternLeftoverBudget). | ||
+ | |||
+ | * **EVA:** | ||
+ | * **CPI:** The cost-based performance measure of earned value analysis. It is formed from the ratio of earned value and planned expense. This means that if the CPI is greater than 1, the project results were delivered at less cost than originally planned, while a value less than 1 means the budget is overdrawn. | ||
+ | * **SPI:** The time-based performance measure of earned value analysis. It is formed from the ratio between earned value and planned expense. This means that if the SPI is greater than 1, the project results were delivered faster than planned. If the number is less than 1, the project is progressing too slowly. | ||
=====Calculation===== | =====Calculation===== | ||
Line 132: | Line 151: | ||
{{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.15.36.png?|}} | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.15.36.png?|}} | ||
- | |||
- | * **Order Data:** | ||
- | * **Order Number**, **Order Date:** The order number and order date of the project can be entered here. This order data can be used for the invoice printout. The order number and the order date are automatically transmitted by the system when an [[..:kapitel_2:2.4.03_auftragsbestaetigung|order confirmation]] is accepted in a defined way. | ||
- | * **Order Value:** This field can be used to define the fixed price (maximum upper limit of all invoices for this project). If this order value is defined here, the automatically determined value Planned Sales represents only the theoretical project budget, based on the planned values from the [[..:kapitel_2:2.02.04_arbeitspaket|work packages]] and [[..:kapitel_2:2.02.09_budget|budget management]]. The order value is transferred automatically by the system when an [[..:kapitel_2:2.4.03_auftragsbestaetigung|orer confirmation]] is transferred in a defined form. | ||
- | * **Incoming Order:** The type of incoming order (fax, letter, e-mail, ...) can be entered here. | ||
- | * **Discount:** Here it can be noted whether the customer receives a discount. | ||
- | * **Cash Discount:** This field indicates whether the customer receives a discount if he pays the amount immediately. | ||
* **Travel Expense Regulation:** | * **Travel Expense Regulation:** | ||
- | * **Travel Expense Settlement Type**, **Travel Expense Flat Rate** and **Travel Expense Flat Rate per day:** Here you can store the defaults for the settlement of the project's trips (no settlement, per diem, by expense). You can change these default settings per trip. | + | * **T&E Billing Type**, **T&E Flat Rate** and **T&E Daily Flat Rate:** Here you can store the defaults for the settlement of the project's trips (no settlement, per diem, by expense). You can change these default settings per trip. |
* **Currencies and Rates:** | * **Currencies and Rates:** | ||
* **Currency:** The currency field indicates the project currency. The project currency overwrites the general system currency (see also [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]]) and the customer currency (see also [[..:kapitel_2:2.01.13_basic_-_kontakt|Contact]]). This field is defaulted with the currency from the [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]] mask. After selecting a customer, the local currency from the configuration is changed by the customer currency if necessary. The currencies can be defined and changed in the screen [[..:kapitel_2:2.01.06_key_-_waehrung|currency]]. | * **Currency:** The currency field indicates the project currency. The project currency overwrites the general system currency (see also [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]]) and the customer currency (see also [[..:kapitel_2:2.01.13_basic_-_kontakt|Contact]]). This field is defaulted with the currency from the [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]] mask. After selecting a customer, the local currency from the configuration is changed by the customer currency if necessary. The currencies can be defined and changed in the screen [[..:kapitel_2:2.01.06_key_-_waehrung|currency]]. | ||
* **Exchange Rate:** After selecting a project currency, the Exchange rate field is automatically preset with the valid exchange rate of the project currency to the local currency (see also [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]]). Here you can also define a different project exchange rate (e.g. for international projects where the currency risk is to be minimized). This exchange rate is also binding for quotations and invoices. The exchange rates are managed in the [[..:kapitel_2:2.01.07_key_-_kurs|exchange rate]] mask. | * **Exchange Rate:** After selecting a project currency, the Exchange rate field is automatically preset with the valid exchange rate of the project currency to the local currency (see also [[..:kapitel_2:2.01.01_system_-_konfiguration|configuration]]). Here you can also define a different project exchange rate (e.g. for international projects where the currency risk is to be minimized). This exchange rate is also binding for quotations and invoices. The exchange rates are managed in the [[..:kapitel_2:2.01.07_key_-_kurs|exchange rate]] mask. | ||
- | * **External Hourly Rate (fixed and variable):** These fields indicate the general hourly rate (fixed or variable) for further calculation for the defined project. If this field is filled (and the corresponding field in the work package is not), all work activities are charged with this rate and the system no longer takes into account the rates from the masks [[..:kapitel_2:2.01.13_basic_-_kontakt|contact]], [[..:kapitel_2:2.01.24_basic_-_mitarbeiter|employees]] or [[..:kapitel_2:2.01.23_basic_-_taetigkeit|activities]] (see also [[..:kapitel_a:glossar#Preisfindung|pricing]]). The variable rate is higher than the fixed hourly rate. | + | * **External Hourly Rate (fixed and time-related):** These fields indicate the general hourly rate (fixed or variable) for further calculation for the defined project. If this field is filled (and the corresponding field in the work package is not), all work activities are charged with this rate and the system no longer takes into account the rates from the masks [[..:kapitel_2:2.01.13_basic_-_kontakt|contact]], [[..:kapitel_2:2.01.24_basic_-_mitarbeiter|employees]] or [[..:kapitel_2:2.01.23_basic_-_taetigkeit|activities]] (see also [[..:kapitel_a:glossar#Preisfindung|pricing]]). The variable rate is higher than the fixed hourly rate. |
Line 154: | Line 166: | ||
{{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.16.31.png?|}} | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.16.31.png?|}} | ||
- | * **Actions:** In this field, projectations can be entered or assigned. | + | * **Customer Actions:** In this field, actions can be entered or assigned. |
* **Meetings:** This field allows to enter or assign meetings. | * **Meetings:** This field allows to enter or assign meetings. | ||
- | * **Action List:** This field allows the entry of events. | + | * **Decisions:** This field allows the entry of decisions. |
- | * **ext. Documentation:** If the flyer is available, external files can be assigned here. | + | * **Risks:** This field allows the entry of risks. |
+ | * **External Documentations:** If the flyer is available, external files (like Project Acceptance, Documentations and Invoices) can be assigned here. | ||
=====Final Report===== | =====Final Report===== | ||
Line 163: | Line 176: | ||
{{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.17.11.png?|}} | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.17.11.png?|}} | ||
- | * **Creator & Summary:** A summary of the final report (Project Closing Document - PCD) can be stored here. | + | * **Creator & Overview:** A summary of the final report (Project Closing Document - PCD) can be stored here. |
* **Description of the Individual Points:** Detailed information for the PCD can be entered here. | * **Description of the Individual Points:** Detailed information for the PCD can be entered here. | ||
* **Lessons Learned:** Lessons Learned can be entered here, which can also be viewed by users without access to the project. | * **Lessons Learned:** Lessons Learned can be entered here, which can also be viewed by users without access to the project. | ||
Line 174: | Line 187: | ||
{{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.17.52.png?|}} | {{:en:gui5:handbuch:kapitel_2:bildschirmfoto_2021-09-29_um_13.17.52.png?|}} | ||
- | * **Technical Setting & Details:** | + | * **Technical Details:** |
- | * **int. Key:** This numeric field uniquely identifies the project. This number is proposed by the system. | + | * **Key:** This numeric field uniquely identifies the project. This number is proposed by the system. |
- | * **Offer Value:** The total of all bid values for the project is stored here (net). | + | * **Sales Pipeline:** The sales activity related to this project. |
- | * **Invoice Value:** The total of all invoice values of the project is stored here (net). | + | |
- | * **Indicators for Recording and Reporting:** | + | * **Indicators for Tracking and Reporting:** |
- | * **Operational Activity:** This indicator controls the properties of the project work packages. This indicator is an evaluation criterion in capacity evaluations and is used, for example, for internal projects or permanent projects so that these projects are not taken into account when calculating the workload of employees. | + | * **Production Effort:** This indicator controls the properties of the project work packages. This indicator is an evaluation criterion in capacity evaluations and is used, for example, for internal projects or permanent projects so that these projects are not taken into account when calculating the workload of employees. |
- | * **Total of Work Packages in the Activity cannot be Overbooked::** This indicator controls the properties of the activities in the project. If the indicator is set, you can only record in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] on the activity (or the total of the assigned work packages) as long as the planned effort is not exceeded. | + | * **Not Overbookable:** This indicator controls the properties of the activities in the project. If the indicator is set, you can only record in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] on the activity (or the total of the assigned work packages) as long as the planned effort is not exceeded. |
- | * **Work Packages cannot be Overbooked:** This indicator controls the properties of the project work packages. If the indicator is set, you can only enter data in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] for the work package as long as the planned effort has not been exceeded. | + | * **Jobs not Overbookable:** This indicator controls the properties of the project work packages. If the indicator is set, you can only enter data in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] for the work package as long as the planned effort has not been exceeded. |
- | * **Time Recording only after the Start of the Plan:** This indicator controls the properties of the project work packages. If the indicator is set, you can only record time in the work package in the time tracker if the start of the work package has been reached. | + | * **Limit Time Tracking to Estimated Begin Date:** This indicator controls the properties of the project work packages. If the indicator is set, you can only record time in the work package in the time tracker if the start of the work package has been reached. |
- | * **Time Recording only before End of Plan:** This indicator controls the properties of the project work packages. If the indicator is set, you can only record time in the work package's time tracker as long as the end of the work package has not been reached. | + | * **Limit Time Tracking to Estimated End Date:** This indicator controls the properties of the project work packages. If the indicator is set, you can only record time in the work package's time tracker as long as the end of the work package has not been reached. |
- | * **Project not Overbookable:** This indicator controls the properties of the project work packages. If the indicator is set, data can only be entered in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] for the work packages of the project as long as the planned effort of the project is not exceeded. | + | * **Limit Time to Estimated Time Project:** This indicator controls the properties of the project jobs. If the indicator is set, data can only be entered in the [[..:kapitel_2:2.3.01_timetracker|TimeTracker]] for the jobs of the project as long as the planned effort of the project is not exceeded. |
* **Check Indicators:** | * **Check Indicators:** | ||
- | * **Checked on**, **Checked on Key Date:** The check date of the project and the key date of the check can be entered in these fields. | + | * **Last Checked**, **Auditdate:** The check date of the project and the key date of the check can be entered in these fields. |
- | * **Last Status Change to Passive, Active or Completed:** The most important status changes are listed here (passive - entered, active/preliminary work, completed/cancelled). The complete history of all status changes can be found in the menu item "View - Show Event Log". | + | * **Last Status Change to Passive, Active or Closed:** The most important status changes are listed here (passive - entered, active/preliminary work, completed/cancelled). The complete history of all status changes can be found in the menu item "View - Show Event Log". |